Q_AND_A_Responses_2.docx

DOCX document 91 KB Posted

Attached to
USNS MEDGAR EVERS: Regular Overhaul and Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4314
Issued by
Department of the Navy Military Sealift Command

About this file

Request for Clarifications see attached for details.

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS: Regular Overhaul and Dry-Docking, newest first.
File Type Posted
J_-_2_Category_A_Items.xls XLS spreadsheet
N32205-16-R-4314_Amendment_0007.doc DOC document
N32205-16-R-4314_Amendment_0006.doc DOC document
N104-16-R-4314_OEM_J&A.pdf PDF
J_-_2_Category_A_Items.xls XLS spreadsheet
144_A_SHELL_AND_DECK_STEEL_REPLACEMENT_-_AMENDED.doc DOC document
644_A_COSAL_STOREROOM_VIDMAR_MOUNTING_-_AMENDED.doc DOC document
N32205-16-R-4314_Amendment_0006.doc DOC document
WI_644.zip ZIP file
210_A_8_CYL_MDE_12K_HR_SKED_MAINT_REV_-_(AMENDED).docx DOCX document
WI_144.zip ZIP file
565_A_CENTRAL_SEAWATER_SYSTEM_SPOOL_REPAIRS_(AMENDED).doc DOC document
N32205-16-R-4314_Amendment_0005.doc DOC document
Amendment_0005_reference_for_Work_items_.zip ZIP file
N32205-16-R-4314_Amendment_0004.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS _VOIDS_AND_COFFERDAMS _REV_FEB_14_Rev_A.doc DOC document
FUEL_OIL_FLEX_CONN_FINAL_DRAFT.PDF PDF
Q_AND_A_Responses_1.docx DOCX document
J_-_3_Category_B_Items_Medgar_Evers_ROHDD_2017.xls XLS spreadsheet
N32205-16-R-4314_Amendment_0002.docx DOCX document
J_-_2_Category_A_Items_Medgar_Evers_ROHDD_2017.xls XLS spreadsheet
N32205-16-R-4314.docx DOCX document
N32205-16-R-4314.docx DOCX document
J-4.pdf PDF
J-Attachments_2-14.zip ZIP file
J-6Zip.zip ZIP file
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-4314

QUESTIONS AND ANSWERS #1

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

Question 011:

SPECIFICATION ITEM NO.: 506

TITLE: EDG 5-YR INSPECTION, MAINTENANCE, AND TESTING

Specification calls for annual inspection and maintenance. Please clarify periodicity of inspection.

Answer:

All the steps listed in the “Every Year” tab of the Caterpillar Technical Manual (Item 506, Ref 2.1) “Maintenance Interval Schedule” section shall be considered part of this work item.

Question 012:

SPECIFICATION ITEM NO.: 841

TITLE: Fan Room Reinsulation and Repairs (VRR15-031) Work item states 700 sq. ft. of bulkhead/overhead. Is this the total for both spaces or just one, for a total of 350 sq. ft. per space? Same question for insulation, sheathing, and the 40 sq. ft. of clad weld.

Answer: All quantities stated are general estimated totals for one space.

Question 13:

SPECIFICATION ITEM NO.: 841

TITLE: Fan Room Reinsulation and Repairs (VRR15-031) Work item specifies the renewal of 100 sq. ft. of steel. Is it to be deck, baffle plate, bulkhead? What adjacent space? Thickness? Grade? Please clarify.

Answer:

Steel to be replaced could be deck, bulkhead, or hull. Grade is ABS AH 36. Deck and Hull are ¾” plate. Interior bulkhead and overhead are 9/16” plate.

Question 14:

SPECIFICATION ITEM NO.: 504A

PARAGRAPH / SECTION NO: 2.4

TITLE: Crane Retesting Survey & Hydraulic Hose Replacement (5-YR) Rev - Please provide the following reference:

Answer:

Drawing will added in amendment 005.

Question 15:

SPECIFICATION ITEM NO.: 643

PARAGRAPH / SECTION NO: Various TITLE: Flight Deck Hatch Counterweight Reapir (VRR15-027)

1) The items states to refurbish the hatches hardware. The statement of work in paragraphs 7.1.1 and 7.4 is very open ended. Please provide part numbers that are required to be addressed in order to accomplish this item.

2) Also, the pulley wheels, if powder coated, will adversely affect the wire rope. Please advise.

