About this file
This document is a Sources Sought notice for field maintenance support services. The Naval Air Warfare Center Aircraft Division Webster Outlying Field Air Traffic Control & Landing Systems Division requires maintenance support for Area Control Services Surveillance Systems including Fleet Area Control and Surveillance Facility Air Control Tracking System, Stand Alone Radar Console, Integrated Range Status System, and Standard Terminal Automation Replacement System located at various sites. Interested small businesses are requested to submit capabilities statements by June 4, 2020 demonstrating technical skills to perform tasks in the attached draft Statement of Work, as well as experience managing similar requirements and subcontractors. Responses must also address plans for small business prime contractors to perform 50% of work. The anticipated contract is a single award Indefinite Delivery Indefinite Quantity contract for five years with a total level of effort of 388,224 man-hours to be awarded as a small business set-aside.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER____MISC ________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| Technical Report – Study/Services |
| Equipment Maintenance Log Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-80508B (See Blk 16) |
| SOW Para. 3.3.2.2 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
| MTHLY |
| 15DARP (See Blk 16) |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
N/A
| EOM |
| 15DARP (See Blk 16) |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 4: Government will provide each site with “Equipment Log Books” (logbook with sequentially numbered pages) to report Monthly Maintenance Activity (MMA) as Government Furnished Equipment (GFE) and the format as Government Furnished Information (GFI).
Equipment Maintenance Log Report: Minimum Content of MMA
a) Site arrival and departure for watch standing duties.
b) Preventative maintenance actions.
c) Corrective maintenance actions.
d) Components replaced (include serial numbers of components removed and installed).
e) Swapping of archive media.
f) Playback events.
g) Configuration changes (i.e., Radar data removed from the system, new software, etc.).
h) Other relevant events.
Block 12 & 13: Reporting period is defined as the end of each month.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
17192 Aegis Way St. Inigoes, MD 20684-4012
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _1_ of _9_Pages.18. ESTIMATED TOTAL PRICE
17. PRICE GROUP
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
| FOR GOVERNMENT PERSONNEL |
| FOR CONTRACTOR PERSONNEL |
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Data CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed on the ASSIST website), or onetime DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).
Item 10. Specify number of time data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 12. Examples are: Tailoring of documents cited in item 4; Clarification of submittal dates in items 12 and 13; Explanation of reproducible copies in item 14.; Desired medium for delivery of the data item.
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the Contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the Contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or the data item.
Estimated Price - Cost to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the Contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency or submittal, preparation, control, and quality of the data item.
Estimated Price - Cost to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the Contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV Item should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Governments’ right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER__MGMT__________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A002 |
| Government Furnished Inspection Equipment Maintenance Report |
| Monthly Maintenance Activity (MMA) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80277 NOT 1 |
| SOW Para. 3.3.2.3 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
| MTHLY |
| 10DARP (See Blk 16) |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
N/A
| EOM |
| 10DARP (See Blk 16) |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 13 |
| 0 |
Block 12 & 13: Reporting period is defined as the end of each month.
Block 14: Provide each Government site supervisor a copy of that site’s report. Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copies due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 13 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _2_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER___MISC_____________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A003 |
| Trip/Travel Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MISC-81943 NOT 1 |
| SOW Para. 3.1.5.1 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
| See Blk 16 |
| 7DARP (See Blk 16) |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
N/A
| See Blk 16 |
| ASREQ |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (see Blk 16) |
| 0 |
| 1 |
| 0 |
Block 10: A Trip/Travel Report shall be required for each trip completed.
Block 11: Data shall be as of the completion of each trip.
Block 12: Reporting period is defined as the completion of each trip.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copies due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _3_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER__SESS__________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A004 |
| Validation Report |
| Independent Verification and Validation Test Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-SESS-80792B |
| SOW Para. 3.3.1.4 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
LT
| ASREQ |
| 7DATC (See Blk 16) |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
N/A
| See Blk 16 |
| ASREQ |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 11: Data delivered shall be as of the completion of the verification and validation test.
Block 12: Submit within seven (7) working days after completion of testing.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copies due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _4_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER___ILSS_________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A005 |
| Training Materials |
| On-The-Job Training Documents |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-ILSS-80872 NOT 1 |
| SOW Para. 3.3.3.2 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
XX (See Blk 16)
| ASREQ |
| ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
A (See Blk 16)
| See Blk 16 |
| ASREQ |
| Reg |
| Repro |
16. REMARKS
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 8: The Contractor shall have thirty (30) working days to submit the draft. The Government will have ten (10) working days for review and comment. The Contractor shall have fifteen (15) working days to incorporate Government comments and submit the final version.
