0532_A_HTLT_Freshwater_System_Flush.doc

DOC document 52 KB Posted

Attached to
USNS WASHINGTON CHAMBERS ROH/DD Federal contract opportunity
Solicitation number
N32205-18-R-4259
Issued by
Department of the Navy Military Sealift Command

About this file

Not Listed

View the file

Other files for this federal contract opportunity

Other files attached to USNS WASHINGTON CHAMBERS ROH/DD, newest first.
File Type Posted
ROH_AMENDMENT_UNSN_CHAMBERS.docx DOCX document
Chambers_ROH_Amendment_0006.docx DOCX document
0606_Flight_Deck_Non-Skid_Renewal_Rev_-_(CSI)_REV_2.doc DOC document
0030_B_Continution_of_Services_REV_1.doc DOC document
0621_B_Replace_Deck_Covering_in_Various_Heads_(VR17-024)REV_1.doc DOC document
Chamber_ROH_Amendment_0005.docx DOCX document
0532_A_HTLT_Freshwater_System_Flush_REV_1.doc DOC document
0606_Flight_Deck_Non-Skid_Renewal_Rev_-_(CSI)_REV_1.doc DOC document
J_-_2_Category_A_Items_CHAMBERS.xls XLS spreadsheet
Chambers_ROH_Amendment_0005.docx DOCX document
BQ_-_0007_WI_802_GFS_scope_Response.doc DOC document
8394521_-SaWS_Support_-_Mechanical_Dwg.pdf PDF
SAWS_INSTL_LIST_OF_CONNECTIONS_439-8394524.pdf PDF
BQ_-_0006_WI_531_Dwgs_Response.doc DOC document
0214_8_Cylinder_Main_Diesel_Engine_24000_Hour_Scheduled_Maintenance_(CSI).doc DOC document
Questions_and_Answers.docx DOCX document
0503_Self_Contained_Breathing_Appratus_(SCBA)_Air_Compressor_and_Re-Filling_Station_Inspection_and_Maintenance_Rev_-_(CSI).doc.doc DOC document
USNS_Chambers_ROH_Solicitation_0004.docx DOCX document
USNS_Chambers_ROH_Solicitation_0004.docx DOCX document
J_-_2_Category_A_Items_CHAMBERS_-_REV_1.xls XLS spreadsheet
0012_Information_Technology_Services_Rev_16July18.doc DOC document
0021__Clean_and_Gas_Free_Tanks_Voids_Cofferdams_and_Spaces.doc.doc DOC document
0010_Furnish_Office_for_Overhaul_Management_Team(OMT)_Rev16July18.doc DOC document
N3220518R4259_Amendment_0003.docx DOCX document
0916_Underwater_Hull_Blast_&_Paint_(Spot_Blast)-_REV_(1).docx DOCX document
N3220518R4259_AMENDMENT_0002.docx DOCX document
USNS_CHAMBERS_ROH_AMENDMENT.docx DOCX document
USNS_CHAMBERS_ROH.docx DOCX document
CDRLS.zip ZIP file
J_Attachments_and_GFM.zip ZIP file
USNS_WASHINGTON_CHAMBERS_ROH.docx DOCX document
J_&_A_N32205-18-Q-4259_Redacted.pdf PDF
SYNOPSIS_N32205-18-R-4259.docx DOCX document
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS Chambers

( TAKE 11 )

AUXILIARY MACHINERY
CONTRACT NO. N32205-18-R-4259
ITEM NO. 0532
CATEGORY "A"
2018-09-10
HTLT Freshwater System Flush
Escobar, Daniel

1.0

ABSTRACT

This item describes flushing High Temperature (HTFW), Low Temperature Freshwater(LTFW) Cooling Systems 2.0

REFERENCES

2.1 MSC Dwg. No. 256-8499057; Central Seawater Cooling System Diagram

2.2 MSC Dwg. No. 532-8499061; Diesel Generator High Temperature Freshwater Cooling System Diagram

2.3 MSC Dwg. No. 532-8499083; Low Temperature Freshwater Cooling System Diagram

2.4 Drew Marine Flushing Procedure – Maxigard to Liquidewt

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity

3.1.1 Main Machinery Room (MMR)

3.1.2 Auxiliary Machinery Room (AMR)

3.1.3 System Capacities:

HTFW ≈ 2500 Gallons

LTFW ≈ 14750 Gallons

3.2 Contractor Furnished Equipment:

3.2.1 Contractor shall furnish all hoses, tanks, pumps, heat exchanger, valves, piping, elbows, plugs, etc. necessary to perform a satisfactory flush. Provide a measurement device able to measure the pH level of cleaning fluid, rinse, and final fill fluid.

3.2.1 Rainmaker or Distillate water to flush system and allow Ships Force to fill/refill Distillate tanks.

3.2.2 Table 1 – Contractor Furnished Material

Equipment (CFM)
Description
Mixing Tank(s)
Approx. 400 gal

Circulating Pump(s) (If Required)

May be suitable to use Ships Pumps Electric or Air Driven (Wilden Pump or equivalent) capable of approx. 150-200gpm

Heat Exchanger(s)
Capable to heat system fluid to 140-180F
Hoses
Approx. 300FT Hoses with steel/plastic couplings (Fire Hose or equivalent)
Fittings
Fittings, Hangers, plugs, etc.

3.2.3 Quantities are considered estimates. The contractor shall provide the exact quantities and (reasonable) additional material such as hose, hangers, sealant, screws, etc., in order to flush and install a fully functional system that meets the requirements of this specification.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 The following materials will be Government furnished:

4.1.1 Liquidewt ≈ 50 Pails

4.2 Government Furnished Services (GFS): None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.

5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER AUTHORIZATION.

5.4 T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.

7.0 STATEMENT OF WORK REQUIRED

7.1 Tag-Out all required systems and equipment.

7.2 Open and clean expansion tanks in accordance with Work Item 021.

7.3 Remove all residual coolant from the system and dispose of in accordance with Work Item 023 “Hazardous Waste Management and Disposal” and all Federal, State, and Local regulations.

7.4 Completely drain down systems of MAXIGARD residual and pump off prior to start of flushing activities.

7.5 Use References 2.0 as guidance.

7.6 To clean and treat system will require a minimum of two complete flushes and one freshwater cooling water changeout.

7.7 Connect hoses to high and low point drains. Flush all HTFW, LTFW systems using a 2"-3" (150-200 gpm) Wilden pumps (or equivalent), Heater (used to heat the system water).

7.8 Filter all deposits from entering return line back into each system.

7.9 Connect circulating unit tank and circulation pump equipment.

7.10 The path of the flushing water should be from the tank and circulation pump to the lowest point of the cooling system, through engine and returning to the tank.

7.11 Fill cooling system with deionized water. Start the recirculation pump and commence heating and maintain flushing water temperature of 140-180ºF.

7.12 Continue circulation and maintain the flushing water temperature for a minimum of 8 hours.

7.13 Drain the equipment. As soon as the flushing water level has dropped below the top access ports, open them and thoroughly flush with deionized water. Continue flushing while draining. Remove all loose deposits by flushing or manual cleaning.

7.14 Repeat flushing process until flush water is clear and not cloudy with no visible suspended solids.

7.15 Fill the systems with deionized water.

7.16 Add LIQUIDEWT at 13.0 liters/ton of system capacity. OEM representative shall monitor solution to ensure proper ratio is achieved.

7.17 Inspection/Test

7.17.1 Verify and inspect no leaks and system is complete and ready for service.

7.18 Manufacturer Representative:

Representative to oversee flushing of system and take all test samples.

Drew Marine 4855 Brookside Ct., Suite E, Norfolk, VA 23502 Office 1-757-853-1986 Mobile 1-757-339-1986

Fax 1-757-853-6455 POC: Kevin Gilbert kagilbert@drew-marine.com

8.0 GENERAL REQUIREMENTS: None additional.

0532 - 5