This document is a sample template for responding to two sample tasks in a draft Request for Proposal (RFP) for the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Airborne Systems Integration (ASI) Division Air Platform Engineering & Integration (APE&I) procurement, solicitation number N00421-25-R-0002.
The sample tasks require the contractor to address various elements such as the team, assumptions, technical approach, performance risk analysis, work breakdown structure/schedule, models and tools, progress tracking, reports, level of effort, external factors, and cost optimization. This is a draft solicitation to obtain industry input and feedback, which should be provided by the specified deadline of 1:00 PM on October 2, 2024. The final solicitation will be a full and open competition for engineering and integration services supporting various airborne capabilities for the Department of Navy, Department of Defense, and other government agencies. The NAICS code is 541330 (Engineering Services) with a small business size standard of $47 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SAMPLE TASKS | N00421-25-R-0002 | ||
| Volume 1 - Technical | Attachment T1 | ||
| (Section L, Part B, paragraph 1.1) | Page 1 of 3 |
| Contractor Name: |
| Enter text here. |
I. SAMPLE TASK ONE (1)
Address the following in response to Sample Task One (1) in Section L, Part B, paragraph 1.1.1.1:
a.) Team:
b.) Assumptions:
c.) Technical Approach:
d.) Performance Risk Analysis:
e.) Work Breakdown Structure/Schedule:
f.) Models and Tools:
g.) Progress Tracking:
h.) Reports:
i.) Level of Effort:
j.) External Factors:
k.) Cost Optimization:
II. SAMPLE TASK TWO (2)
Address the following in response to Sample Task Two (2) in Section L, Part B, paragraph 1.1.1.2:
a.) Team:
b.) Assumptions:
c.) Technical Approach:
d.) Performance Risk Analysis:
e.) Work Breakdown Structure/Schedule:
f.) Models and Tools:
g.) Progress Tracking:
h.) Reports:
i.) Level of Effort:
j.) External Factors:
k.) Cost Optimization: