Solicitation: N00421-19-R-0069 Attachment 6, Enclosure (6) Contract Surveillance Plan and Quality Assurance Surveillance Plan for Advanced Sensor System Development and Execution
1. Purpose
This requirement consists of both non-performance-based and performance-based Task Orders (TOs); therefore, a Contract Surveillance Plan (CSP) and a Quality Assurance Surveillance Plan (QASP) are both required. The CSP/QASP is used to ensure that the Contractor performs In Accordance With (IAW) the performance standards and definitions/metrics and the Government receives the quality of services called for in the Contract.
This hybrid CSP/QASP is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the Contractor performs IAW the non-performance-based required Level Of Effort (LOE) and performance-based standards and definitions/metrics, and the Government receives the quality of services called for in each TO Statement of Work (SOW)/Performance Work Statement (PWS).
The Airborne Systems Integration (ASI) Division of Naval Air Warfare Center (NAWC) Webster Outlying Field (WOLF) has a requirement to procure services in support of design, development, and demonstration of sensor technologies including, but not limited to, Intelligence, Surveillance, Reconnaissance (ISR); Electro-Optical/Infrared (EO/IR) Hyper-Spectral/Multi-Spectral Imaging (HSI/MSI); Light Detection and Ranging (LIDAR); Radio Detection and Ranging (RADAR); Signals Intelligence (SIGINT); Chemical, Biological, Radiation, Nuclear, Explosive (CBRNE); and Sound Navigation and Ranging (SONAR) technologies for a variety of manned and unmanned airborne and shipborne platforms and fixed and mobile ground stations. Specifically, requirements include, but are not limited to, project management; research; analysis; design; parts and materials procurement; demonstration; test and evaluation; user/maintainer training; and associated software development. The resultant Contract is anticipated to be a Single Award (SA) Indefinite Delivery Indefinite Quantity (IDIQ) contract that will include Cost Plus Fixed Fee (CPFF) term and CPFF completion tasking. The Contract will consist of one (1) five-year ordering period.
A properly executed CSP/QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this hybrid CSP/QASP is provided under Contract Section E - Inspection and Acceptance that provides for inspection and acceptance of the services, products, and documentation called for in the Contract that will be executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP/QASP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and resultant TOs.
The hybrid CSP/QASP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting Officer (PCO)), or a person with the authority to administer contracts (Administrative Contracting Officer (ACO)), and make related determinations and findings on behalf of the Government. The PCO for this Contract is AIR-2.5.1.3. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates an individual GPL to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this hybrid CSP/QASP:
KO: The KO (either the PCO or ACO) ensures performance of all necessary actions for effective Contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the U.S. in the contractual relationship. The KO assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect Contract price, terms, or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect the Contract price, terms, or conditions shall be referred to the KO for action.
GPL: The GPL is responsible for assisting in administering specific efforts under the Contract. A GPL cannot, in any manner, alter the scope of the Contract, make commitments, or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for advanced research and development, design, development, and demonstration of sensor technologies services is very competitive. As such, the successful Offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed each year beginning one (1) year after award. This evaluation will be one (1) determinant in the exercising of future CLIN option periods and TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this hybrid CSP/QASP.
b. CSP/QASP: This document will be used by the COR, ACOR, and GPLs in the technical and cost administration of this Contract. In addition to the below instructions, the form to be used for documentation of Quality Assurance (QA) surveillance is the hybrid checklist provided herein.
