J_-_2_Category_A_Items.xls

XLS spreadsheet 67 KB Posted

Attached to
USNS MEDGAR EVERS: Regular Overhaul and Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4314
Issued by
Department of the Navy Military Sealift Command

About this file

Revised J-2 Attachment

View the file

Other files for this federal contract opportunity

Other files attached to USNS MEDGAR EVERS: Regular Overhaul and Dry-Docking, newest first.
File Type Posted
N32205-16-R-4314_Amendment_0007.doc DOC document
N32205-16-R-4314_Amendment_0006.doc DOC document
N104-16-R-4314_OEM_J&A.pdf PDF
644_A_COSAL_STOREROOM_VIDMAR_MOUNTING_-_AMENDED.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
144_A_SHELL_AND_DECK_STEEL_REPLACEMENT_-_AMENDED.doc DOC document
N32205-16-R-4314_Amendment_0006.doc DOC document
N32205-16-R-4314_Amendment_0005.doc DOC document
210_A_8_CYL_MDE_12K_HR_SKED_MAINT_REV_-_(AMENDED).docx DOCX document
WI_144.zip ZIP file
WI_644.zip ZIP file
565_A_CENTRAL_SEAWATER_SYSTEM_SPOOL_REPAIRS_(AMENDED).doc DOC document
Amendment_0005_reference_for_Work_items_.zip ZIP file
Q_AND_A_Responses_2.docx DOCX document
N32205-16-R-4314_Amendment_0004.docx DOCX document
FUEL_OIL_FLEX_CONN_FINAL_DRAFT.PDF PDF
0021_A_CLEAN_AND_GAS_FREE_TANKS _VOIDS_AND_COFFERDAMS _REV_FEB_14_Rev_A.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
J_-_2_Category_A_Items_Medgar_Evers_ROHDD_2017.xls XLS spreadsheet
N32205-16-R-4314_Amendment_0002.docx DOCX document
J_-_3_Category_B_Items_Medgar_Evers_ROHDD_2017.xls XLS spreadsheet
N32205-16-R-4314.docx DOCX document
J-Attachments_2-14.zip ZIP file
J-6Zip.zip ZIP file
N32205-16-R-4314.docx DOCX document
J-4.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep / SubOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPriceTOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
000GENERAL REQUIREMENTS
001INTENT, SCOPE GENERAL CONDITIONS & DEFINITIONS- 0$ - 0$0
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVES- 0$ - 0$0
003APPROACH, BERTH, AND MOORING REQUIREMENTS- 0$ - 0$0
004TESTING AND QUALITY ASSURANCE- 0$ - 0$0
005ELECTRICAL SAFTEY PROCEDURE REQUIREMENTS- 0$ - 0$0
006HEAVY WEATHER PLAN- 0$ - 0$0
007COLD WEATHER PLAN- 0$ - 0$0
010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)- 0$ - 0$0
011FURNISH GENERAL SERVICES (T-AKE)- 0$ - 0$0
012TELEPHONE SERVICES- 0$ - 0$0
013PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORTS- 0$ - 0$0
014PREPARATION OF WEIGHT AND MOMENT REPORT- 0$ - 0$0
015INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS- 0$ - 0$0
016FIRE PROTECTION AND SHIP'S SAFETY PROGRAM- 0$ - 0$0
017HANDLING SHIP'S STORES- 0$ - 0$0
