N00421-19-R-0069 Amendment 0005.pdf
PDF 2 MB Posted
- Attached to
- Advanced Sensor System Development and Execution (ASSDE) Federal contract opportunity
- Solicitation number
- N00421-19-R-0069
About this file
This sources sought announcement from the Naval Air Systems Command solicits capability statements from businesses for an advanced sensor system development and execution effort. The single award IDIQ contract will have a five year ordering period and utilize CPFF labor categories and cost reimbursable ODCs. Services include design, development, and demonstration of sensor technologies such as ISR, EO/IR, HSI/MSI, LIDAR, RADAR, ELINT, SIGINT, CBRNE, and SONAR for airborne, shipborne, and ground platforms. Capability statements are due by March 29, 2019 and must demonstrate experience in areas such as engineering, software, and program management. The place of performance is expected to include government sites, Yuma Proving Ground, and contractor facilities. A facility clearance and ITAR registration are required.
View the file
Other files for this federal contract opportunity
Show all 50
Advanced Sensor System Development and Execution (ASSDE) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 12:00 PM local time 16 Dec 2019
X
A
X B
X C X D
EX
X
G
F 118 - 128
129 - 157
X H 158 - 164 sarah.erly@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 164
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00421 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 3 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
SARAH ERLY 301-757-0841
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 9
10 - 25
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
26 - 65
66 - 67
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
68 - 69
70 - 72 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 73 - 78 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 79 - 90 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
91 - 116
PART II - CO NTRACT CLAUSES
NAVAL AIR WARFARE CENTER AD
CODE 2.5.1.3, BLDG 433, 47060 LILJENCRANTZ RO
PATUXENT RIVER MD 20670
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
31 Oct 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0042119R0069
Section A - Solicitation/Contract Form
GOVERNMENT POINTS OF CONTACT
Contract Specialist: Sarah Erly
Phone: 301-757-0841
Email: sarah.erly@navy.mil
Contracting Officer: Carolyn Emmart
Phone: 301-757-4074
Email: carolyn.emmart@navy.mil
Procuring Contracting Officer: Thomas Stann
Phone: 301-757-0031
Email: thomas.stann@navy.mil
VERBIAGE & TERMINOLOGY
For clarification purposes, throughout this solicitation, Cost-Plus-Fixed-Fee (CPFF) Term, Cost-Plus-Fixed-Fee
(CPFF) Level of Effort, and Cost Plus Fixed-Fee (CPFF) Non-Performance Based are used interchangeably. For clarification purposes, throughout this solicitation, Cost-Plus-Fixed-Fee (CPFF) Completion and Cost-Plus-Fixed-
Fee (CPFF) Performance Based are used interchangeably.
PRODUCT SERVICE CODE
The basic contract of this Single-Award Indefinite Delivery/Indefinite Quantity, Cost-Plus-Fixed-Fee and Cost
Reimbursable vehicle will have an associated Product Service Code (PSC) of AC63, Defense System –
Electronics/Communication Equipment (Advanced Development).
CONTRACT TYPE
This solicitation is a Small Business set-aside and the resulting contract will be a Single-Award Indefinite
Delivery/Indefinite Quantity contract utilizing Cost-Plus-Fixed-Fee (CPFF) CLINs for Labor (Term and
Completion) and Cost Reimbursable CLINs will be used for Other Direct Costs (Travel and Material). The anticipated ordering period is five (5) years.
ANTICIPATED NUMBER OF TASK ORDERS/CLINS:
The following information is the Government’s best estimate and is provided for situational awareness only.
-CPFF Labor Term tasking demands may yield approximately 10 Task Orders (TOs) per year with 15 CLINs on each TO for a total of 150 CLINs. The total number of CLINs for the duration of the contract will be approximately
750 CLINs.
-CPFF Labor Completion Tasking demands may yield approximately 3 Task Orders (TOs) per year with 6 CLINs.
The total number of CLINs for the duration of the contract will be approximately 90 CLINs.
-The Government anticipates that the first Task Order (TO) will be issued approximately 30 days after Contract award.
NOT SEPARATELY PRICED CLINS
Not Separately Price (NSP) Appropriation Type CLINs and a NSP Data CLIN will be on the Basic IDIQ Contract, whereas, at the Task Order Level, CLINs will be separately priced along with NSP Data CLINs. At the IDIQ level, CLINs 0001, 0006, 0011, 0016, and 0021 will contain the overall ceiling for CLINs 0002-0005, 0007-0010, 0012-
0015, 0017-0020, and 0022-0025, respectively.
mailto:sarah.erly@navy.mil mailto:carolyn.emmart@navy.mil mailto:thomas.stann@navy.mil
COLLABORATION LANGUAGE
The Government expects a significant amount of interplay between three large acquisitions (Irregular Airborne
Platform Engineering (IAPE), Advanced Sensor System Development and Execution (ASSDE) and Advanced
Software, Computer, and Network Development and Integration (ASCNDI)) being procured by Naval Air Warfare
Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF), Airborne Systems Integration (ASI)
Division. The demands of the projects and the inherent nature of rapid technological development necessitates cooperative contractor interaction to achieve the successful completion of each individual effort and an overall unified outcome. Therefore, while these efforts represent three distinct contracts, offerors are advised that all awarded contractors and their subcontractors will be expected to collaborate and work with the contractors and subcontractors for the other efforts.
Furthermore, it is anticipated that ASI Division will have additional acquisitions other than the three large acquisitions identified above. All awarded contractors and their subcontractors supporting any of the ASI Division procurements are expected to collaborate and work with the contractors and subcontractors for the other ASI
Division procurements.