7. Surveillance
Enclosures (1) through (3) set forth the performance standards, incentives, and surveillance methods for the Contractor, the COR/ACOR and GPLs while enclosures (4) through (6) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR shall forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1): Quality Standards – by SOW (Non-Performance-Based)/PWS (Performance-Based) Enclosure (2): CDRL Data Quality Standards (Non-Performance-Based and Performance-Based) Enclosure (3): Incentives Enclosure (4): Surveillance Activity Checklist (Non-Performance-Based and Performance-Based) Enclosure (5): Contract Surveillance by CDRL (Non-Performance-Based and Performance-Based) Enclosure (6): Annual Surveillance Summary Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (1)
Solicitation: N00421-19-R-0069 Attachment 6
ENCLOSURE (1) QUALITY STANDARDS - BY SOW (Non-Performance-Based)
| Required Service (Non-Performance Requirements) |
| Standard (Performance Standards)/Acceptable Quality Level (AQL) |
| Method of Surveillance (Quality Assurance) |
| Incentives |
| Scientific and Engineering Support IAW SOW/PWS Para 3.3.1 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Integrated Logistics Support (ILS) IAW SOW/PWS Para 3.3.2 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Program and Project Support IAW SOW/PWS Para 3.3.3 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Special Products and Prototyping Support IAW SOW/PWS Para 3.3.4 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.5 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
ENCLOSURE (1) QUALITY STANDARDS - BY PWS (Performance-Based)
| Required Service (Performance Requirements) |
| Standard (Performance Standards)/Acceptable Quality Level (AQL) |
| Method of Surveillance (Quality Assurance) |
| Incentives |
| Scientific and Engineering Support IAW SOW/PWS Para 3.3.6 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| ILS IAW SOW/PWS Para 3.3.7 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Program and Project Support IAW SOW/PWS Para 3.3.8 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
| Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.9 |
| Based upon feedback from the GPLs, 95% of the services and products provided must be deemed comprehensive, timely, and technically acceptable. |
| 100% Inspection by COR/ACOR and/or GPL. |
| See Enclosure (3) |
Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (1)
ENCLOSURE (2) CDRL DATA QUALITY STANDARDS (Non-Performance-Based and Performance-Based)
| Description |
| Standard |
| AQL |
| Surveillance/Method/Measure |
| Incentives |
| Presentation Material A001 |
| Submission is IAW the Data Item Description (DID) cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Test Procedures A002 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Test Plan A003 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Product Drawings/Models And Associated Lists A004 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| System/Equipment Specifications A005 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Management Plan, Configuration Management Plan A006 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Safety Assessment Report (SAR) A007 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Trip/Travel Report A008 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Report, Record of Meeting/Minutes A009 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Operations Security (OPSEC) Plan A010 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Management Plan, Logistics and Material Support Plan A011 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| A one-time deliverable at each TO close. Must be on time, with no more than one (1) revision per submission. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Scientific & Technical Reports Summary, Monthly Technical Report A012 |
| Submission is IAW the DID cited in the CDRL. |
| A one-time deliverable. Must be on time, with no more than one (1) revision. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A013 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Scientific & Technical Reports Summary, Computer-Aided Design/Manufacturing (CAD/CAM) Data A014 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Test/Inspection Report, Test Report A015 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Technical Data Packages A016 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Contracting Officer’s Management Report A017 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Phase-Out Transition Plan A018 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Management Plan A019 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Accident/Incident Report A020 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Contractor’s Safety Manual A021 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Technical Manual Verification Discrepancy/Disposition Record, Discrepancy Report A022 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Engineering Change Proposal (ECP) A023 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Waiver Or Deviation System Safety Report (WDSSR) A024 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Notice Of Revision (NOR) A025 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Specification Change Notice (SCN) A026 |
| Submission is IAW the format detailed in BLK 16 of the CDRL. |
| A one-time deliverable at each TO close. Must be on time, with no more than one (1) revision per submission. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Computer Operational Manual (COM) A027 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Contract Summary Report A028 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
| Software Development Plan (SDP) A029 |
| Submission is IAW the DID cited in the CDRL. |
| 95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require a rewrite. |
| 100% Inspection by COR, ACOR, and/or GPL |
| See Enclosure (3) |
Attachment 6, Enclosure (2) Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (2)
ENCLOSURE (3) INCENTIVES
The following incentives will apply to performance under this Contract.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
| Incentives |
| Year 1: |
| Not more than one (1) of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of the first assessment period using the CPARS format. |
| (+) Meet the acceptable performance definition as a condition for additional tasking. * |
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
| Year 2: |
| Not more than one (1) of the measurement areas rated below “Satisfactory”. None of the measurement areas are rated below “Marginal”. |
| End of the second assessment period using the CPARS format covering the previous twelve (12) months. |
| (+) Meet the acceptable performance definition as a condition for additional tasking. * |
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
| Year 3: |
| Two (2) or more of the measurement areas rated “Very Good” or above. None rated below “Satisfactory”. |
| End of the third assessment period using the CPARS format covering the previous twelve (12) months. |
| (+) Meet the acceptable performance definition as a condition for additional tasking. * |
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
| Year 4: |
| Two (2) or more of the measurement areas rated “Very Good” or above. None of the measurement areas are below “Satisfactory”. |
| End of the fourth assessment period evaluation using the CPARS format covering the previous twelve (12) months. |
| (+) Meet the acceptable performance definition as a condition for additional tasking. * |
(-) Does not meet the acceptable performance definition as a condition for additional tasking.*
| Year 5: |
| Two (2) or more of the measurement areas rated “Very Good” or “Exceptional”. None of the measurement areas are rated “Marginal” or below. |
| End of the fifth assessment period using the CPARS format covering the previous twelve (12) months. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition which will result in a marginal or unsatisfactory final CPARS rating.