Block 11: Data as of date shall be as directed at the time of request.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _5_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER__MGMT__________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A006 |
| Contractor’s Training Plan |
| New Hire Training Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-82151 |
| SOW Para. 3.3.3.1 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
XX (See Blk 16)
| 1TIME |
| 90DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
A (See Blk 16)
| N/A |
| ASREQ |
| Reg |
| Repro |
16. REMARKS
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 8: Acceptance will be by the Contracting Officer’s Representative (COR). If acceptance has not been transmitted within ten (10) working days of submission of the CDRL, the CDRL is considered accepted. Final due forty-five (45) days after Government approval of the draft.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copies due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _6_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER___MGMT_________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A007 |
| Operations Security (OPSEC) Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-80934C NOT 1 (See Blk 16) |
| SOW Para. 3.2.5 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
XX (See Blk 16)
| 1TIME |
| 90DAC |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
A (See Blk 16)
| N/A |
| ASREQ (See Blk 16) |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 4: Use the National Security Decision Directive (NSDD) 298 for the concept of operations security.
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).
Block 8: Acceptance will be by the COR. If acceptance has not been transmitted within ten (10) working days of submission of the CDRL, the CDRL is considered accepted. Final due forty-five (45) days after Government approval of the draft.
Block 13: Revisions as required after approval of final plan only to comply with Government data protection policy documents revision.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _7_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER____MGMT________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A008 |
| Contracting Officer’s Management Report |
| Segregation of Costs and Invoice Requirements Reporting |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-81864A |
| SOW Para. 3.1.3.1 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
XX (See Blk 16)
| See Blk 16 |
| See Blk 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
A
| N/A |
| See Blk 16 |
| Reg |
| Repro |
| 16. REMARKS |
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).
Blocks 10, 12, and 13: Draft format of this deliverable will be due ten (10) business days after award of the Contract. The Government has five (5) business days to comment. Final is due ten (10) days after Government approval of draft. If the Government does not reply within thirty (30) days, the CDRL is considered accepted. Report shall be submitted concurrently with each invoice to the COR and shall be for the exact dollar amount and period of performance as the invoice.
The Contractor shall segregate costs incurred under this Contract at the lowest level of performance rather than only on a Contract Line Item Number (CLIN) or total contract basis, and shall submit invoices reflecting costs incurred at that level. In addition, the Contractor shall submit invoices containing summaries of work charged during the period covered. The Contractor shall provide a percentage of funds invoiced and expended. The Contractor shall provide budgeted hours and an Estimate at Completion (EAC) to represent the estimated cost of tasking for the period of performance (PoP).
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _8_ of _9_Pages.18. ESTIMATED TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1000, 1001, 3000, 4000 |
| A |
| TDP_______ |
| TM_______ |
| OTHER__MGMT__________________ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| ATC&LS Field Maintenance Support |
| TBD |
| TBD |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A009 |
| Phase-Out Transition Plan |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| DI-MGMT-81945 NOT 1 |
| SOW Para. 3.1.8 |
| NAWCAD WOLF ATC&LS Division |
| 7. DD 250 REQ |
| 9. DIST STATEMENTREQUIRED |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
XX (See Blk 16)
| 1TIME |
| See Blk 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENTSUBMISSION |
| Draft |
| Final |
A (See Blk 16)
| N/A |
| N/A |
| Reg |
| Repro |
16. REMARKS
Block 7: Acceptance will be by the Contracting Officer’s Representative (COR) via the Data Item Transmittal/Acceptance/Rejection form (See Contract Section J Attachments).
| NAWCAD WOLF ATC&LS Division (See Blk 16) |
| 0 |
| 1 |
| 0 |
Block 8: Acceptance will be by the Contracting Officer’s Representative (COR). If acceptance has not been transmitted within thirty (30) working days of submission of CDRL, the CDRL is considered accepted. The Contractor shall have five (5) working days to incorporate Government comments.
Block 12: Data to be delivered ninety (90) days prior to the end of contract.
Block 14: Deliverables to be provided in electronic format (Microsoft 2010 or greater). Hard copy due only upon request.
Block 14 Address:
Department of the Navy Commander, NAVAIRWARCENACDIV ATTN: Michelle Passfeld, NAWCAD WOLF ATC&LS Division
BLDG 8270
| 15.TOTAL▬▬▬▬► |
| 0 |
| 1 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page _9_ of _9_Pages.18. ESTIMATED TOTAL PRICE