AMENDMENT 0001
Responses to questions from industry are outlined below. All submissions shall be made in accordance with Block 9 of the Soliciation cover page.
1. Question 1: Proposals are due at noon on 2 December 2019, the Monday after Thanksgiving. As this solication is a small business set aside, and many of our personnel have made plans to spend time with friends and family during the holiday, would the Government consider extending the proposal period by at least one week in order to enable offerors to provide a high quality proposal?
Answer 1: The Government agrees to extend the due date of proposals to Thursday, 05 December 2019 at
12:00 p.m. Eastern Standard Time. Please note that all other submission requirements remain the same.
2. Question 2: On pages 131-2, paragraph 1.3.7 and subparagraphs, the Government specifies the requirements for offerors to provide their Small Business Utilization Strategy (Annex 1) as a part of their overall Management Approach. Since “This requirement is being set-aside for small business,” (per page
137, paragraph 3.3.7), would the Government consider eliminating the requirement for a Small Business
Utilization Strategy?
Answer 2: This procurement is a small business set-aside; however, offerors are still required to provide their Small Business Utilization Strategy (Annex 1) as a part of their overall Management Approach. A
Small Business Utilization Strategy is not the same as a Small Business Subcontracting Plan that a large business would be required to submit in a full and open competition.
AMENDMENT 0002
Changed made to Solicitation N00421-19-R-0069 and responses to questions from industry via Amendment 0002 are outlined below. The proposal due date has changed. All submissions shall be made in accordance with Block 9 of the Soliciation cover page.
1. Question 1: On page 2 of the solicitation, the Government indicates that Cost-Plus-Fixed-Fee (CPFF)
Term is interchangeable with CPFF Level-of-Effort and CPFF Non-Performance Based; and that CPFF
Completion is interchangeable with CPFF Performance Based; but the Government does not define “Term” or “Completion” in this or any other context. Can the Government further clarify these terms?
Answer 1: For the purpose of this contract, we will defer to the definitions in the FAR. Per FAR
16.306(d)(1) a cost-plus-fixed-fee contract may take one of two basic forms-completion or term. The completion form describes the scope of work by stating a definite goal or target and specifying an end product. This form of contract normally requires the contractor to complete and deliver the specified end product (e.g., a final report of research accomplishing the goal or target) within the estimated cost, if possible, as a condition for payment of the entire fixerd fee. However, in the event the work cannot be completed within the estimated cost, the Government may require more effort without increase in fee, provided the Government increases the estimated cost.
Additionally, FAR 16.306(d)(2) states that the term form describes the scope of work in general terms and obligates the contractor to devote a specified level of effort for a stated time period. Under this form, if the performance is considered satisfactory by the Government, the fixed fee is payable at the expiration of the agreed-upon period, upon contractor statement that the level of effort specified in the contract has been expended in performing the contract work. Renewal for further periods of performance is a new acquisition that involves new cost and fee arrangements.
2. Question 2: The P1 – Past Performance Information Form seems to have a flaw that causes the following text blocks to auto-populate with the same data: “Offeror Name,” “Division Name,” “CAGE Code,”
“DUNS Number,” and “PSC.” As a result, you cannot put different (correct) data in these different lines.
Would the Government replace the P1 with a form that does not have this flaw?
Answer 2: The Government has identified the errors in the P1 and has replaced the attachment.
3. Question 3:. Can the Government confirm Offerors are to provide 1 original, 1 paper copy, and 1 electronic copy or are offerors only required to provide 1 electronic copy of the SOW/PWS for each contract reference listed in Volume 2? See Section L, Part A, 3.3 and Section L, Part B, 2.1.3.
Answer 3: The Government confirms that the language in Section L, Part A, paragraph 3.3 of the RFP is correct. Offerors are to provide 1 original, 1 paper copy, and 1 electronic copy of the SOW/PWS for each contract reference listed in Volume 2. Section L, Part B, paragraph 2.1.3 of the RFP is updated to state
“Offerors shall provide the Statement of Work (SOW)/Performance Work Statement (PWS) in Annex 2 for each contract reference and cross reference how each provided contract aligns to the RFP SOW/PWS.”
4. Question 4: Can the Government confirm the Cross Reference Matrix (CRM) included in Volume I:
Technical is to cross reference the proposal volumes (i.e., Volumes 1, 2, and 3) and paragraphs or is the
CRM only intended to cross reference Volume I paragraphs? See Section L, Part A, 3.5.
Answer 4: In Section L, Part A, paragraph 3.5 of the RFP, the Cross Reference Matrix (CRM) included in
Volume I: Technical is to cross reference only Volume I: Technical paragraphs. The language in Section L, Part A, paragraph 3.5 of the RFP is updated to state that the CRM in this section is applicable to Volume I:
Technical only.
5. Question 5: On page 132, volume L, Section 2, paragraph 2.1.2.1 states that offer my choose one of two options for the attachment P1. If the offer chooses option ii, is there a page limit on that contract description, or is it unlimited?
Answer 5: In Section L, Volume 2, paragraph 2.1.2.1 of the RFP, if the Offeror chooses option ii, there is no page limit requirement.
6. Question 6: Due to the complexity and length of the sample tasks, and the sample tasks not being part of the draft RFP that was released we are requesting that the proposal due date be extended until December
12th.
Answer 6: The proposal due date has changed. Please see Block 9 of the RFP for the updated due date.
7. Question 7: Will the Sample Tasks be awarded with the overall IDIQ?
Answer 7: No, the Sample Tasks are for evaluation purposes only and will not be awarded with the overall
IDIQ.
