N32205-17-R-4011-0004.docx

DOCX document 36 KB Posted

Attached to
MTA OF USNS YUKON (T-AO 202)
Solicitation number
N32205-17-R-4011
Issued by

About this file

N32205-17-R-4011-0004

View the file

Other files

File Type Posted
N32205-17-R-4011-0002.docx DOCX document
N32205-17-R-4011_AMENDMENT_0003.docx DOCX document
Motor_Drains_sketch_for_question_11.pdf PDF
Question_10_answered.doc DOC document
Question_11_answered.doc DOC document
Question_9_answered.doc DOC document
WSM_Technical_Spec.pdf PDF
LOP_Strucal_8496442.pdf PDF
Question_3_answered.doc DOC document
LOP_Pipe_8496443.pdf PDF
Installation_Drawings.pdf PDF
Question_6_answered.doc DOC document
Question_4_answered.doc DOC document
LOP_Rep_Elec_320-8496441.pdf PDF
Question_8_answered.doc DOC document
Question_7_answered.doc DOC document
6580666_D.pdf PDF
Question_3.doc DOC document
J-8_Request_for_Spec_Clarification_-_0001.doc DOC document
N32205-17-R-4011-P00001.docx DOCX document
DD_Form_1423-1_SWI-004_13SEP16.pdf PDF
DD_Form_1423-1_SWI-011__13SEP16.pdf PDF
J-8_Request_for_Spec_Clarification.doc DOC document
DD_Form_1423-1_SWI-021_13SEP16.pdf PDF
J-2_Category_A_Items_.xlsx XLSX spreadsheet
J-14_NDA.docx DOCX document
JA__USNS_YUKON_Redacted.pdf PDF
DD_Form_1423-1_SWI-014_13SEP16.pdf PDF
J-4__GFM.doc DOC document
DD_Form_1423-1_SWI-012_13SEP16.pdf PDF
DD_Form_1423-1_SWI-025_13SEP16.pdf PDF
DD_Form_1423-1_SWI-020_13SEP16.pdf PDF
DD_Form_1423-1_SWI-023_13SEP16.pdf PDF
DD_Form_1423-1_SWI-003_13SEP16.pdf PDF
J-9_Disclosure_of_Lobbying_Activities_SF-LLL.pdf PDF
J-5_Subcontracting_Plan.docx DOCX document
J-3_CAT_B.xlsx XLSX spreadsheet
DD_Form_1423-1_SWI-015_13SEP16.pdf PDF
J-10_Interport_Differential.doc DOC document
DD_Form_1423-1_SWI-016_13SEP16.pdf PDF
DD_Form_1423-1_SWI-007_13SEP16.pdf PDF
DD_Form_1423-1_SWI-006_13SEP16.pdf PDF
J-13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
DD_Form_1423-1_SWI-001_13SEP16.pdf PDF
DD_Form_1423-1_SWI-019_13SEP16.pdf PDF
DD_Form_1423-1_SWI-018_13SEP16.pdf PDF
N32205-17-R-4011.docx DOCX document
DD_Form_1423-1_SWI-010_13SEP16.pdf PDF
J-12_Past_Performance_Data.docx DOCX document
J-7_MSC_Ship_Repair_Facility_Survey.doc DOC document
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-17-R-4011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICE TO BIDDERS

The following have been added by full text:

FPR SUBMISSION INSTRUCTIONS

REQUIREMENTS FOR SUBMISSION OF FINAL PROPOSAL REVISIONS

The offeror may submit a final revised technical, past performance, and/or price proposal in response to the request for final proposal revision submission. In the event that the offeror does not submit a final proposal revisions in part or entirety, the initial proposal will be considered for award in its entirety or those applicable parts not resubmitted. Therefore, an initial acceptable or unacceptable rating and/or evaluated price will be carried over for that factor. The final proposal revisions shall be submitted in the following format:

(a) General: Final proposal revisions shall be submitted in electronically (e-mail). These submissions shall be divided into two (2) e-mail submisisons as follows: (1) Price/Past Performance and all outstanding Amendments, signed and completed, and (2) Technical. E-mail submissions must be submitted by the date established in block 14 of this SF 30. The table below shows detailed page limits required to be submitted:

Volume
Title
Number of Hard Copies
Number of Digital Copies (CD-ROM)
Page Limits
I
General
N/A
N/A
N/A
II
Technical Proposal
N/A
N/A
N/A

(b) Offerors shall submit their final proposal revisions to the following address:

Bryan.makuch@navy.mil

Volume I: Price / Past Performance (as applicable for the final proposal revision submission)

Price In submission of final proposal revisions, offerors shall follow the price submission guidance from L-2, “Requirements for Submission of Proposals”

The revisions to the price proposal must be accompanied by a complete cost breakdown setting forth the revisions and the basis thereof.

Past Performance Offerors shall provide a written narrative addressing concerns provided during discussions, if any.

Other Business Issues Offerors shall provide a written narrative addressing concerns provided during discussions, if any.

Volume II: Technical Proposal

Final proposal revisions shall address concerns stated during discussions, if any. Failure to adequately address concerns in accordance with the discussions conducted and evaluation notices issued may be grounds for an Unacceptable factor rating in accordance with M-3.

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it. Updated .