3) The referenced drawing references the drawing 805-1626009 for the spring, part number 68, that is supposed to be manufactured. The drawing is not in the references.

Please provide the drawing and if possible a recommended manufacturer.

4) Please provide all the drawings referenced for the detailed assemblies such as the wire rope assembly. 805-1624071 REV D.

Answer:

1. Being that it was stated that the counterbalance system be overhauled items the scope of the work should contain, but not be limited to the following items:

38,37,73,72,68,64,32,31,30,29,70,69,43,39,36,35,37,66,67,44,48,65,5 5,54,53,52,51,50,74,75,76,49,41,40,34,33,63,61,60,57,56,46,42,59,

2. The pulley wheels with the exception of the wire groove are required to be powder coated to prevent further deterioration.

3. Drawing is included with this answer. Timsa division of NASSCO should be contacted for part supply details.

4. Drawing included with this answer.

Question 16:

SPECIFICATION ITEM NO.: 401

PARAGRAPH / SECTION NO: Various TITLE: Bridge Equipment Annual Service Rev - Please provide make and model numbers for the gyro and steering stand.

Answer:

Gyros: MK 27F, Northrop Grumman, P/N 03956-4800880-1 S/N: 097 S/N: 098 Steering Units: Bridge: Sperry Navipilot 4000 Port Bridge Wing: DoDAAC: N29002 EID: 04EK4 Part No: RP1-02-34768-ASM Serial No: 252123

HSC: 252123

Stbd Bridge Wing DoDAAC: N29002 EID: 04EK4 Part No: RP1-02-34771-ASM Serial No: 252124

HSC: 252124

Question 17:

SPECIFICATION ITEM NO.: 643

PARAGRAPH / SECTION NO: Various TITLE: Bridge Equipment Annual Service Rev - The title of the item on the pricing sheet is “RHIB Sponson Repairs (VRR16-019)”. The title on the work item is “Flight Deck Hatch Counterweight Repair”. Please clarify.

Answer:

Pricing sheet needs to be updated to match Work Item Index.

Question 18:

SPECIFICATION ITEM NO.: 202A

PARAGRAPH / SECTION NO: Various TITLE: Main Engine Fluid Flexible Connectors Replacement (5 Year) Rev - Please provide the breakdown of the hoses sizes, type, length and end fitting configurations and material or a print designating this information.

Answer:

Due to proprietary concerns further breakdown of the hoses cannot be provided. Estimates should be based on price of the OEM listed part number (M1XXXXX, ETC) provided in the work item.

Question 19:

SPECIFICATION ITEM NO.: 643

PARAGRAPH / SECTION NO: Various TITLE: RHIB Sponson Repairs (VRR16-019) PARA. 7.3 All material shall be fabricated utilizing reference 2.1 as directed guidance. No deviation allowed.

Does this include bronze bushings? (to stainless) What grade of stainless is required for job?

Please clarify the above.

Answer:

Again, the work item describes repairs to the hatch counterweight system. To the greatest extent possible, parts and fasteners originally fabricated of steel will be replaced with a comparable grade of stainless steel with the exception of the springs and bushings. Refer to NAVSEA, BUSHIPS, and TIMSA drawings for additional information.

Question 20:

SPECIFICATION ITEM NO.: 106

PARAGRAPH / SECTION NO: Various TITLE: Deck House Cleaning and Painting (Spot Blast) Rev -

1. Paragraph 7.8 is referencing a water blasting standard. Bidder assumes the owner meant to reference an abrasive blast standard SPPC SP-10. Is this correct?

2. Paragraph 7.16.1.1 Owner is directing to airless spray the entire house. Please note this will be a considerable cost to the project due to the additional containment / staging requirements for what would be considered a cosmetic coat.

Would the owner accept brushing and rolling in lieu of airless spraying?

Answer:

1. Contractor shall grit blast to SP-10 standards.

2. Contractor shall bid this specification as written. Deviations from Spec can be reviewed on a case-by-case scenario via Condition Found Report AFTER Contract Award, but it shall be noted that approval of deviation is NOT guaranteed in any way.

Question 21:

SPECIFICATION ITEM NO.: 143

PARAGRAPH / SECTION NO: Various TITLE: Tank Preservation

1. Can the owner provide square footage for all the tanks so all bidders’ area apples to apples?

2. Paragraph 7.2.2 please be aware that wiping the blasted surface with damp rags will cause surface rust.

3. Paragraph 7.2.6 Due to the high cost of Belzona 3921 can the owner declare how much of the total area might require priming?