8. Question 8: Will any task order be awarded with the initial IDIQ award?
Answer 8: A Task Order fulfilling the minimum guarantee, as stated in NAVAIR Clause 5252.216-9506, will be issued at contract award or the following day; however, per Section A of the RFP, the Government anticipates that the first Task Order will be issued approximately 30 days after Contract award.
9. Question 9: Are offerors required to include a price proposal in Volume 3 for the sample tasks? Section L, Part B, 1.1.1.1.1.8 & 1.1.1.2.1.8.
Answer 9: No, Offerors shall not include any price information in Volume 3 for the Sample Tasks.
10. Question 10: Please clarify this section should be 1.1 and that this a mis numbering. Page 124, Section 3.3, Volume I Section 1.1.1.
Answer 10: The Government confirms that in Section L, Volume 3.3 chart, Volume 1, paragraph 1.1.1
Understanding of the Work-Sample Tasks in the RFP is a typo. The paragraph should be 1.1. The
Government corrected Section L, Part A, Paragraph 3.3 chart, column “Volume 1”, paragraph/subgraph 1.1 instead of 1.1.1 in the RFP.
11. Question 11: Is there a preferred template for this letter of consent? Please provide. Page 132, Section L, 2.1.2: Past Performance.
Answer 11: There is no formal template and the Contractor format is acceptable.
12. Question 12: Please confirm that an SB Joint Venture, bidding as a prime contractor, is limited to submitted two past performance references for each of the Prime Joint Venture members. Page 132, Section
L, 2.1.2: Past Performance.
Answer 12: If the Small Business Joint Venture has previous past performance records for the same Joint
Venture, then no more than five Past Performance Information Forms may be submitted for that Joint
Venture. However, each Joint Venture member may also submit two additional Past Performance
Information Forms that are specific to the individual member. In a case of a Small Business Joint Venture without a record of relevant past performance, the Small Business Joint Venture is limited to two past performance references for each of the Joint Venture members. The Government has updated the language in Section L, Volume 2, paragraph 2.1.2 of the RFP to better clarify this requirement.
13. Question 13: If bidding as an unpopulated joint venture prime, should both members submit their respective Total Professional Employee Compensation Plans? Page 155, Section M, paragraph 3.2.
Answer 13: Yes. If an Offeror is bidding as an Unpopulated Joint Venture Prime, then both members shall submit their respective Total Professional Employee Compensation Plans.
14. Question 14: Section L, paragraph 1.5 defines a principal subcontractor as a subcontractor who provides at least 20% of the total price/cost. Because all ODCs will be bid by the prime will the Government consider updating the definition to be 20% of the labor cost only. Given that this is a small business set aside and the small business prime must do 51% of the total labor cost there is the potential for conflict between this definition and the set aside limitation. Please clarify.
Answer 14: The Government considers these as two separate definitions. Section L, paragraph 1.5 of the
RFP correctly defines “principal subcontractor” as a subcontractor who provides at least 20% of the proposed total price/cost (excluding the Offeror’s profit/fee), for the contract or provides one or more Key
Personnel. It is also correct that this requirement is being set-aside for a small business. As such, each
Offeror’s proposal shall comply to 52.219-14 Limitations on Subcontracting (Deviation 2019-O0003)(JAN
2019).
15. Question 15: Section L, Sample Task 1 requires detection and tracking of multiple targets simultaneously, this requirement has a significant impact on the sensors and processing required. Are there threshold and objective requirements on the numbers of the targets to be simultaneously detected and tracked?
Answer 15: Yes. The threshold requirement is a minimum of three (3) targets to be simultaneously detected and tracked. The objective is ten (10) targets to be simultaneously detected and tracked. The
Government has updated Section L, paragraph 1.1.1.1, Sample Task 1, paragraph b of the RFP to state
“The expected product deliverable’s threshold requirement is a minimum of three (3) targets to be simultaneously detected and tracked. The objective is ten (10) targets to be simultaneously detected and tracked.”
16. Question 16: Based on the above and the impact of the changes/non-changes we are requesting a two week extension to the proposal due date.
Answer 16: As stated in Answer 6 of Amendment 0002, the proposal due date has changed. Please see
Block 9 of the RFP for the updated due date.
17. Question 17: We are also unable to access the beta SAM site now that is taking the place of FBO. Can you provide a status for when we will be able to access the beta SAM site to receive solicitation updates? Please also take this into consideration when reviewing the request for proposal due date extension.
Answer 17: As of 12 November 2019, beta.SAM.gov is up and operational. Contractors are required to have a beta.SAM.gov account in order to see RFP activity as of the transition date. Should contractors have issues using beta.SAM.gov, they should contact the Federal Service Desk at www.fsd.gov.
18. Question 18: The past performance table in section L paragraph 2.1.3 include a reference to SOW
Paragraph 3.3.7.4. However, the SOW does include a Paragraph 3.3.7.4. Please clarify.
Answer 18: The Government has updated Section L, Part B, paragraph 2.1.3 chart in the RFP by removing
3.3.7.4 from the N00421-19-R-0069 SOW/PWS Paragraph column.
In addition to addressing the questions from Industry, it was determined that the following revisions were necessary to the Solicitation.
Additional Changes Made by the Government:
1. Section L, Part B, Volume 2, paragraph 2.1.4 of the RFP has been updated from “The primary source of past performance information will be PPIRS. If a Contractor Performance Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance for that contract/order will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment P2, to the Program
Manager who is the Assessing Official. The Offeror shall include instructions for the Program Manager to send completed questionnaires within two weeks of its receipt via e-mail to Sarah Erly, Contract Specialist, at sarah.erly@navy.mil AND Carolyn Emmart, Contracting Officer, at carolyn.emmart@navy.mil thereby allowing the customer approximately two weeks to complete their response. All CPAQs should be received by Sarah Erly and Carolyn Emmart by the solicitation due date” to now state:
“The primary source of past performance information will be PPIRS. If a Contractor Performance
Assessment Report (CPAR) exists for multiple years for the same contract/order, all periods of performance for that contract/order will be used for evaluation. In the event a CPAR does not exists for a http://www.fsd.gov/ past performance reference, the Offeror shall submit a Contract Performance Assessment Questionnaire
(CPAQ), Attachment P2, to the Program Manager, who is a Government employee and the Assessing
Official. The Offeror shall include instructions for the Program Manager to send completed questionnaires within two weeks of its receipt via e-mail to Sarah Erly, Contract Specialist, at sarah.erly@navy.mil AND
Carolyn Emmart, Contracting Officer, at carolyn.emmart@navy.mil thereby allowing the Government
Assessing Official approximately two weeks to complete their response. All CPAQs should be received by
Sarah Erly and Carolyn Emmart by the solicitation due date.”
2. Section K, Clause 52.204-8(2)(iv)and(v) of the RFP has been updated to remove the X next to both subparagraphs of this clause.
3. Section L, Part B, paragraph 3.3.7 of the RFP has been updated from “This requirement is being set-aside for a small business. Provide a breakout to demonstrate how the prime contractor or the prime contractor combined with a similarly situated entity will perform at least 50% of the cost of the contract incurred for personnel with its own employees for each period of performance in accordance with FAR clause 52.219-
14. Cost of contract incurred for personnel includes direct labor cost, overhead that has only direct labor as its base, and the small business’s General and Administrative (G&A) rate multiplied by the labor cost” to now state:
“This requirement is being set-aside for a small business. Provide a breakout to demonstrate how the prime contractor or the prime contractor combined with a similarly situated entity will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 50 percent subcontract amount that cannot be exceeded.”
4. Section M, Part B, paragraph 3.3, (specifically the 2nd paragraph) of the RFP has been updated from
“Because this is a set-aside competition, the contractor’s compliance to FAR Clauses 52.219-14
“Limitation on Subcontracting” will be assessed as an element of responsibility. An Offeror’s proposal that fails to meet the limitation on subcontracting during each period of performance shall not be considered for award” to now state:
“Because this is a set-aside competition, the contractor’s compliance to 52.219-14 Limitations on
Subcontracting (Deviation 2019-O0003)(JAN 2019) will be assessed as an element of responsibility. An
Offeror’s proposal that fails to meet the limitation on subcontracting during each period of performance shall not be considered for award.”
5. Section K, Clause 52.219-1(b)(1)and(2) of the RFP has been updated to state the NAICS code for this RFP and the small business size standard for this RFP.
AMENDMENT 0003
Question 1: In reference to Q&A #5 - is it the intention of the Government to potentially review and evaluate hundreds of pages of past performance information? By making the page count unlimited it is and based on how broad the SOW is, it is certainly possible to provide extremely long and detailed responses describing similar work we have performed in the past.
Answer 1: Section L, Part B, Volume 2, paragraph 2.1.2.1(a)(ii) allows offerors to submit a second PDF or
MS Word document to provide the required information for the Contract Description Box of the
Attachment P1. While Amendment 0002 of this RFP gives no page limit to this document, the Government reminds Offerors that the narrative on each Past Performance Information Form, Attachment P1, in the
“Contract Effort Description” should clearly describe how each contract reference has relevant work effort that matches the relevancy definitions specified in Section M of the solicitation.
mailto:sarah.erly@navy.mil mailto:carolyn.emmart@navy.mil
Section M, Part B, 2.0 Past Performance, specifically the second paragraph, states “The second aspect of the past performance evaluation is to assess how relevant the past performance being evaluated is to the requirements of this solicitation. When evaluating relevancy, which includes the similarity of scope, complexity, and magnitude of the past performance to the current solicitation, the Government will focus on performance similar to the SOW/PWS paragraphs. . .” Based on those restrictions the Government believes that while there is no page limit specified, an offeror can provide a detailed response within a reasonable amount of pages.
Further, Offerors are also advised to review Section L, Part A, paragraph 1.2, which emphasizes clarity, brevity, and logical organization during proposal preparation. The Government’s intent is to receive quality responses to the RFP regardless of page restrictions.
Question 2: On beta.sam.gov to the ASSDE active Notice ID: N00421-19-R-0069 as of Nov 15 access is allowed to only 2 documents: N00421-19-R-0069_Amendment_0002.pdf and Attachment P1_-_P1 Past
Performance Information Form.pdf. How does one obtain access to the other documents such as
Attachments, Exhibits and ASSDE_SOW from Nov 15?
Answer 2: Beta.SAM allows you to access all previous attachments and links associated with the subject
Solicitation. To see all previous information, after searching for the subject RFP, you will see a link on the left hand side that says “history” which you can click on to access the original RFP posting and attachments. Additionally, in the “attachments/links” tab, also on the left hand side of the page you should be able to access all previous attachments posted for this RFP. Should an Offeror have issues using
Beta.SAM for the new contracting opportunities functionality, they should contact the Federal Service
Desk at www.fsd.gov.
Question 3: In regards to Question 8, Amendment 0002, when the Government stated in Answer 8 “the first Task Order will be issued approximately 30 days after Contract award” does the Government mean the
“first” Task Order for actual tasking of this contract?
