Attachment_6_-_QASP_CSP.docx

DOCX document 76 KB Posted

Attached to
Advanced Sensor System Development and Execution (ASSDE) Federal contract opportunity
Solicitation number
N00421-19-R-0069
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

This document is a draft statement of work and performance work statement for an indefinite delivery indefinite quantity contract to provide advanced sensor system development and execution services. The Naval Air Warfare Center Aircraft Division seeks proposals to support design, development, and demonstration of sensor technologies including information, surveillance, reconnaissance, electro-optical/infrared, hyperspectral/multispectral imaging, light detection and ranging, radio detection and ranging, signals intelligence, chemical/biological/radiation/nuclear/explosive, and sound navigation and ranging technologies for manned and unmanned airborne, shipborne, and fixed and mobile ground stations. Interested businesses must submit capability statements by March 29th demonstrating experience in areas such as scientific and engineering support, integrated logistics support, program and project support, modeling, analysis, simulation, test, training and human signatures support. The five-year IDIQ contract is anticipated to have cost-plus-fixed-fee task orders for work to be performed at Naval Air Station Patuxent River, Yuma Proving Ground, and contractor facilities.

Attachment 6 - QASP CSP

View the file

Other files for this federal contract opportunity

Other files attached to Advanced Sensor System Development and Execution (ASSDE), newest first.
File Type Posted
N00421-19-R-0069 Amendment 0010.pdf PDF
P7 Subcontractor Cost Summary.xlsx XLSX spreadsheet
Amendment 0009.pdf PDF
Attachment P3 N0042119D0069.xlsx XLSX spreadsheet
N0042119R0069AMD0008.pdf PDF
Attachment P8 N0042119D0069.xlsx.pdf PDF
N00421-19-R-0069 Amendment 0007.pdf PDF
Attachment P1 - P1 Past Performance Information Form.pdf PDF
N00421-19-R-0069 Amendment 0006.pdf PDF
N00421-19-R-0069 Amendment 0005.pdf PDF
P1_Past_Performance_Information_Form.pdf PDF
Attachment 3 - OCI List.docx DOCX document
N00421-19-R-0069 Amendment 0004.pdf PDF
N00421-19-R-0069 Amendment 0003.pdf PDF
N00421-19-R-0069_Amendment_0002.pdf PDF
Attachment P1_-_P1 Past Performance Information Form.pdf PDF
N00421-19-R-0069_Amendment_0001.pdf PDF
N00421-19-R-0069_ASSDE_Solicitation.pdf PDF
Attachment_P1_-_Past_Performance_Information_Form.pdf PDF
Attachment_4_-_Authorized_Key_Personnel.docx DOCX document
Attachment_P3_-_Hourly_Burdened_Composite_Labor_Rates.xlsx XLSX spreadsheet
Attachment_P5_-_Reserved.docx DOCX document
Attachment_P7_-_Subcontractor_Cost_Summary_ASSDE.xlsx XLSX spreadsheet
Attachment_7_-_DD_254.pdf PDF
Exhibit_A_-_CDRLS.docx DOCX document
Attachment_5_-_Authorized_Subcontractors.docx DOCX document
Attachment_1_-_Data_Item_Transmittal_Form.docx DOCX document
Attachment_8_-_MFR.pdf PDF
Attachment_P2_-_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_P4_-_Reserved.docx DOCX document
Attachment_3_-_OCI_List.docx DOCX document
Attachment_10_-_COMR_CDRL_Template.xlsx XLSX spreadsheet
Attachment_P2_CPAQ.pdf PDF
Attachment_P1_Past_Performance.pdf PDF
Attachment_P3_Streamlined_Rates.xlsx XLSX spreadsheet
Attachment_P7_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_7_-_DD_254.pdf PDF
Attachment_2_-_COR_Appointment_Letter.docx DOCX document
N00421-19-R-0069.pdf PDF
Attachment_5_-_Authorized_Subcontractors.docx DOCX document
Attachment_4_-_Authorized_Key_Personnel.docx DOCX document
Exhibit_A_-_CDRLS.docx DOCX document
Attachment_1_-_Data_Item_Transmittal_Form.docx DOCX document
Attachment_6_-_QASP_CSP.docx DOCX document
Attachment_P4_Reserved.docx DOCX document
Attachment_P6_Cost_summary.xlsx XLSX spreadsheet
Attachment_P5_Reserved.docx DOCX document
Attachment_3_-_OCI_List.docx DOCX document
ASSDE_SOW.pdf PDF
ASSDE_LOE.pdf PDF
Show all 50

Advanced Sensor System Development and Execution (ASSDE) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: N00421-19-R-0069 Attachment 6, Enclosure (6) Contract Surveillance Plan and Quality Assurance Surveillance Plan for Advanced Sensor System Development and Execution

1. Purpose

This requirement consists of both non-performance-based and performance-based Task Orders (TOs); therefore, a Contract Surveillance Plan (CSP) and a Quality Assurance Surveillance Plan (QASP) are both required. The CSP/QASP is used to ensure that the Contractor performs In Accordance With (IAW) the performance standards and definitions/metrics and the Government receives the quality of services called for in the Contract.

This hybrid CSP/QASP is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs IAW the non-performance-based required Level Of Effort (LOE) and performance-based standards and definitions/metrics, and the Government receives the quality of services called for in each TO Statement of Work (SOW)/Performance Work Statement (PWS).

The Airborne Systems Integration (ASI) Division of Naval Air Warfare Center (NAWC) Webster Outlying Field (WOLF) has a requirement to procure services in support of design, development, and demonstration of sensor technologies including, but not limited to, Intelligence, Surveillance, Reconnaissance (ISR); Electro-Optical/Infrared (EO/IR) Hyper-Spectral/Multi-Spectral Imaging (HSI/MSI); Light Detection and Ranging (LIDAR); Radio Detection and Ranging (RADAR); Signals Intelligence (SIGINT); Chemical, Biological, Radiation, Nuclear, Explosive (CBRNE); and Sound Navigation and Ranging (SONAR) technologies for a variety of manned and unmanned airborne and shipborne platforms and fixed and mobile ground stations. Specifically, requirements include, but are not limited to, project management; research; analysis; design; parts and materials procurement; demonstration; test and evaluation; user/maintainer training; and associated software development. The resultant Contract is anticipated to be a Single Award (SA) Indefinite Delivery Indefinite Quantity (IDIQ) contract that will include Cost Plus Fixed Fee (CPFF) term and CPFF completion tasking. The Contract will consist of one (1) five-year ordering period.

A properly executed CSP/QASP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this hybrid CSP/QASP is provided under Contract Section E - Inspection and Acceptance that provides for inspection and acceptance of the services, products, and documentation called for in the Contract that will be executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP/QASP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and resultant TOs.

The hybrid CSP/QASP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this Contract is AIR-2.5.1.3. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.

Government Project Lead (GPL): The COR designates an individual GPL to assist in administering of specific efforts under the Contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this hybrid CSP/QASP:

KO: The KO (either the PCO or ACO) ensures performance of all necessary actions for effective Contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the U.S. in the contractual relationship. The KO assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect Contract price, terms, or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.

GPL: The GPL is responsible for assisting in administering specific efforts under the Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments, or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, design, development, and demonstration of sensor technologies services is very competitive. As such, the successful Offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed each year beginning one (1) year after award. This evaluation will be one (1) determinant in the exercising of future CLIN option periods and TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid CSP/QASP.

b. CSP/QASP: This document will be used by the COR, ACOR, and GPLs in the technical and cost administration of this Contract. In addition to the below instructions, the form to be used for documentation of Quality Assurance (QA) surveillance is the hybrid checklist provided herein.

7. Surveillance

Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the Contractor, the COR/ACOR and GPLs while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.

9. Enclosures

Enclosure (1): Quality Standards – by SOW (Non-Performance-Based)/PWS (Performance-Based) Enclosure (2): CDRL Data Quality Standards (Non-Performance-Based and Performance-Based) Enclosure (3): Incentives Enclosure (4): Surveillance Activity Checklist (Non-Performance-Based and Performance-Based) Enclosure (5): Contract Surveillance by CDRL (Non-Performance-Based and Performance-Based) Enclosure (6): Annual Surveillance Summary Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (1)

Solicitation: N00421-19-R-0069 Attachment 6

ENCLOSURE (1) QUALITY STANDARDS - BY SOW (Non-Performance-Based)

Required Service (Non-Performance Requirements)
Standard (Performance Standards)/Acceptable Quality Level (AQL)
Method of Surveillance (Quality Assurance)
Incentives
Scientific and Engineering Support IAW SOW/PWS Para 3.3.1
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Integrated Logistics Support (ILS) IAW SOW/PWS Para 3.3.2
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Program and Project Support IAW SOW/PWS Para 3.3.3
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Special Products and Prototyping Support IAW SOW/PWS Para 3.3.4
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.5
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)

ENCLOSURE (1) QUALITY STANDARDS - BY PWS (Performance-Based)

Required Service (Performance Requirements)
Standard (Performance Standards)/Acceptable Quality Level (AQL)
Method of Surveillance (Quality Assurance)
Incentives
Scientific and Engineering Support IAW SOW/PWS Para 3.3.6
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
ILS IAW SOW/PWS Para 3.3.7
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Program and Project Support IAW SOW/PWS Para 3.3.8
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)
Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.9
Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable.
100% Inspection by COR/ACOR and/or GPL.
See Enclosure (3)

Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (1)

ENCLOSURE (2) CDRL DATA QUALITY STANDARDS (Non-Performance-Based and Performance-Based)

Description
Standard
AQL
Surveillance/Method/Measure
Incentives
Presentation Material A001
Submission is IAW the Data Item Description (DID) cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test Procedures A002
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test Plan A003
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Product Drawings/Models And Associated Lists A004
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
System/Equipment Specifications A005
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan, Configuration Management Plan A006
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Safety Assessment Report (SAR) A007
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Trip/Travel Report A008
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Report, Record of Meeting/Minutes A009
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Operations Security (OPSEC) Plan A010
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan, Logistics and Material Support Plan A011
Submission is IAW the format detailed in BLK 16 of the CDRL.
A one-time deliverable at each TO close. Must be on time, with no more than one (1) revision per submission.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Scientific & Technical Reports Summary, Monthly Technical Report A012
Submission is IAW the DID cited in the CDRL.
A one-time deliverable. Must be on time, with no more than one (1) revision.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A013
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Scientific & Technical Reports Summary, Computer-Aided Design/Manufacturing (CAD/CAM) Data A014
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Test/Inspection Report, Test Report A015
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Technical Data Packages A016
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contracting Officer’s Management Report A017
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Phase-Out Transition Plan A018
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Management Plan A019
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Accident/Incident Report A020
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contractor’s Safety Manual A021
Submission is IAW the format detailed in BLK 16 of the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Technical Manual Verification Discrepancy/Disposition Record, Discrepancy Report A022
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Engineering Change Proposal (ECP) A023
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Waiver Or Deviation System Safety Report (WDSSR) A024
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Notice Of Revision (NOR) A025
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Specification Change Notice (SCN) A026
Submission is IAW the format detailed in BLK 16 of the CDRL.
A one-time deliverable at each TO close. Must be on time, with no more than one (1) revision per submission.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Computer Operational Manual (COM) A027
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Contract Summary Report A028
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)
Software Development Plan (SDP) A029
Submission is IAW the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite.
100% Inspection by COR, ACOR, and/or GPL
See Enclosure (3)

Attachment 6, Enclosure (2) Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (2)

ENCLOSURE (3) INCENTIVES

The following incentives will apply to performance under this Contract.

Assessment Period
Acceptable Performance Definition
How Measured
Incentives
Year 1:
Not more than one (1) of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the first assessment period using the CPARS format.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 2:
Not more than one (1) of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”.
End of the second assessment period using the CPARS format covering the previous twelve (12) months.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 3:
Two (2) or more of the measurement areas rated “Very Good” or above. None rated below “Satisfactory”.
End of the third assessment period using the CPARS format covering the previous twelve (12) months.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 4:
Two (2) or more of the measurement areas rated “Very Good” or above. None of the measurement areas are below “Satisfactory”.
End of the fourth assessment period evaluation using the CPARS format covering the previous twelve (12) months.
(+) Meet the acceptable performance definition as a condition for additional tasking. *

(-) Does not meet the acceptable performance definition as a condition for additional tasking.*

Year 5:
Two (2) or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below.
End of the fifth assessment period using the CPARS format covering the previous twelve (12) months.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.

Final CPAR Review

After completion of all TOs.
(+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating.

(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final CPARS rating.

* The Government reserves the right not to award Option CLINs if the Contractor does not meet the acceptable performance standards, and/or meet all regulatory requirements.

The SOW/PWS and corresponding tasks and subtasks (to include CDRL submissions) will be assessed focusing on the following:

Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or affect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.

Cost Control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling Contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For Contracts where task or Contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort will be assessed.

Business Relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by the Contract; and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for Small Businesses to participate in Contract performance consistent with efficient performance of the Contract, to include:

Alaska Native Corporations (ANCs) Indian Tribes Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes) Women Owned Small Businesses (WOSB) HUBZone Veteran Owned Small Business (VOSB) Service Disabled Veteran Owned Small Business (SDVOSB)

Evaluation will focus on the metrics of actual small business utilization compared to the Contract required targets and the Offeror’s SB Plan, included as part of their proposal response.

Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

For non-performance-based TOs, hours delivered by each TO compared to the TO required hours will be evaluated and will influence the ratings awarded above. Cost and/or labor hour variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.

Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (3)

ENCLOSURE (4) SURVEILLANCE ACTIVITY CHECKLIST (Non-Performance-Based and Performance-Based)

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas as applicable utilizing the evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION – BY SOW/PWS

Description
Surveillance Method/

Measure

Dates
Quality Assessment
Schedule Assessment
Cost Control Assessment
Business Relations Assessment
Management Assessment
Utilization of SB Assessment
Other Areas Assessment
Scientific and Engineering Support IAW SOW/PWS Para 3.3.1
100% inspection by COR, ACOR, and/or GPL
Integrated Logistics Support (ILS) IAW SOW/PWS Para 3.3.2
100% inspection by COR, ACOR, and/or GPL
Program and Project Support IAW SOW/PWS Para 3.3.3
100% inspection by COR, ACOR, and/or GPL
Special Products and Prototyping Support IAW SOW/PWS Para 3.3.4
100% inspection by COR, ACOR, and/or GPL
Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.5
100% inspection by COR, ACOR, and/or GPL
Scientific and Engineering Support IAW SOW/PWS Para 3.3.6
100% inspection by COR, ACOR, and/or GPL
ILS IAW SOW/PWS Para 3.3.7
100% inspection by COR, ACOR, and/or GPL
Program and Project Support IAW SOW/PWS Para 3.3.8
100% inspection by COR, ACOR, and/or GPL
Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.9
100% inspection by COR, ACOR, and/or GPL

Attachment 6, Enclosure (4)

ENCLOSURE (5) CONTRACT SURVEILLANCE BY CDRL

Description
Surveillance Method/Measure
Dates Due
Dates Completed
No. Submittals
No. of Req’d Rework
Percentage On Time
Comments
Presentation Material A001
100% inspection by COR, ACOR, and/or GPL
Test Procedures A002
100% inspection by COR, ACOR, and/or GPL
Test Plan A003
100% inspection by COR, ACOR, and/or GPL
Product Drawings/Models And Associated Lists A004
100% inspection by COR, ACOR, and/or GPL
System/Equipment Specifications A005
100% inspection by COR, ACOR, and/or GPL
Management Plan, Configuration Management Plan A006
100% inspection by COR, ACOR, and/or GPL
Safety Assessment Report (SAR) A007
100% inspection by COR, ACOR, and/or GPL
Trip/Travel Report A008
100% inspection by COR, ACOR, and/or GPL
Report, Record of Meeting/Minutes A009
100% inspection by COR, ACOR, and/or GPL
Operations Security (OPSEC) Plan A010
100% inspection by COR, ACOR, and/or GPL
Management Plan, Logistics and Material Support Plan A011
100% inspection by COR, ACOR, and/or GPL
Scientific & Technical Reports Summary, Monthly Technical Report A012
100% inspection by COR, ACOR, and/or GPL
Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A013
100% inspection by COR, ACOR, and/or GPL
Scientific & Technical Reports Summary, Computer-Aided Design/Manufacturing (CAD/CAM Data) A014
100% inspection by COR, ACOR, and/or GPL
Test/Inspection Report, Test Report A015
100% inspection by COR, ACOR, and/or GPL
Technical Data Packages A016
100% inspection by COR, ACOR, and/or GPL
Contracting Officer’s Management Report A017
100% inspection by COR, ACOR, and/or GPL
Phase-Out Transition Plan A018
100% inspection by COR, ACOR, and/or GPL
Management Plan A019
100% inspection by COR, ACOR, and/or GPL
Accident/Incident Report A020
100% inspection by COR, ACOR, and/or GPL
Contractor’s Safety Manual A021
100% inspection by COR, ACOR, and/or GPL
Technical Manual Verification Discrepancy/Disposition Record, Discrepancy Report A022
100% inspection by COR, ACOR, and/or GPL
Engineering Change Proposal (ECP) A023
100% inspection by COR, ACOR, and/or GPL
Waiver Or Deviation System Safety Report (WDSSR) A024
100% inspection by COR, ACOR, and/or GPL
Notice Of Revision (NOR) A025
100% inspection by COR, ACOR, and/or GPL
Specification Change Notice (SCN) A026
100% inspection by COR, ACOR, and/or GPL
Computer Operational Manual (COM) A027
100% inspection by COR, ACOR, and/or GPL
Contract Summary Report A028
100% inspection by COR, ACOR, and/or GPL
Software Development Plan (SDP) A029
100% inspection by COR, ACOR, and/or GPL
Metric Summary:
Current Period
Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Attachment 6, Enclosure (5)

ENCLOSURE (6) ANNUAL SURVEILLANCE SUMMARY

The COR will perform an assessment of overall Contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.

Description
Surveillance Method/

Measure

Date Planned
Date Completed
Summary Rating/Results
Quality of Product or Service
Review of Quarterly Ratings
Schedule
Review of Quarterly Ratings
Cost Control
Review of Quarterly Ratings
Business Relations
Review of Quarterly Ratings
Management
Review of Quarterly Ratings
Utilization of SB
Review of Quarterly Ratings
Other Areas
Review of Quarterly Ratings

Annual Surveillance Completed By: _______________________

Date Completed: ________________

File details come from the government source that posted it. Updated .