018DELIVERY AND REDELIVERY OF THE VESSEL- 0$ - 0$0
019SHIPBOARD ACCESS AND SECURITY- 0$ - 0$0
020GAS FREE CERTIFICATES- 0$ - 0$0
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACES- 0$ - 0$0
022DOCK TRIALS AND SEA TRIALS- 0$ - 0$0
023HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR'S FACILITY- 0$ - 0$0
024PHYSICAL SECURITY OF VESSEL- 0$ - 0$0
100HULL STRUCTURE
101BALLAST TANK ZINC INSPECTION- 0$ - 0$0
102OPEN, CLEAN, AND INSPECT TANK VENT GOOSENECKS$ - 0$0
109HULL GAUGING - LIMITED SUSPECT SPOTS - ABS$ - 0$0
106DECKHOUSE PRESERVATION – SPOT BLAST$ - 0$0
143TANK PRESERVATION (VRR15-028)$ - 0$0
144SHELL AND DECK STEEL REPLACEMENT$ - 0$0
200MACHINERY, PROPULSION
201PROPULSION MOTOR AND COOLER CLEANING- 0$ - 0$0
202MAIN ENGINE FLEXIBLE CONNECTION REPLACEMENT (5-YR)$ - 0$0
204MDE CONTROL SAFETY INSPECTION AND TEST$ - 0$0
205AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST$ - 0$0
206VULKAN COUPLING ANNUAL INSPECTION$ - 0$0
210MDE 12K OVERHAUL- 0$ - 0$0
231MDE SPLASH OIL AND TEST CIRCUIT MOD (T-ALT 381)- 0$ - 0$0
232MDE FUEL OIL FLEX PIPING REPLACEMENT (T-ALT 449)$ - 0$0
300ELECTRICAL
301ACLEANING MAIN GENERATORS, FREQUENCY CONVERTERS,
PROPULSION TRANSFORMERS, AND HARMONIC FILTERS- 0$ - 0$0
302HV/SS/EMER SWITCHBOARD CLEANING- 0$ - 0$0
303HIGH VOLTAGE CRIMP CONNECTOR INSPECTION- 0$ - 0$0
331AEES UPS UPGRADE (T-ALT 434)- 0$ - 0$0
332SACOS UPS UPGRADE (T-ALT 352)- 0$ - 0$0
333EMERGENCY SWITCHBOARD MODIFICATIONS (T-ALT 154)- 0$ - 0$0
334UPS FOR TELEPHONE, PA, AND GA (T-ALT 323)- 0$ - 0$0
400COMMUNICATION AND NAVIGATIONAL AIDS
401BRIDGE AND NAV EQUIPMENT PM AND ANNUALS- 0$ - 0$0
402ANTENNA PREVENTIVE MAINTENANCE- 0$ - 0$0
403COMMUNICATION SUITE PM AND REPAIRS- 0$ - 0$0
404OE-570 SATCOM ANTENNA SYSTEM PM- 0$ - 0$0
432SRD-500 DOPPLER REPLACEMENT (T-ALT 431)- 0$ - 0$0
434SSAS REPLACEMENT (T-ALT 438)- 0$ - 0$0
500MACHINERY, AUXILIARY SYSTEMS
501BFIRE FIGHTING INSPECTION AND TESTING (5-YR)- 0$ - 0$0
502SCBA ANNUAL INSPECTION AND TESTING- 0$ - 0$0
503SCBA AIR COMPRESSOR AND RE-FILLING STATION INSPECTION
AND MAINTENANCE- 0$ - 0$0
504AAPPLETON CRANE 5-YR INSPECTION AND TESTING$ - 0$0
506EDG 5-YR INSPECTION, MAINTENANCE, AND TESTING$ - 0$0
507EDG 5-YR HOSE REPLACEMENT$ - 0$0
509DISTILLER CLEANING, INSPECTION, AND MAINTENANCE$ - 0$0
512BMAGAZINE SPRINKLER GAUGE CALIBRATION$ - 0$0
514RELIEF VALVE TESTING$ - 0$0
515HP AIR RECEIVERS TESTING AND CERTIFICATION$ - 0$0
516SEWAGE PIPING SYSTEM CLEANING$ - 0$0
527BRINE SYSTEM FLUSH$ - 0$0
528BMAGAZINE SPRINKLER OVERHAUL (T-AKE 10-14)- 0$ - 0$0
562SEWAGE TREATMENT ROOM FIREMAIN FLUSHING VALVE REPLACE (T-ALT 336)- 0$ - 0$0
