About this file

This document is a Draft Request for Proposals (RFP) from the Naval Air Warfare Center Aircraft Division (NAWCAD) for the Air Platform Engineering & Integration (APE&I) procurement, solicitation number N00421-25-R-0002. The requirement is for engineering and integration services for various airborne capabilities including sensors, communications, weapons, and control technologies across manned and unmanned platforms. The services include engineering, installation, integration, testing, training, and operational support. This is a full and open competition under NAICS code 541330 (Engineering Services) with a $47 million small business size standard. It is a follow-on to the previous N00421-21-D-0001 contract. The government is requesting industry feedback on the draft solicitation by 1:00 PM on October 2, 2024. The draft solicitation and associated documents are provided for review to obtain industry input and questions.

View the file

Other files

File Type Posted
Att 13 Draft RFP Questions and Responses.pdf PDF
N00421-25-R-0002 APEI Draft RFP.docx DOCX document
Att 11 Small Business Subcontracting Plan.pdf PDF
Att 12 Wage Determination 2015-4279 Rev 25 (22Jul2024).pdf PDF
Att 10 TDL CDRL Attachment COR Customer TPOC.xlsx XLSX spreadsheet
Att 07 List of Approved Subcontractors.docx DOCX document
Att T2 Key Personnel.docx DOCX document
Att T1 Sample Tasks.docx DOCX document
Att 02 DD254.pdf PDF
Att C3 Fixed Price TM Narrative.docx DOCX document
Att 03 Authorized Key Personnel.docx DOCX document
Att 05 COR Designation Letter.pdf PDF
Att 08 Contract Surveillance Plan.pdf PDF
Att 04 Data Item Transmittal.Acceptance.Rejection Form.pdf PDF
Att S1 SBPCD.docx DOCX document
Att 01 Award Fee Determination Plan.docx DOCX document
Att C1 - Cost Reimbursable Workbook.xlsx XLSX spreadsheet
Att C2 Cost Reimbursable Narrative.docx DOCX document
Att C4 - Government Labor Hours.xlsx XLSX spreadsheet
Att 09 TDL CDRL Attachment COR Only.xlsx XLSX spreadsheet
Att 06 OCI List.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER__MGMT__________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A001 Contracting Officer’s Representative (COR) Management Report for

Technical Direction Letters (TDLs) Segregation of Cost and Invoice Requirements Reporting for TDLs

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81864 NOT 1 (See Block 16) SOW Paras 3.1.3.1, 3.1.3.2, 3.1.9 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Block 16) See Block 16 See Block 16

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A (See Block 16) See Block 16 See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 0 1 0 Block 4: The Contractor shall use the Government format listed in Attachment 10 Excel template “COR only” and Attachment 09 Excel template “COR customer TPOC” of section J of the Contract. The Contractor shall segregate costs incurred on the Task Order (TO) at the lowest level of performance by TDL or the lowest level subtask stated in the TDL and shall also submit invoices reflecting costs incurred at that level. In addition, the Contractor shall also include summaries of work charged during the period covered; percentage of funds invoiced, expended, and budgeted; and an Estimate at Completion (EAC) at the level identified within each TDL to represent the estimated cost of tasking for the Period of Performance (PoP) of the TDL. For this CDRL the Contractor shall not submit data or invoices on a Contract Line Item Number (CLIN) or total contract basis.

Block 7: Deliverable submissions shall be submitted to the distribution list under block 14 and via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J Attachments).

Block 8: This CDRL format will not require Government approval. However, if the Contracting Officer’s Representative (COR) communicates errors found in either the data deliverable or the format, the COR will determine if immediate correction is warranted or can be corrected in the next deliverable submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10, 11, 12, and 13: The first data submission is due 10 business days after the first full month of TO performance and shall include data from TO award through the end of the first month of performance; this data shall also be submitted with the first invoice. Subsequent monthly data deliverables shall be submitted within 10 business days of the preceding month and with each monthly invoice. The data deliverable shall reflect the exact dollar amount and PoP as shown on the invoice. All data submittals shall be distributed to those identified in block 14.