Final CPAR Review
| After completion of all TOs. |
| (+) Meet the acceptable performance definition as a condition for satisfactory or better Final CPARS rating. |
(-) Does not meet the acceptable performance definition` which will result in a marginal or unsatisfactory Final CPARS rating.
* The Government reserves the right not to award Option CLINs if the Contractor does not meet the acceptable performance standards, and/or meet all regulatory requirements.
The SOW/PWS and corresponding tasks and subtasks (to include CDRL submissions) will be assessed focusing on the following:
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or affect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of Contractor corrective actions.
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing, and controlling Contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For Contracts where task or Contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort will be assessed.
Business Relations: Assess the timeliness, completeness, and quality of problem identification, corrective action plans, proposal submittals, the Contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by the Contract; and communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of Small Business: The RFP and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for Small Businesses to participate in Contract performance consistent with efficient performance of the Contract, to include:
Alaska Native Corporations (ANCs) Indian Tribes Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes) Women Owned Small Businesses (WOSB) HUBZone Veteran Owned Small Business (VOSB) Service Disabled Veteran Owned Small Business (SDVOSB)
Evaluation will focus on the metrics of actual small business utilization compared to the Contract required targets and the Offeror’s SB Plan, included as part of their proposal response.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
For non-performance-based TOs, hours delivered by each TO compared to the TO required hours will be evaluated and will influence the ratings awarded above. Cost and/or labor hour variances greater than 10% cannot earn an Exceptional or Very Good for Cost Control evaluation criteria.
Solicitation:N00421-19-R-0069 Attachment 6, Enclosure (3)
ENCLOSURE (4) SURVEILLANCE ACTIVITY CHECKLIST (Non-Performance-Based and Performance-Based)
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of Small Business, and Other Areas as applicable utilizing the evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW/PWS
| Description |
| Surveillance Method/ |
Measure
| Dates |
| Quality Assessment |
| Schedule Assessment |
| Cost Control Assessment |
| Business Relations Assessment |
| Management Assessment |
| Utilization of SB Assessment |
| Other Areas Assessment |
| Scientific and Engineering Support IAW SOW/PWS Para 3.3.1 |
| 100% inspection by COR, ACOR, and/or GPL |
| Integrated Logistics Support (ILS) IAW SOW/PWS Para 3.3.2 |
| 100% inspection by COR, ACOR, and/or GPL |
| Program and Project Support IAW SOW/PWS Para 3.3.3 |
| 100% inspection by COR, ACOR, and/or GPL |
| Special Products and Prototyping Support IAW SOW/PWS Para 3.3.4 |
| 100% inspection by COR, ACOR, and/or GPL |
| Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.5 |
| 100% inspection by COR, ACOR, and/or GPL |
| Scientific and Engineering Support IAW SOW/PWS Para 3.3.6 |
| 100% inspection by COR, ACOR, and/or GPL |
| ILS IAW SOW/PWS Para 3.3.7 |
| 100% inspection by COR, ACOR, and/or GPL |
| Program and Project Support IAW SOW/PWS Para 3.3.8 |
| 100% inspection by COR, ACOR, and/or GPL |
| Modeling, Analysis, Simulation, Test, Training, and Human Signatures Support IAW SOW/PWS Para 3.3.9 |
| 100% inspection by COR, ACOR, and/or GPL |
Attachment 6, Enclosure (4)
ENCLOSURE (5) CONTRACT SURVEILLANCE BY CDRL
| Description |
| Surveillance Method/Measure |
| Dates Due |
| Dates Completed |
| No. Submittals |
| No. of Req’d Rework |
| Percentage On Time |
| Comments |
| Presentation Material A001 |
| 100% inspection by COR, ACOR, and/or GPL |
| Test Procedures A002 |
| 100% inspection by COR, ACOR, and/or GPL |
| Test Plan A003 |
| 100% inspection by COR, ACOR, and/or GPL |
| Product Drawings/Models And Associated Lists A004 |
| 100% inspection by COR, ACOR, and/or GPL |
| System/Equipment Specifications A005 |
| 100% inspection by COR, ACOR, and/or GPL |
| Management Plan, Configuration Management Plan A006 |
| 100% inspection by COR, ACOR, and/or GPL |
| Safety Assessment Report (SAR) A007 |
| 100% inspection by COR, ACOR, and/or GPL |
| Trip/Travel Report A008 |
| 100% inspection by COR, ACOR, and/or GPL |
| Report, Record of Meeting/Minutes A009 |
| 100% inspection by COR, ACOR, and/or GPL |
| Operations Security (OPSEC) Plan A010 |
| 100% inspection by COR, ACOR, and/or GPL |
| Management Plan, Logistics and Material Support Plan A011 |
| 100% inspection by COR, ACOR, and/or GPL |
| Scientific & Technical Reports Summary, Monthly Technical Report A012 |
| 100% inspection by COR, ACOR, and/or GPL |
| Scientific & Technical Reports Summary, Ad-Hoc Technical Reports/Memos A013 |
| 100% inspection by COR, ACOR, and/or GPL |
| Scientific & Technical Reports Summary, Computer-Aided Design/Manufacturing (CAD/CAM Data) A014 |
| 100% inspection by COR, ACOR, and/or GPL |
| Test/Inspection Report, Test Report A015 |
| 100% inspection by COR, ACOR, and/or GPL |
| Technical Data Packages A016 |
| 100% inspection by COR, ACOR, and/or GPL |
| Contracting Officer’s Management Report A017 |
| 100% inspection by COR, ACOR, and/or GPL |
| Phase-Out Transition Plan A018 |
| 100% inspection by COR, ACOR, and/or GPL |
| Management Plan A019 |
| 100% inspection by COR, ACOR, and/or GPL |
| Accident/Incident Report A020 |
| 100% inspection by COR, ACOR, and/or GPL |
| Contractor’s Safety Manual A021 |
| 100% inspection by COR, ACOR, and/or GPL |
| Technical Manual Verification Discrepancy/Disposition Record, Discrepancy Report A022 |
| 100% inspection by COR, ACOR, and/or GPL |
| Engineering Change Proposal (ECP) A023 |
| 100% inspection by COR, ACOR, and/or GPL |
| Waiver Or Deviation System Safety Report (WDSSR) A024 |
| 100% inspection by COR, ACOR, and/or GPL |
| Notice Of Revision (NOR) A025 |
| 100% inspection by COR, ACOR, and/or GPL |
| Specification Change Notice (SCN) A026 |
| 100% inspection by COR, ACOR, and/or GPL |
| Computer Operational Manual (COM) A027 |
| 100% inspection by COR, ACOR, and/or GPL |
| Contract Summary Report A028 |
| 100% inspection by COR, ACOR, and/or GPL |
| Software Development Plan (SDP) A029 |
| 100% inspection by COR, ACOR, and/or GPL |
| Metric Summary: |
| Current Period |
| Cumulative |
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Attachment 6, Enclosure (5)
ENCLOSURE (6) ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall Contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality of Product or Service |
| Review of Quarterly Ratings |
| Schedule |
| Review of Quarterly Ratings |
| Cost Control |
| Review of Quarterly Ratings |
| Business Relations |
| Review of Quarterly Ratings |
| Management |
| Review of Quarterly Ratings |
| Utilization of SB |
| Review of Quarterly Ratings |
| Other Areas |
| Review of Quarterly Ratings |
Annual Surveillance Completed By: _______________________
Date Completed: ________________