4. Paragraph 7.2.2 (C) directs to blast 15% of each tank (8-62-2 & 8-62-0) can owner provide the surface area of these (2) tanks? Please note that the M3 given in 7.2.2 (G) is not sufficient to calculate surface area.

5. Paragraph 7.3.12 Bidder assumes this a misprint due to the fact that Amershield is an exterior coatings. Is bidder to price a full coat of Amercoat 240 after applying two (2) spot coats?

6. Paragraph 7.2.5d Specifies a minimum 50F temperature differential, Bidder believes this may be misprint and the owner meant to say 5F? Is this correct?

7. Paragraph 7.3.3D Same as 7.2.5d

8. Paragraph 7.3.6D Same as 7.2.5d

9. Paragraph 7.3.14 Recoat times seem excessive and outside the manufacturer requirements. Please clarify

Answer:

1. MSC Dwg 8390115 – SRD BOOKLET OF TANK CAPACITY TABLES - USNS MEDGAR EVERS will be provided in amendment 005 to provide the Contractor with additional information needed for proper estimations and planning.

2. Contractor shall remove all traces of dirt/contamination and solvent wipe tank, as required.

3. Area requiring priming is at the requirement of the Belzona Tech Rep.

4. See answer to 1.

5. Contractor shall bid full coat of Amercoat 240.

6. Contractor shall maintain a minimum of 5F differential between the air and substrate temperatures of the tank and the dew point, with the dew point being the lower temperature.

7. See answer to 6.

8. See answer to 6.

9. Deviations to the listed curing timeframe can only be modified at the discretion of the MSC Paint Representative.

Question 22:

SPECIFICATION ITEM NO.: 334

PARAGRAPH / SECTION NO: Various TITLE: PA/BA System UPS Installation (T-ALT 323) Please provide the below listed references.

2.1 MSC Drawing 432-8496669; Electrical Power

Modification PA/GA System.

2.2 MSC Drawing 432-8496670; Electrical Power

Modification PBX System.

2.3 MSC Drawing 185-8497160; Foundation.

Answer:

Drawings will be added in amendment 005.

Question 23:

SPECIFICATION ITEM NO.: 106

PARAGRAPH / SECTION NO: Various TITLE: Deck House cleaning and Painting (Spot blast) Rev - Sub-item 5.5 mandates "grit blast only" due to lack of profile Sub-item 7.8 and 7.8.1 states to spot UHP, SP-12/Nace 5 Please clarify.

Also, since it is only 30% spot blast, how should subcontractor address staging requirements as the 30% area are not identified?

Contractor shall grit blast to SP-10 standards.

Subcontractor shall assume areas requiring spot blast will be throughout, and shall plan for staging in various locations as required.

Question 24:

SPECIFICATION ITEM NO.: 918

PARAGRAPH / SECTION NO: Various TITLE: Freeboard Cleaning and Painting (Spot Blast) Rev - Sub-item 5.5 mandates "grit blast only" due to lack of profile Sub-item 7.13 and 7.13.1 states to spot UHP, SP-12/Nace 5 Please clarify.

Also, since it is only 30% spot blast, how should subcontractor address staging requirements as the 30% area are not identified?

Answer:

Contractor shall grit blast to SP-10 standards.

Subcontractor shall assume areas requiring spot blast will be throughout, and shall plan for staging in various locations as required.

Question 25:

SPECIFICATION ITEM NO.: 565

PARAGRAPH / SECTION NO: Various TITLE: Freeboard Cleaning and Painting (Spot Blast) Rev - With reference to your answer to Item 565, Amendment 2- Para 4.2 addresses the 20” valves, para 7.1.11 addresses 10” valves -2 per cooler. Para

4.2 makes NO mention of the (6) 10” valves. Please advise.

Answer:

Work Item will be amended to state that the valves in question will be procured by the shipyard under Contractor Furnished Material. The valves shall be the following:

6 EA

10" Dia, 150# Butterfly valves for saltwater service- Valves are to be LUGGED Type High Performance Valves; Al/Brnz Body, Crane Valves (Flowseal), MSS-SP-68

Question 26:

SPECIFICATION ITEM NO.: 575

PARAGRAPH / SECTION NO: 2.2

TITLE: Cargo Reefer Flexible Boot Replacement (VR15-047) Please provide the following reference:

Drawings will be added in amendment 005.