Block 14: Distribution and submittal by electronic media. Electronic deliverables shall be compatible with Office 2010 unless otherwise approved by the Government. Distribution for format approval and data deliverables is as follows:

Format approval:

N/A

Monthly Data Deliverables:

“COR only” deliverable: COR and Naval Air Warfare Center Aircraft Division (NAWCAD) Procurement Group Procuring Contracting Officer (PCO) listed in Section A of the Contract “COR customer_TPOC” deliverable: COR, NAWCAD Procurement Group PCO, and Project Lead/TPOC

Procurement Group PCO 0 1 0

Project Lead/TPOC 0 1 0

15.TOTAL▬▬▬▬► 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Katy Gates 01/16/2024 Kevin P. Holland

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _0_ of _33_Pages.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE REQUIRED

SUBMISSION

DRAFT

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL FOR CONTRACTOR PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Data CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).

Item 10. Specify number of time data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.

Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.

Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV Item should normally be shown on the DD Form

1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___ADMN_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A002 Report, Record of Meetings/Minutes Trip Report/Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ADMN-81505 (See Block 16) SOW Para 3.1.5.1.2, 3.3.3.2.6 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) See Block 16 See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 4: Contractor format is acceptable if the intent of DI-ADMN-81505 is met.

Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 11: Data shall be as of the completion of the trip or meeting.

Blocks 12 and 13: Trip reports are due 15 calendar days after return from travel. Meeting minutes are due 15 calendar days after completion of meeting.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise approved by the Government.

15.TOTAL▬▬▬▬► 1 1 0

Katy Gates 01/16/2024 Kevin P. Holland

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _33_Pages.

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

REQUIRED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___MGMT _________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A003 Phase-Out Transition Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81945A SOW Para 3.1.8 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ONE/R ASREQ (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A N/A Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. If required, the Contractor shall submit the final deliverable within 30 calendar days of receipt of Government comments.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 12: Submit draft deliverable no later than 90 calendar days prior to the end of the Contract.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___MISC_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A004 Certification Data Report Organizational Conflict of Interest (OCI) Mitigation Plan & Non-Disclosure Agreement

(NDA) Status Certification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-82386 (See Block 16) SOW Para 3.1.10 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT (See Block 16) ASREQ (See Block 16) See Block16

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A (See Block 16) ASREQ ASREQ (See Block 16) Reg Repro

16. REMARKS ASI Division (See Block 16) 0 1 0 Block 4: Contractor format is acceptable but shall include all required information as documented in Clause 5252.209-9510.

Blocks 7 & 8: Government review and approval of the initial OCI Mitigation Plan will occur as part of the evaluation process and will not be required for initial submission of this CDRL. Updates required to the OCI Mitigation Plan, as a result of OCI arising during performance, will be executed in accordance with the guidance provided for Block 13.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10 & 12: The Contractor shall submit certification of compliance with the OCI Mitigation Plan to include a company-to-company NDA execution status within 20 business days of Contract/Task Order award.

Block 13: The Contractor shall resubmit within five business days of any changes in either compliance with the OCI Mitigation Plan or to company-to-company NDA status. If an OCI was not identified during the solicitation phase and one arises during performance, revision, and resubmission of the OCI Mitigation Plan is required within 10 business days of the OCI arising. The Government will review and respond within 10 business days. Government provided feedback will be adjudicated within five business days.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER____MGMT________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A005 Government Property (GP) Inventory Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-80441D SOW Paras 3.1.11, 3.3.5.1.4, 3.3.5.1.5, 3.3.5.1.6 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT MTHLY 30 DATO (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

N/A EORP (See Block 16) See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 0 1 0 Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 11: End of reporting period.

Block 12: Required 30 calendar Days After Task Order (DATO) award.

Block 13: Required monthly after initial submission.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___MGMT_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A006 NAVAIR Operations Security (OPSEC) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MGMT-81999A SOW Para 3.2.5 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ONE/R, See Block 16 ASREQ (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) See Block 16 See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 45 calendar days after Government approval of draft.

Block 9: Apply and use distribution statements in accordance with the Distribution Statement shown in Block 13 of DD Form 254 and the guidance of SECNAV M-5510.36B, Department of the Navy, Information Security Program.

Blocks 10, 12, and 13: Draft OPSEC Plan due 90 Days After Contract (DAC) award. Revisions required after approval of final plan only to comply with the Government Data Protection Policy Documents revisions.