Answer 3: Yes. The Government plans to issue the first Task Order, which will have actual tasking related to this contract, approximately 30 days from Contract award.
AMENDMENT 0004
The Government has made the following changes to the RFP:
1. Attachment 03 - OCI List, specifically the supplier/contractor title "Cherokee Nation Technologies" and address "777 West Cherokee St., Catoosa, OK 74015" have been changed to "Cherokee Nation Strategic
Programs" and "10838 E. Marshall St. Ste 200 E, Tulsa, OK 74116.”
AMENDMENT 0005
1. Question 1: Answer 2 from Amendment 2, referenced that “The Government has identified the errors in the P1 and has replaced the attachment.” The Attachment P1 on beta.sam.gov still has an error in the
Task/Delivery Order entry field on page 1. It is directly linked to the entry field underneath Demonstrated
Systemic Improvement Information text on page 2, such that when you enter text in one field the PPIF form automatically populates the other field with the same text – and vice versa. In other words, the PPIF form does NOT currently allow separate text entries in these two separate fields. Is the Government correcting this matrix/data entry issue?
Answer 1: The Government agrees and has resolved the error described above in the Attachment P1. The
Attachment P1 has been replaced. Offerors should use the P1 attachment associated with Amendment 0005 so that all separate fields can be completed correctly.
2. Question 2: On page 6, under additional changes by the Government, #1, the requirement that a CPAQ must be completed by a Government employee. This eliminates the possibility of using contracts, even those that closely mirror the ASSDE SOW, that were funded commercially (although in support of capture of Government contracts). Will the Government remove the requirement that all past performance references must be completed by a Government employee?
Answer 2: The Government confirms the revised language in Section L, Part B, Volume 2, paragraph 2.1.4 of the RFP as communicated in solicitation amendment 0002 on page 6, under Additional Changes Made by the Government, number 1, is accurate. The Government will not remove the requirement that the
Contract Performance Assessment Questionnaire (CPAQ), Attachment P2, is to be completed by a
Government employee.
3. Question 3: I would like to confirm you will be accepting proposals for Advanced Sensor System
Development and Execution (ASSDE) through 16 DEC 2019.
Answer 3: Proposal submissions must be received by the date and time specified in Block 9 of the most current solicitation amendment cover page. The Government did not revise the proposal due date or time as a result of this solicitation amendment.
Section B - Supplies or Services and Prices
B-1
I. Hourly Burdened Composite Labor Rates (excluding fee) and Streamlined Ordering Procedures for
Cost Plus Fixed Fee (CPFF) Labor Term CLINs and/or Orders
(a) Hourly Burdened Composite Labor Rates (provided within the tables in paragraphs (c) and (d) below) applicable to CLINs 0001-0005 only:
(1) The rates below are the Hourly Burdened Composite Labor Rates for each labor category, exclusive of prime fee on both prime and subcontractor labor.
i. Hourly Burdened Composite Labor Rates shall include direct labor rates plus all applicable burdens, to include indirect rates, applicable escalation, subcontractor fee on subcontractor labor, and subcontractor pass-through costs (exclusive of prime fee on subcontractor's labor).
ii. Hourly Burdened Composite Labor Rates shall not include prime fee on prime labor, prime fee on subcontractor labor, Foreign-Area Allowances, Other Direct Costs (ODCs) such as Travel and Material, and Cost of Money costs (if proposed).
iii. The Hourly Burdened Composite Labor Rate would be the sum of both the prime and all subcontractor labor costs, as described above, for that labor category divided by the total number of labor hours for that labor category.
(2) The Hourly Burdened Composite Labor Rates in paragraphs (c) and (d) are estimates, and invoicing will be based on actual costs incurred.
(b) Task Orders (TOs) that include CPFF Labor Term CLINs will be issued under this contract using the following streamlined ordering procedures:
(1) For each proposed order that includes CPFF Labor Term CLINs, the contracting officer will provide the contractor a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the Hourly Burdened Composite Labor Rates provided in paragraphs (c) and (d) below, to calculate the total estimated cost for the proposed CLINs and/or TO.
i. The TO fixed fee is calculated using Section G Clause 5252.232-9510 PAYMENT OF
FIXED FEE (NAVAIR).
ii. Ceiling for ODCs will be priced in accordance with the Government estimate.
iii. TOs crossing multiple years will be estimated by the Government using the Hourly
Burdened Composite Labor Rates for each year in proportion to the Period of
Performance (PoP) of the TO.
(2) Within three (3) working days of receipt of the TO and IGCE, the contractor shall respond:
i. If the contractor agrees that it can perform the TO within the parameters of the IGCE, they will sign and return the DD 1155 to the contracting officer. If the requirement remains valid, a priced order will be issued to the contractor.
ii. If the contractor does not agree with the TO and/or IGCE, the contractor shall acknowledge its disagreement within three (3) working days. Additionally, a proposal shall be submitted to the contracting officer within five (5) working days of receipt of the
TO and IGCE, addressing only the specific areas of difference in labor categories and/or hours in the IGCE. Once the differences are resolved between the contracting officer and the contractor, and the requirement remains valid, a priced order will be issued to the contractor.