Document is attached. Drawing was also found in technical manual

T9516-A8-MMC-010.

Question 27:

SPECIFICATION ITEM NO.: 334

PARAGRAPH / SECTION NO: Various TITLE: PA/GA System UPS Installation (T-ALT 323) Please provide the following references:

Duplicate question of 22J-8. Drawings will be added in amendment 005.

Question 28:

SPECIFICATION ITEM NO.: 432

PARAGRAPH / SECTION NO: Various TITLE: SRD-500 Doppler Speed Log Replacement (T-ALT 431) Please provide a copy of the as built drawings for the SRD-500 and as-built Furuno DS- 60 installation drawing for the USNS Cesar Chavez mentioned in the RFQ.

Drawings will be added in amendment 005.

Question 29:

SPECIFICATION ITEM NO.: 504A

PARAGRAPH / SECTION NO: 2.0

TITLE: Crane Retesting Survey and Hyd. Hose Replacement Please provide the following reference:

Drawing will be added in amendment 005.

Question 30:

SPECIFICATION ITEM NO.: 916

PARAGRAPH / SECTION NO: Various TITLE: Underwater Hull Cleaning and Painting (Spot Blast) Rev - Sub-item 5.5 mandates "grit blast only" due to lack of profile Sub-item 7.11 and 7.11.1 states to spot UHP, SP-12/Nace 5 Please clarify.

Also, since it is only 30% spot blast, how should subcontractor address staging requirements as the 30% area are not identified?

Answer:

Contractor shall grit blast to SP-10 standards.

Subcontractor shall assume areas requiring spot blast will be throughout, and shall plan for staging in various locations as required.

Question 31:

SPECIFICATION ITEM NO.: 572

PARAGRAPH / SECTION NO: Various

TITLE:

Please provide make and part number for heat trace/heaters or the Box Manufacturer for the Freezer and Fish Room units, the attachments do not contain sufficient information to procure the proper heat trace material.

Answer:

Pictures with name plate data will be added in amendment 005.

MANUFACTURER OF ALL DOORS AND FRAMES IS COSPOLICH.

Question 32:

SPECIFICATION ITEM NO.: 334

PARAGRAPH / SECTION NO: 2.0

TITLE: PA/GA System UPS Installation (T-ALT 323) Please provide the following references:

Answer:

Drawings will be added in amendment 005.

FIRST THREE REQUESTED DOCUMENTS ARE

DUPLICATES OF PREVIOUS QUESTIONS 002, 22J-8, 27, J-8, J-8 SPEC 1.

Question 33:

SPECIFICATION ITEM NO.: 302

PARAGRAPH / SECTION NO: 7.3

TITLE: High Voltage Cable Crimp Connector Inspection Section 7.3 of the subject spec states that the manufacturer's representatives are to arrive onboard with all necessary tooling, including crimping tools and dies, replacement crimp connectors, and shrink wrap to address discrepancies found during inspections. The government has a surplus of these termination kits and therefore subcontractor would like for these to be provided as GFE. This information is vital for subcontractor to provide an accurate and competitive quote. Please advise.

Answer:

THERE WILL BE NO CHANGE TO THIS ITEM AND ALL SUBCONTRACTORS

ARE EXPECTED TO BID ON THE ITEM AS IT IS

WRITTEN.

Question 34:

SPECIFICATION ITEM NO.: 501B

PARAGRAPH / SECTION NO: 7.6.6

TITLE: Firefighting Inspections and Testing (5-Yr) Rev - Reference 7.6.6 – Paragraph asks for concentration samples, should this be contamination samples?

Answer:

NO. AFFF TANK SAMPLES WILL BE PROVIDED TO THE SHIP FOR

YEARLY OFFSHIP AFFF CONCENTRATION TESTING PERFORMED BY

AFFF SUPPLIER.

Question 35:

SPECIFICATION ITEM NO.: 303

PARAGRAPH / SECTION NO: 2.6

TITLE: HV-SS-E Switchboard Inspection and Cleaning Rev - Please provide reference 2.6 USNS Medgar Evers – Gauge Calibration Listing:

Electrical Systems.

Answer:

USNS Medgar Evers – Gauge Calibration Listing: Electrical Systems, will be added in amendment 005.