Block 11: Data shall be as of the date the plan was submitted to the Government.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___MISC_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A007 Technical Report – Study/Services

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-MISC-80508B (See Block 16)

SOW Paras 3.3.1.1.9, 3.3.4.1.5, 3.3.4.4.7, 3.3.4.4.8, 3.3.4.5.3, 3.3.4.5.4, 3.3.4.5.18, 3.3.4.5.23, 3.3.4.5.24, 3.3.5.1.8, 3.3.6.1.2, 3.3.6.1.3, 3.3.6.1.6 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ (See Block 16) ASREQ (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) See Block 16 ASREQ (See Block 16) Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 4: Contractor format is acceptable if the intent of DI-MISC-80508B is met.

Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10, 12, and 13: Draft submission required within 10 business days of each completion of study/services.

Block 11: Data shall be as of the completion of the study.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

Katy Gates 01/16/2024 Kevin P. Holland

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER____IPSC________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A008 Software Development Plan (SDP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-IPSC-81427B SOW Para 3.3.1.2.9 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) See Block 16 ASREQ (See Block 16) Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 11: Data shall be as of the date the plan is submitted to the Government.

Blocks 12 and 13: Draft submission required within 20 business days of request by the COR.

Block 14: Distribution and submittal by electronic media wherever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER__NDTI__________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A009 Test Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80566A SOW Para 3.3.2.1.2 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ (See Block 16) 45DPTT (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10, 12, and 13: Draft submission required 45 calendar Days Prior to Test (DPTT).

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___NDTI_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A010 Test Procedure

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80603A SOW Para 3.3.2.1.3 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ (See Block 16) 45DPTT (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A See Block 16 Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10, 12, and 13: Draft submission required 45 calendar Days Prior to Test (DPTT).

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _10_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER____NDTI________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A011 Test/Inspection Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80809B NOT 2 SOW Paras 3.3.2.1.13, 3.3.4.2.6 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ (See Block 16) 15 DATC (See Block 16)

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A ASREQ (See Block 16) Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Blocks 10, 12, and 13: Draft submission required 10 calendar Days After Test Completion (DATC).

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _11_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER_____ILSS_______________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A012 Training Materials

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-ILSS-80872 NOT 2 (See Block 16) SOW Paras 3.3.2.2.1, 3.3.2.2.3, 3.3.3.1.4 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) See Block 16 ASREQ Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 4: Format will be identified in the Task Order (TO) or Technical Direction Letter (TDL) Statement of Work (SOW).

Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 11: Data shall be as of the completion of the training material.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _12_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER____IPSC________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A013 System/Subsystem Specification (SSS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-IPSC-81431A NOT 2 (See Block 16) SOW Paras 3.3.3.2.1, 3.3.3.2.3, ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A ASREQ Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 4: Format will be identified in the Task Order (TO) or Technical Direction Letter (TDL) Statement of Work (SOW).

Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _13_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER___SESS_________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A014 Product Engineering Design Data and Associated Lists

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-81000F (See Block 16) SOW Paras 3.3.3.2.1, 3.3.3.2.2, 3.3.3.2.4, 3.3.3.2.5, 3.3.3.2.8,

3.3.3.2.12 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A ASREQ Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 4: Format will be identified in the Task Order (TO) or Technical Direction Letter (TDL) Statement of Work (SOW).

Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _14_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0001, 0002, 0003, 0004, 0005, 0006, 0013 A TDP_______ TM_______ OTHER____SESS________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Air Platform Engineering & Integration Solicitation # N00421-24-R-0TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A015 Engineering Change Proposal (ECP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-SESS-80639E SOW Para 3.3.3.2.2 ASI Division

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

XX (See Block 16) ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE D (See Block 16) 11. AS OF DATE 13. DATE OF SUBSEQUENT

Draft Final

A (See Block 16) N/A ASREQ Reg Repro

16. REMARKS ASI Division (See Block 16) 1 1 0 Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/ Acceptance/Rejection form (See Contract Section J, Attachments).

Block 8: The COR has 30 calendar days to accept/reject each deliverable. If the COR does not respond within 30 calendar days, the Government automatically accepts the deliverable. Final is due 10 calendar days after receipt of Government comments on draft submission.

Block 9: Apply and use distribution statements IAW the Distribution Statement shown in Section C, SOW, Paragraph 3.2.4.

Block 14: Distribution and submittal by electronic media whenever possible. Electronic deliverables shall be compatible with the current authorized Navy Marine Corps Intranet (NMCI) version of Microsoft Office or Adobe Acrobat PDF unless otherwise

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _15_ of _33_Pages.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is…