(c) Hourly Burdened Composite Labor Rates for Government Site
LABOR TERM (Government Site Hours)
Hourly Burdened Composite Labor Rates (Regardless of Clearance or if Key)
Contract Labor Category Year I Year II Year III Year IV Year V
Government Site Hours 04/08/2020-
04/07/2021*
04/08/2021-
04/07/2022*
04/08/2022-
04/07/2023*
04/08/2023-
04/07/2024*
04/08/2024-
04/07/2025*
General and Operations Manager, Senior, 11-1021
Senior, 11-1021 (Overtime)
Aerospace Engineer, Senior, 17-
2011 (Overtime)
Aerospace Engineer, Journeyman, 17-2011
17-2011 (Overtime)
Electrical Engineer (Systems
Engineer), Senior, 17-2071
(Overtime)
Engineer), Journeyman, 17-2071
Engineer), Junior, 17-2071
Electrical and Electronic
Engineering Technician, Senior, 17-3023
17-3023 (Overtime)
Engineering Technician, Journeyman, 17-3023
Aerospace Engineering and
Operations Technician, Journeyman, 17-3021
Electro-Mechanical Technician, Senior, 17-3024
Journeyman, 17-3024
Mechanical Engineering
Technician, Journeyman, 17-3027
Journeyman, 17-3029
Materials Engineer, Senior, 17-
2131 (Overtime)
Materials Engineer, Journeyman, 17-2131
17-2131 (Overtime)
Mechanical Engineer (Systems
Engineer), Senior, 17-2141
Engineer), Journeyman, 17-2141
Engineer), Junior, 17-2141
Engineer (Systems Engineer), Senior, 17-2199
Senior, 17-2199 (Overtime)
Journeyman, 17-2199
Journeyman, 17-2199 (Overtime)
Junior, 17-2199
Junior, 17-2199 (Overtime)
Operations Research Analyst, Senior, 15-2031
Senior, 15-2031 (Overtime)
Journeyman, 15-2031
Journeyman, 15-2031 (Overtime)
Software Developer, Senior, 15-
1252 (Overtime)
Software Developer, Journeyman, 15-1252
15-1252 (Overtime)
Information Security Analyst, Journeyman, 15-1212
Journeyman, 15-1212 (Overtime)
Technical Writer II, 27-30462, SCA 30462
SCA 30462 (Overtime)
Logistician, Senior, 13-1081
Management Analyst
(Program/Project), Senior, 13-
1111 (Overtime)
Management Analyst (Project), Journeyman, 13-1111
Journeyman, 13-1111 (Overtime)
(Configuration), Junior, 13-1111
Financial Analyst, Senior, 13-
2051 (Overtime)
*Dates to be adjusted at contract award
(d) Hourly Burdened Composite Labor Rates for Contractor Site
LABOR TERM (Contractor Site Hours)
Hourly Burdened Composite Labor Rates (Regardless of Clearance or if Key)
Contract Labor Category Year I Year II Year III Year IV Year V
Contractor Site Hours 04/08/2020-
04/07/2021*
04/08/2021-
04/07/2022*
04/08/2022-
04/07/2023*
04/08/2023-
04/07/2024*
04/08/2024-
04 /07/2025*
Senior, 11-1021
Senior, 11-1021 (Overtime)
2011 (Overtime)
17-2011
17-2011 (Overtime)
17-3023
17-3023 (Overtime)
Journeyman, 17-3023
Aerospace Engineering and
Operations Technician, Journeyman, 17-3021
Senior, 17-3024
Journeyman, 17-3024
Mechanical Engineering
Technician, Journeyman, 17-3027
Journeyman, 17-3029
2131 (Overtime)
17-2131
17-2131 (Overtime)
Senior, 17-2199
Senior, 17-2199 (Overtime)
Journeyman, 17-2199
Journeyman, 17-2199 (Overtime)
Junior, 17-2199
Junior, 17-2199 (Overtime)
Senior, 15-2031
Senior, 15-2031 (Overtime)
Journeyman, 15-2031
Journeyman, 15-2031 (Overtime)
1252 (Overtime)
15-1252
15-1252 (Overtime)
Journeyman, 15-1212
Journeyman, 15-1212 (Overtime)
SCA 30462
SCA 30462 (Overtime)
1111 (Overtime)
Journeyman, 13-1111
Journeyman, 13-1111 (Overtime)
2051 (Overtime)
*Dates to be adjusted at contract award.
II. Ordering Procedures for Cost Plus Fixed Fee (CPFF) Labor Completion
(a) Task Orders shall be ordered in accordance with Section H, 5252.216-9534, Task Order Procedures
B-2 FEE
CPFF Labor Term - Fixed fee will be calculated based on fee per hour and in accordance with 5252.232-9510
Payment of Fixed Fee (NAVAIR)(OCT 2005). The fee per hour is the total fee proposed for all periods divided by the total number of hours for all periods (521,460). The CPFF Labor Term based fee per hour is $_[To be determined at contract award]_.
CPFF Labor Completion – Fixed fee will be a percentage calculated based on the total fee proposed for all periods divided by the total proposed cost for all periods, and in accordance with 5252.232-9510 Payment of Fixed Fee
(NAVAIR)(OCT 2005). The CPFF labor completion fee percentage is _[To be determined at contract award]_.%.
B-3 MAN-HOURS
CPFF Labor Term (CLIN 0001) The Government estimate is 521,460 man-hours, inclusive of Overtime, for the entire work effort of CPFF Labor
Term tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.
CPFF Labor Completion Tasking (CLIN 0006) The Government estimate is 166,800 man-hours for the entire work effort of CPFF Labor Completion tasking. A work year is defined as 1,920 hours exclusive of holidays and leave.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Labor - Term - In Support of the SOW/PWS
CPFF
Services in accordance with Section C, Statement of Work (SOW)/Performance
Work Statement (PWS) paragraphs 3.3.1, 3.3.2, 3.3.3, 3.3.4, and 3.3.5.
