This sources sought notice requests capability statements from small businesses to provide field maintenance services for area control surveillance systems at various Fleet Area Control and Surveillance Facility sites. Interested parties must submit responses by June 4th, 2020 detailing their technical capabilities and experience in areas such as maintenance of communication and detection equipment, management of subcontractors, and ability to perform at least 50% of the work. The Naval Air Warfare Center Aircraft Division will evaluate responses to determine if a small business set-aside is appropriate for a future single-award IDIQ contract valued at approximately $388 million over five years to provide preventative and corrective maintenance for systems including the Air Control Tracking System, Stand Alone Radar Console, Integrated Range Status System, and Standard Terminal Automation Replacement System. The incumbent is KBRWyle under SeaPort-e contract N00178-14-D-7748-M801. A DD Form 254 is required, and the work involves secret-level facilities and information.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0018 Enclosure (3)
N00421-18-RFPREQ-4K0000T-0011
Enclosure (3) Contract Surveillance Plan for Integration and Production Services
1. Purpose
This Contract Surveillance Plan (CSP) document is developed and applied by the Government to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
This Contract is to provide in-service engineering support of combat identification and multi-mission data link systems; production and fabrication of system and sub-system components; integration of system and subsystem components; shipping of systems, sub-systems, components, and parts; development of training curriculum, training materials, and delivery of formal training programs; logistics engineering support; supply system management and material control; testing of combat identification and multi-mission data link systems; repair of combat identification and multi-mission data link systems; laboratory maintenance; QA; and technical management support. The tasking may also include providing of combat identification and multi-mission data link systems technical assistance by phone, electronic mail or on-site aboard U.S. Navy ships, onboard shore installations, at the pertinent host country, aboard the host country’s ships, or at other sites as directed by the U.S. Government.
This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The Contract will have five (5) one-year ordering periods. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E - Inspection and Acceptance which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant orders.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The anticipated PCO for this Contract is Stacey MacMillan. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract and safeguards the interests of the U.S. in the contractual relationship. The KO assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms or conditions shall be referred to the KO for action.
GPL: The GPL is responsible for assisting in administering of specific efforts under the Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments, or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful Offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the checklist provided herein.
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the Contractor, the COR, and GPLs while Enclosures (1) and (3) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing monthly reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): Surveillance Activity Checklist (SAC) Enclosure (2): Quarterly Evaluation By CDRL Enclosure (3): Annual Surveillance Summary N00421-16-R-0059
N00421-18-RFPREQ-4K0000T-0014
Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
ENCLOSURE (1): SAC
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of SB, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
| Description |
| Surveillance Method/Measure |
| Dates |
| Quality Assessment |
| Schedule Assessment |
| Cost Control Assessment |
| Business Relations Assessment |
| Management Assessment |
| Utilization of SB Assessment |
| Other Areas Assessment |
| Provide system integration IAW SOW paragraph 3.3.1 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide production & fabrication IAW SOW paragraph 3.3.2 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide in-service engineering IAW SOW paragraph 3.3.3 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide training IAW SOW paragraph 3.3.4 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide logistics engineering IAW SOW paragraph 3.3.5 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide supply and material control IAW SOW paragraph 3.3.6 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide testing IAW SOW paragraph 3.3.7 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide repair IAW SOW paragraph 3.3.8 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide QA IAW SOW paragraph 3.3.9 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide lab/test bed management IAW SOW paragraph 3.3.10 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide spectrum IAW SOW paragraph 3.3.11 |
| 100% Inspection by COR/ACOR and/or GPLs |
| Provide technical management IAW SOW paragraph 3.3.12 |
| 100% Inspection by COR/ACOR and/or GPLs |
Enclosure (1)
N00421-18-RFPREQ-4K0000T-0011
Enclosure (1)
Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY See FAR 2.101 and 3.104
ENCLOSURE (2): QUARTERLY EVALUATION BY CDRL
| Description |
| Surveillance Method/Measure |
| Dates Due |
| Dates Completed |
| No. Submittals |
| No. of Req’d Rework |
| Percentage On Time |
| Comments |
| A001: Contracting Officer's Management Report - Segregation of Cost and Invoice Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A002: Engineering and Technical Services Accomplishment Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A003: Performance and Cost Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A004: Management Plan - Labor Mix Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A005: Trip/Travel Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A006: Technical Assistance Performance Evaluation (TAPE) Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A007: Phase-Out Transition Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A008: NAVAIR Operations Security (OPSEC) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A009: ISO 9001:2015 Certificate of Compliance |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A010: Installation Control Drawings |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A011: Engineering Drawings |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A012: Drawings - Wiring and Cabling Drawings |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A013: Manuals - Technical Manual, Maintenance Manual, Operator Manual, Installation |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A014: Software User Manual |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A015: DOD Material Procedured for Development and Application of Packaging Requirements - Handling and Transportation Manual |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A016: Scientific and Technical Reports - Technical Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A017: Technical Data Report - System Performance Report (Availability/Reliability) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A018: Report - Test Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A019: Critical Defect Investigation Report - Defect Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A020: Safety Assessment Report (SAR) - System Safety Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A021: Technical Report - Study/Services - Engineering Analysis |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A022: Failure Summary and Analysis Report - Failure Analysis |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A023: Training Program Structure Document |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A024: Commercial Asset Visibility (CAV) Reporting - Commercial Asset Visibility (CAV) Inventory Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A025: Test/Inspection Report - Repair Action Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A026: Report of Shipping (Item) and Packaging Discrepancy - Material Receipt Discrepancy Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A027: Status Report - Order Status Report, Contractor Deliverable Schedule and Status Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A028: Repair Procedure |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A029: System Safety Program Plan (SSPP) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A030: Training Materials - IFF Maintenance Course Training Materials |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A031: Student Guide - Training Aids |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A032: Test Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A033: Test Procedure |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A034: Requirements Traceability Verification Matrix (RTVM) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A035: Provisioning Parts List (PPLs) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A036: Logistics Product Data - Logistics Support Analysis Record |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A037: Configuration Management Guidance - Physical Configuration Audit |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A038: Priced Bill of Materials - Build List |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A039: Engineering Change Proposal |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A040: Maintenance Index Pages (MIPS) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A041: Maintenance Requirements Cards (MRC) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A042: Schedules - Equipment Delivery Schedule |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A043: Schedules - Project Schedule |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A044: Schedules - Equipment Calibration Schedule |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A045: System/Subsystem Specification (SSS) - Systems Specifications, Requirements Specifications, Interface Specificationsv |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A046: Quality Management System (QMS) - Quality Management Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A047: Status Reports - Project Status Reports |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A048: Presentation Material - Briefs |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A049: Statement of Work (SOW) |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A050: Inventory/Utilization Data Report |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A051: Report of Receipts, Inventory, Adjustments, and Shipments of Government Property |
| 100% Inspection by COR/ACOR and/or GPLs. |
| A052: Program Management Plan |
| 100% Inspection by COR/ACOR and/or GPLs. |
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (2)
N00421-18-RFPREQ-4K0000T-0011
Enclosure (2)
ENCLOSURE 3: ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
| Description |
| Surveillance Method/Measure |
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings |
| Schedule |
| Review of Quarterly Ratings |
| Cost Control |
| Review of Quarterly Ratings |
| Business Relations |
| Review of Quarterly Ratings |
| Management |
| Review of Quarterly Ratings |
| Utilization of SB |
| Review of Quarterly Ratings |
| Other Areas |
| Review of Quarterly Ratings |
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality – Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule – Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contributed to or affected the schedule variance. Also address the significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost Control – Assess the Contractor’s effectiveness in forecasting, managing, and controlling contract cost. If the Contractor is experiencing cost growth or under-run, discuss the causes and Contractor-proposed solutions. For contracts where task or contract sizing is based upon Contractor-provided person-hour estimates, assess the relationship of these estimates to ultimate cost. Also, assess the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort. In addition, assess the extent to which the Contractor demonstrates a sense of cost responsibility through the efficient use of resources in each work effort.
Management – Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract, identifies and applies resources required to meet schedule requirements, assigns responsibility for tasks/actions required by the Contract, and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the Contract and issued TOs.
Utilization of SB – Assess the Contractor’s success in utilizing and meeting SB goals.
Regulatory Compliance – Assess compliance with all terms and conditions in the contract relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (i.e. Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract terms and conditions.
Other Areas – Assess additional evaluation areas unique to the Contract and issued TOs, or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.