563SEWAGE DISCHARGE FLUSHING (T-ALT 167)- 0$ - 0$0
564VCHT CHECK VALVE INSTALLATION (T-ALT 362)- 0$ - 0$0
565LTFW COOLER SW PIPING MODS (T-ALT 238)- 0$ - 0$0
571OILY WATER SEPERATOR GROOM AND TESTING- 0$ - 0$0
572DOMESTIC FISH/FREEZER DOOR HEATER REPLACEMENT (VRR15-029)- 0$ - 0$0
573CYCLONE SEPARATOR VALVE REPLACEMENT (VRR15-034)- 0$ - 0$0
575CARGO REEFER FLEXIBLE BOOT REPLACEMENT (VRR15-047)- 0$ - 0$0
579VCHT PIPING REPAIRS (VRR-16-005)- 0$ - 0$0
580AFFF HANGAR SPRINKLER MODIFICATIONS (VRR15-044)- 0$ - 0$0
600OUTFIT, FURNISHINGS AND HABITABILITY
602ACCOM LADDER INSPECTION AND LOAD TESTING (5-YR)- 0$ - 0$0
603LIFEBOAT CERTIFICATION AND FALLS RENEWAL (5-YR)- 0$ - 0$0
604RHIB MAINTENANCE AND FALLS RENEWAL (5-YR)- 0$ - 0$0
605LIFERAFT ANNUAL CERTIFICATION$ - 0$0
606FLIGHT DECK NON-SKID RENEWAL$ - 0$0
610GALLEY EQUIPMENT CALIBRATION$ - 0$0
641STATEROOM DECK HEAD RENEWAL$ - 0$0
642HELO DECK FLIGHT DECK HATCH PRESERVATION (VR15-008)$ - 0$0
643FLIGHT DECK HATCH COUNTERWEIGHT REPAIR (VR15-027- 0$ - 0$0
644COSAL STOREROOM VIDMAR CABINET MOUNTING- 0$ - 0$0
800HEATING, VENTILATION, AND AIR CONDITIONING
801GALLEY AND LAUNDRY EXHAUST DUCT CLEANING- 0$ - 0$0
841FAN ROOM REINSULATION AND REPAIRS (VRR15-031)$ - 0$0
842LOUVER MESH FRAMES (VRR15-032)- 0$ - 0$0
900DRY-DOCKING
901Dry-Docking and Undocking- 0$ - 0$0
Haul Days- 0$ - 0$0
Lay Days- 0$ - 0$0
903CPROPELLER SHAFT AND STERN TUBE INSPECTION$ - 0$0
904STERN TUBE SEAL INSPECTION$ - 0$0
905BBOWTHRUSTER MAINTENANCE (5-YR)$ - 0$0
907POLISH BOWTHRUSTER PROPELLER$ - 0$0
908RENEW SEACHEST, ROPE GUARD AND BOWTHRUSTER ZINCS$ - 0$0
909ANCHOR CHAIN RANGING$ - 0$0
910OVERHAUL SEA VALVES$ - 0$0
911INSPECT AND REPAIR CATHODIC PROTECTION$ - 0$0
912SHAFT GROUNDING & BRUSH PREVENTATIVE MAINTENANCE- 0$ - 0$0
913RENEW WASTER PIECES- 0$ - 0$0
916UNDERWATER HULL CLEANING AND PAINTING – SPOT BLAST- 0$ - 0$0
918FREEBOARD CLEANING AND PAINTING – SPOT BLAST- 0$ - 0$0
941REVERSE OSMOSIS UNIT SEACHEST INSTALLATION- 0$ - 0$0
942BOW THRUSTER TRASH BAR MODIFICATIONS- 0$ - 0$0
951FIREMAIN OVERBOARD PIPING RENEWAL & CORD REPLACEMENT- 0$ - 0$0
952EMERGENCY BILGE SUCTION RECONDITIONING (VRR15-037)- 0$ - 0$0
953SEAWATER HEADER TRANSDUCER REPLACEMENT (VRR16-017)- 0$ - 0$0
954FIREMAIN PRESSURE TRANSDUCER REPLACEMENT (VRR16-001)- 0$ - 0$0
1000UNREP GEAR
1001SLIDING BLOCK CHAIN REPLACEMENT- 0$ - 0$0
TOTAL CAT "A"$0.00

&LUSNS MEDGAR EVERS(T-AKE 13)&CCONTRACTOR PRICE BREAKDOWN

&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-16-R-4314

&CATTACHMENT J-2

File details come from the government source that posted it. Updated .