FOB: Destination
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
Labor - Term - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0001
Labor - Term - O&M
CPFF
Labor - Term - Procurement
CPFF
Labor - Term - NWCF
CPFF
0006 1 Lot Labor -Completion- In support of SOW/PWS
CPFF
Services in accordance with Section C, Statement of Work (SOW)/Performance
Work Statement (PWS) paragraphs 3.3.6, 3.3.7, 3.3.8 and 3.3.9
Labor - Completion - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0006
Labor - Completion - O&M
CPFF
Labor - Completion - Procurement
CPFF
Labor - Completion -NWCF
CPFF
0011 1 Lot Foreign-Area Allowances
CPFF
Foreign-Area Allowances in accordance with Section C, Statement of Work
(SOW)/Performance Work Statement (PWS) paragraph 3.1.4.1.5 to support services in accordance with Section C, SOW/PWS paragraphs 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.5, 3.3.6, 3.3.7, 3.3.8 and 3.3.9
Foreign-Area Allowances - RDT&E
CPFF
Not Separately Priced (NSP) from CLIN 0011
Foreign-Area Allowances - O&M
CPFF
Foreign-Area Allowances - Procurement
CPFF
Foreign-Area Allowances - NWCF
CPFF
0016 1 Lot Foreign-Area Allowances
COST
Foreign-Area Allowances in accordance with Section C, Statement of Work
(SOW)/Performance Work Statement (PWS) paragraph 3.1.4.1.5 to support services in accordance with Section C, SOW/PWS paragraphs 3.3.1, 3.3.2, 3.3.3, 3.3.4, 3.3.5, 3.3.6, 3.3.7, 3.3.8 and 3.3.9
Foreign-Area Allowances - RDT&E
COST
Not Separately Priced (NSP) from CLIN 0016
Foreign-Area Allowances - O&M
COST
Foreign-Area Allowances - Procurement
COST
Foreign-Area Allowances - NWCF
COST
0021 1 Lot ODC - Travel/Material supporting SOW/PWS
COST
Other Direct Cost (ODC) in support of CLINs 0001 and 0006 in accordance with
Section C, Statement of Work (SOW)/Performance Work Statement (PWS) paragraph 3.1.5 Other Direct Costs (ODCs) and 5252.232-9509 Travel Approval and Reimbursement Procedures and, paragraph 3.1.5 Other Direct Costs (ODCs) and 5252.242-9515 (Variation), H-1 Restriction of the Direct Charging of
Material
ODC - Travel/Material - RDT&E
COST
Other Direct Cost (ODC). Not Separately Priced (NSP) from CLIN 0021
ODC - Travel/Material - O&M
COST
ODC - Travel/Material - Procurement
COST
ODC - Travel/Material - NWCF
COST
0026 1 Lot NSP Technical Data
COST
In support of Labor and ODC CLINs. Not Separately Priced (NSP) Technical
Data In Accordance With (IAW) Section C, Statement of Work
(SOW)/Performance Work Statement (PWS)
CLAUSES INCORPORATED BY FULL TEXT
5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(NAVAIR)(VARIATION)(OCT 2019)
(a) The level of effort estimated to be ordered during the term of this contract is 521,460 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor is as follows:
CLIN TOTAL Labor Hours
0001 521,460
(b) The estimated level of effort for each individual order will be established at the task order level.
(c) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22.
(d) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of:
(1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or
52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort specified in the order, at no increase in the fee of the order; or
(2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort.
(e) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations.
(f) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order.
Section C - Descriptions and Specifications
STATEMENT OF WORK
ADVANCED SENSOR SYSTEM DEVELOPMENT AND EXECUTION STATEMENT OF
WORK/PERFORMANCE WORK STATEMENT
1.0 SCOPE
The Department of Navy (DoN), Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field
(WOLF), Airborne Systems Integration (ASI) Division was established to support the rapid insertion and transition of advanced technologies, systems, sensors, and weapons to enable programs of record, as well as deliver direct insertion of capabilities to meet urgent fleet needs. ASI Division works with customers and sponsors to identify capability gaps and requirements; to develop programmatic strategies; to conduct technology development, article testing & evaluation; and to support technology insertion. This Statement of Work (SOW)/Performance Work
Statement (PWS) defines the requirement to support ASI Division.
Specifically, ASI Division leverages and coordinates the efforts of industry, academia, and Government laboratories as an organic Lead Systems Integrator (oLSI) to design, develop, and deliver prototype systems to operational users.
Using systems engineering and systems of systems management approaches, ASI Division integrates new technologies, Commercial off the Shelf (COTS) and Government off the Shelf (GOTS) capabilities, as well as other industry or Government resources, in order to meet the requirements of each customer. ASI Division has a requirement to procure services in support of the design, development, and demonstration of sensor technologies including, but not be limited to, Intelligence, Surveillance, Reconnaissance (ISR); Electro-Optical/Infrared (EO/IR);
Hyper-Spectral/Multi-Spectral Imaging (HSI/MSI); Light Detection and Ranging (LIDAR); Radio Detection and
Ranging (RADAR); Electronic Intelligence (ELINT); Signals Intelligence (SIGINT); Chemical, Biological, Radiological, Nuclear, and Explosive (CBRNE); and Sound Navigation and Ranging (SONAR) for a variety of manned and unmanned airborne and shipborne platforms and fixed and mobile ground stations.
2.0 APPLICABLE DOCUMENTS
2.1 Department of Defense (DoD) specifications.
2.1.1 DoD 5220.22-M, National Industrial Security Program Operating Manual, (NISPOM), 18 May 2016.
2.1.2 SECNAV M-5510.36, Information Security Program, 1 Jun 2006.
2.1.3 DoDM 5200.01, DoD Information Security Program: Controlled Unclassified Information (CUI) Vol. 4, 9
Sept 2018.