Question 36:

SPECIFICATION ITEM NO 563 & 942

Can you please provide the following references:

261-8497215 528-7488743 100-6496418

Answer:

THE FIRST REQUESTED DRAWING IS NOT LISTED ON EITHER OF THE

WORK ITEMS.

Drawings will be included in amendment 005.

Question 37:

Item 141 Paragraph 3.1.2 gives a quantity of 13 ladders. Paragraph 7.1 requires all ladders not currently powder coated to be removed per enclosure 2.2.1 – (42 listed as not powder coated). Paragraph 7.4.1 states to powder coat all ladders. Please clarify the quantity of ladders to be dealt with.

Could you please provide drawing with dimensions of the ladders in question.

Paragraph 3.2.1 a. refers to staging to accomplish preservation of the stack fairing. Are we correct in assuming that this should not be part of this item.

Item 143 Could you please advise each tank’s surface area in which to base our quotation?

Item 334 Can you please provide the following references?

Drawing 432-8496669 Drawing 432-8496670 Drawing 185-8497160 Eaton PW9130L3000-XL UPS Users Guide Item 643 The J-2 pricing sheet description is completely different to the work item.

Item 915 This J-2 pricing sheet item appears as item 916 in the work items.

Items 106, 916 & 918 These items all specify surface preparation must be by grit blasting (paragraph 5.5). Item 106 paragraph 7.8, item 916 paragraph 7.11 and item 918 paragraph 7.13 all give the surface preparation standard as SSPC-SP12/NACE 5 which is a UHP water jetting standard. Please clarify.

Answer:

1. An amendment to cancel this work item will be submitted.

2. MSC Dwg 8390115 – SRD BOOKLET OF TANK CAPACITY TABLES - USNS MEDGAR EVERS will be provided in amendment 005 to provide the Contractor with additional information needed for proper estimations and planning.

3. References attached.

4. Contracting to modify pricing sheet to match package table of contents.

5. Contracting to modify pricing sheet to match package table of contents.

6. For all items Contractor shall grit blast to SP-10 standards.

Questions 38:

SPECIFICATION ITEM NO.: _____334_____________

PARAGRAPH / SECTION NO:__2.1, 2.2, 2.3__________________

TITLE: ______UPS for Telephone, PA, and GA (T-ALT 323)____________ The references listed in the above paragraphs were not provided. Please provide.

Answer: references will be attached in amendment 005.

Question 39:

SPECIFICATION ITEM NO.: _____106_____________

PARAGRAPH / SECTION NO:__7.8, 7.16.1.1__________________

TITLE: ______Deckhouse Preservation____________

1. Paragraph 7.8 is referencing a water blasting standard. Did the government mean to reference an abrasive blast standard SPPC SP-10?

2. Paragraph 7.16.1.1 Government is directing to airless spray the entire house.

Please note this will be a considerable cost to the project due to the additional containment / staging requirements for what would be considered a cosmetic coat.

Would the government accept brushing and rolling in lieu of airless spraying.

Answer:

1. Contractor shall grit blast to SP-10 standards.

2. Contractor shall bid this specification as written.

Deviations from Spec can be reviewed on a case-by-case scenario via Condition Found Report AFTER Contract Award, but it shall be noted that approval of deviation is NOT guaranteed in any way.

Question 40:

SPECIFICATION ITEM NO.: _____143_____________

PARAGRAPH / SECTION NO:__various__________________ TITLE: ______Tank Preservation____________

1. Can the government provide square footage for all the tanks so everyone is bidding the same quantity?

2. Paragraph 7.2.2 please be aware that wiping the blasted surface with damp rags will cause surface rust.

3. Paragraph 7.2.6 Due to the high cost of Belzona 3921, can the government declare how much of the total area might requiring priming?

4. Paragraph 7.2.2 (C) directs to blast 15% of each tank (8-62-2 & 8-62-0). Can the government provide the surface area of these two (2) tanks? Please note that the M3 given in 7.2.2 (G) is not sufficient to calculate surface area.

5. Paragraph 7.3.12 we assume that this a misprint due to the fact that Amershield is an exterior coatings. Are we to price a full coat of Amercoat 240 after applying two (2) spot coats?

6. Paragraph 7.2.5d specifies a minimum 50F temperature differential. Did the government mean to say 5F?

7. Paragraph 7.3.3D Same as 7.2.5d

8. Paragraph 7.3.6D Same as 7.2.5d

9. Paragraph 7.3.14 Recoat times seem excessive and outside the manufacturer requirements. Please clarify

Answer:

1. MSC Dwg 8390115 – SRD BOOKLET OF TANK CAPACITY TABLES - USNS MEDGAR EVERS will be provided in amendment 005 to provide the Contractor with additional information needed for proper estimations and planning.

2. Contractor shall remove all traces of dirt/contamination and solvent wipe tank, as required.

3. Area requiring priming is at the requirement of the Belzona Tech Rep.

4. See answer to 1.

5. Contractor shall bid full coat of Amercoat 240.

6. Contractor shall maintain a minimum of 5F differential between the air and substrate temperatures of the tank and the dew point, with the dew point being the lower temperature.

7. See answer to 6.

8. See answer to 6.

9. Deviations to the listed curing timeframe can only be modified at the discretion of the MSC Paint Representative.

Question 41:

SPECIFICATION ITEM NO.:953

PARAGRAPH / SECTION NO: 7.3.4

TITLE: Seawater Header Transducer Replace

Para. 7.3.4 Please provide footage of 1/4” 316L stainless Tubing to replace.

Answer:

1. Contractor to estimate approximately 25 ft of 316L stainless tubing.

Question 42:

SPECIFICATION ITEM NO.:954

PARAGRAPH / SECTION NO: Various TITLE: Firemain Pressure Transducer Replace Para. 7.3.7 & 7.4.7 Please provide footage for each paragraph of 3/8” 316L stainless Tubing to replace.

Answer:

1. Contractor to assume 25 ft of 3/8” 316L stainless tubing for each paragraph for a total of 50 ft.

Question 43:

SPECIFICATION ITEM NO.: 106

PARAGRAPH / SECTION NO: 5.5

TITLE: HV-SS-E Switchboard Inspection and Cleaning Rev - Paragraph 5.5 calls for grit blasting. Paragraph 7.8 and 7.8.1 call for UHP to SSPC-SP 12 with 30% of area to WJ2. Please advise.

Paragraph 7.16 calls for 100% of the deck house to be top coated. Assume we can use Devprep 88 to prepare the surface not being UHP to WJ2 ?

Do we need to provide pricing to include all access / scaffolding to complete work ?

Answer:

1. Contractor shall grit blast to SP-10 standards.

2. Devprep 88 is acceptable only if it is used in strict adherence to the OEM Instruction Guide for it and following the guidance of the MSC Paint Rep.

3. Subcontractor shall assume areas requiring spot blast will be throughout, and shall plan for staging in various locations as required.

Question 44:

SPECIFICATION ITEM NO.: 143

PARAGRAPH / SECTION NO: Various TITLE: Tank Preservation Paragraph 7.3.2a calls for spot blast – abrasive blast to SSPC-SP10 and then 7.3.2b references UHP SSPC-SP12. Please advise.

Paragraph 7.3.3d states”…a minimum of 50 F..” should this read 5 F ?

Answer:

1. Abrasive blast to SSPC-SP10 is correct.

2. Contractor shall maintain a minimum of 5F differential between the air and substrate temperatures of the tank and the dew point, with the dew point being the lower temperature.

Question 45:

SPECIFICATION ITEM NO.: 916

PARAGRAPH / SECTION NO: Various TITLE: Underwater Hull Cleaning and Painting (Spot Blast) Rev - Paragraph 5.5 requires abrasive grit blasting. Then paragraph 7.4 talks about UHP to SSPC-SP12. Paragraph 7.11.1 also talks about UHP SSPC-SP12. Please advise.

Answer:

1. Contractor shall grit blast to SP-10 standards.

Question 46:

SPECIFICATION ITEM NO.: 918

PARAGRAPH / SECTION NO: Various TITLE: Underwater Hull Cleaning and Painting (Spot Blast) Rev - Paragraph 5.5 requires abrasive grit blasting. Then paragraph 7.10 talks about grit blasting. Paragraph 7.13 then talks about UHP to SSPC-SP12. Please advise.

Answer:

1. Contractor shall grit blast to SP-10 standards.

Question 47:

SPECIFICATION ITEM NO.:573

PARAGRAPH / SECTION NO: 2.2.1

TITLE: Cyclone Valve Replacement

Please provide Reference 2.2.1 VR15-0034 Pictures

ANSWER:

VR15-0034 pictures on cyclone valve replacement will be added with amendment 005.

image1.emf image2.emf image3.emf image4.emf image5.emf