P1 (Cost Summary Spreadsheet) (002).xlsx

XLSX spreadsheet 37 KB Posted

Attached to
FACSFAC Field Maintenance Support Federal contract opportunity
Solicitation number
N00421-20-R-0158
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document contains a sources sought notice and draft statement of work for a field maintenance support contract. The Naval Air Warfare Center Aircraft Division is seeking field maintenance services for area control and surveillance systems including the Fleet Area Control and Surveillance Facility Air Control Tracking System, Stand Alone Radar Console, Integrated Range Status System, and Standard Terminal Automation Replacement System located at various sites. Interested small businesses are requested to submit a capabilities statement by June 4th, 2020 addressing their relevant experience, technical skills, and ability to perform at least 50% of the work. The requirement is anticipated to be a single-award IDIQ contract valued at approximately $388 million over five years, requiring facility and personnel security clearances.

View the file

Other files for this federal contract opportunity

Other files attached to FACSFAC Field Maintenance Support, newest first.
File Type Posted
FACSFAC Draft RFP_QuestionsAnswers.pdf PDF
Locator Form.doc DOC document
CPAQ Instructions.docx DOCX document
Data Transmittal Form.docx DOCX document
LIST OF APPLICABLE WAGE DETERMINATIONS FASCFAC.docx DOCX document
CPAQ.pdf PDF
PPIF.pdf PDF
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
OCI List.docx DOCX document
P1 (Cost Summary Spreadsheet).xlsx XLSX spreadsheet
FASCFAC Draft RFP.pdf PDF
CSP.docx DOCX document
P2 (Annual Fully Burdened Rates).xlsx XLSX spreadsheet
CPAQ.pdf PDF
OCI List.docx DOCX document
Data Transmittal Form.docx DOCX document
Locator Form.doc DOC document
PPIF.pdf PDF
CPAQ Instructions.docx DOCX document
CSP.docx DOCX document
LIST OF APPLICABLE WAGE DETERMINATIONS FASCFAC.docx DOCX document
Post Sources Sought Synopsis_N0042120R0158.docx DOCX document
03_Field Maintenance Support_CSS SOW V2.docx DOCX document
07_Field Maintenance Support CDRLs.docx DOCX document
DRAFT LOE.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A45, and A52.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For subcontractor cost summary sheets, delete Rows 54-97.
12When submitting this file, the instructions may be deleted.

Cost Spreadsheet (LOE)

COST SUMMARY SPREADSHEET (LOE)

Prime Offeror Name:
Subcontractor Name (if applicable):
GovtCTRYear 1Year 2Year 3Year 4Year 5Total
PositionCost ElementsLocations & Government Labor CategoryProposed Labor CategoryPay TypeF/PSite (G)Site (C)RateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
1Employee Name 1Manager / Operations Manager (Program Manager)*RGG9609609609609604800
2Employee Name 2Manager / Operations Manager (Project Manager)*RGG9609609609609604800
3Employee Name 3Program / Project / Management Analysts (Management Analyst)RGG9609609609609604800
4Etc.Total2880288028802880288014400
Locations & Labor Categories
ON-SITE FACSFAC SITES (5)
JACKSONVILLE, FL
Engineering Technician VI*RGC19203,84038403840384017280
OT1923843843843841728
Engineering Technician VRGC1344015,36015360153601536074880
OT13441,5361536153615367488
VACAPES, VA
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
Engineering Technician VRGC7680768076807680768038400
OT7687687687687683840
ST INIGOES, MD
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
SAN DIEGO, CA
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
Engineering Technician VRGC7680768076807680768038400
OT7687687687687683840
PEARL HARBOR, HI
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
Engineering Technician VRGC5760768076807680768036480
OT5767687687687683648
Total4857654,912549125491254912268224
Locations & Labor Categories
ON-SITE MARCORPS IRSS SITES (9)
TWENTYNINE PALMS, CA
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
CAMP PENDLETON, CA
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
CHERRY POINT, NC
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
OKINAWA, JP
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
TOWNSEND, GA
Engineering Technician VI*RGC192019201920192019209600
OT192192192192192960
Locations & Labor Categories105601056010560105601056052800
ON-SITE U.S. ARMY IRSS SITES (2)
FORT BRAGG, NC
Engineering Technician VI*RGC3840384038403840384019200
OT3843843843843841920
Engineering Technician VRGC5760576057605760576028800
OT5765765765765762880
105601056010560105601056052800

388224

0000000
Total Direct Labor Cost0000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost000000
Total Direct and Indirect Labor cost000000
COM
Total Prime Contractor Labor Cost000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
1Subcontractor Name 10000000
2Subcontractor Name 20000000
3Etc.0000000
Total proposed subcontractor labor cost and fee0000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF) 0

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs) 0

Grand Total of CPFF all CLINs

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$0ERROR:#DIV/0!

Page &P &F

KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:

Summary CLIN Summary Sheet

CLINS CLIN Description Total Hours Total Cost Total Fixed Fee Total Value $

Total

File details come from the government source that posted it. Updated .