2.1.4 DoDM 5400.07, Freedom of Information Act (FOIA) Program, 25 Jan 2017.
2.1.5 DoDI 5230.24, Distribution Statements on Technical Documents, Change 3, 15 Oct 2018.
2.1.6 SECNAV M-5510.30, Personnel Security Program, 1 Jun 2006.
2.1.7 OPNAVINST 3440.17A, Navy Installation Emergency Management Program, 1 Aug 2014.
2.1.8 SECNAVINST M-5239.1 Department of the Navy Information Assurance (IA) Program.
2.1.9 SECNAVINST 5239.3B Department of the Navy Information Assurance Policy.
2.1.10 SECNAVINST 5510.36A DON Information Security Program Instruction.
2.1.11 OPNAVINST 5239.1C Navy Information Assurance (IA) Program.
2.2 DoD standards..
2.2.1 DoDM 4161.2-M DoD Manual for the Performance of Contract Property Administration.
2.2.2 DoDM 5200.2-R Personnel Security Program.
2.2.3 DoDM 5220.22M National Industrial Security Program: Procedures for Government Activities Relating to
Foreign Ownership, Control, or Influence (FOCI).
2.2.4 DoDM 5400.7-R, Freedom of Information Program.
2.2.5 DoDINST 6055.17 DoD Installation Emergency Management (IEM) Program.
2.2.6 DoDINST 8510.01 Risk Management Framework For DoD Information Technology (IT).
2.2.7 DoDINST 8500.01 Cybersecurity.
2.2.8 DoDINST 8500.2 Information Assurance (IA) Implementation.
2.2.9 DoDINST 8520.2 Public Key Infrastructure (PKI) & Public Key (PK) Enabling.
2.2.10 DoDD 8500.1 Information Assurance (IA).
2.2.11 DoDD 8140.01 Cyberspace Workforce Management.
2.2.12 DTM 17-001 Cybersecurity in the Defense Acquisition System.
2.2.13 DTM 08-027 Security of Unclassified DoD Information on Non-DoD Information Systems.
2.3 Other Government documents* (e.g. Naval Air Systems Command (NAVAIR) Documents):
* The Government will provide access to these documents upon request
2.3.1 NAVAIRINST 3960.4C CH-1 Project Test Plan Policy for Testing Air Vehicles, Air Vehicle Weapons, and
Air Vehicle Installed Systems.
2.3.2 NAVAIRINST 13034.1F Airworthiness and Cybersecurity Policies for Air Vehicles and Aircraft Systems.
2.3.3 NAVAIRINST 13050.7 Change Management Policy, Procedures and Responsibilities for Aircraft Assigned to Naval Air Systems Command Aircraft Controlling Custodian.
2.3.4 NAVAIRWARCENACDIVINST 3432.1C Operations Security.
2.3.5 NASPAXRIVINST 5100 NAVAIR Safety Policy.
2.3.6 NAVSUP Publication P-409 MILSTRIP/MILSTRAP Desk Guide.
2.3.7 NAVSUP Publication P-485 MILSTRIP/MILSTRAP Manual.
2.4 Reserved.
2.5 Others.
2.5.1 C.F.R. 29 Code of Federal Regulations, Title 14.
2.5.2 ISEET Test Planning Integrated Systems Evaluation, Experimentation and Test Department, Test Planning.
2.5.3 ISEET Test Reporting Integrated Systems Evaluation, Experimentation and Test Department, Test
Reporting.
2.5.4 Defense Manpower Data Center (DMDC) Trusted Associate Sponsorship System (TASS) Overview Guide
Version 5.3.2, Dec 2014.
2.5.5 Yuma Proving Grounds.
2.5.5.1 YP-YTRO-P-1000 Range Operations.
2.5.5.2 YP-YTAA-P-2001 Aircraft Weapons and Systems Testing.
2.5.5.3 YP-YTAA-P-2601 Unmanned Aircraft Systems Operations.
3.0 REQUIREMENTS
3.1 General Requirements
3.1.1 Compatibility: The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government Information Technology (IT) environment through the security classification of Secret. The current operating environment required for this contract includes:
̶ Microsoft Windows 10
̶ Microsoft Project 2016
̶ Microsoft Office Professional Plus 2016
̶ Adobe Acrobat XI (reader)
̶ Internet access
The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall maintain state-of the-art virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and Local Area Network
(LAN) communications with ASI Division. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with ASI Division during working hours whether at
Contractor work site or on travel.
3.1.2 Work Location and Facilities
3.1.2.1 Work Location: Approximately 50% of work will be performed at Government sites and 50% of work to be performed at Contractor site. Government site(s) include Naval Air Station (NAS) Patuxent River and
Webster Field (NAS Patuxent River Annex). Contractors performing on-site support will be provided access to workspaces, office furniture, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks. The Government will provide all office furniture (ie. Tables, chairs, file cabinets, etc.)
reasonably required to execute the efforts for those who will be located at the Government facility.
3.1.2.2 Meeting Support: In support of the tasking outlined in this Statement of Work (SOW)/Performance
Work Statement (PWS), the Contractor shall have the capability to host and conduct meetings at classification levels up to Secret with the capacity to support a minimum of fifteen (15) persons and have Contractor furnished unclassified telephone and unclassified Video Teleconference (VTC) capability as well as sufficient equipment to conduct meetings with presentations including compatible software as required in Paragraph 3.1.1.
This support shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .