P5_Com._Burdened_Rate,_ex._Fee_Rev1.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- N0042118R0042
About this file
This document contains a draft performance-based statement of work for contractor logistics support, research, development, test and evaluation, engineering services, and aircraft maintenance services in support of the Presidential Helicopters Program Office. The Navy is seeking industry review and comments on the draft PBSOW by July 8, 2019 to support maintenance and support services on designated aircraft for PMA-274. Comments should be submitted to the named contract specialist at the Navy. This is a request for information only and does not constitute a solicitation or commitment to award a contract. No funds are available for responding to the announcement. Any information submitted by respondents is strictly voluntary.
Attachment P-5 Composite Burdened Rate, exclusive of Fee Rev. 1
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| COLUMN | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| A | Proposed Labor Category (Furnished by Government) | (TAB 1), Enter the Proposed Labor Category (if it has not already been entered), as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| B | Site | (TAB 1), For each proposed Labor Category, enter the Site in which the individual will be working (e.g. Patuxent River, MD) |
| C | Individual Designator | (TAB 1), For each individual Contractor employee proposed; enter a different Identifing title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template. Enter one FTE# for EACH indiviual proposed. (The number of FTE's must coordinate with the submitted P-3 for evaluation purposes.) |
| D-H | Proposed Burdened Labor Rate per Hour, exclusive of fee | (TAB 1), Enter the Burdened Labor Rate per Hour, exclusive of fee, proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. The Burdened Labor Rates shall include fringe, overhead, G&A, subcontractor pass-through rate, exclusive of fee, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. |
TAB1-Fully Burdened Labor Rates
| ATTACHMENT P-5 | Site | Individual | Burdened Labor Rate, exclusive of Fee | ||||
| Proposed Labor Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| A/C Paint and Refurbishment | Patuxent River | ||||||
| A/C Paint and Refurbishment – Lead | Patuxent River | ||||||
| A/C Paint and Refurbishment – Supervisory | Patuxent River | ||||||
| A/C Quality Control Inspector | Patuxent River | ||||||
| A/C/Aircrew Scheduler/Coordinator | Patuxent River | ||||||
| Aircraft Mechanic III | Patuxent River | ||||||
| Aircraft Mechanic III - Supervisor/Lead | Patuxent River | ||||||
| Aircraft Service Attendant | Patuxent River | ||||||
| Aviation Life Support Systems Specialist | Patuxent River | ||||||
| Avionics Technician | Patuxent River | ||||||
| Central Technical Publication Librarian | Patuxent River | ||||||
| Engineering Technician III | Patuxent River | ||||||
| Engineering Technician IV | Patuxent River | ||||||
| Facility Maintenance Specialist | Patuxent River | ||||||
| Federal Aviation Administration Designation Representative/Designated Airworthiness Representative | Patuxent River | ||||||
| Group Manager * | Patuxent River | ||||||
| Hazardous Material Coordinator | Patuxent River | ||||||
| Integrated Maintenance Concept/Senior Plan Coordinator (IMC/P)* | Patuxent River | ||||||
| Machine Tool Operator | Patuxent River | ||||||
| Maintenance Manager | Patuxent River | ||||||
| Maintenance/Material Support | Patuxent River | ||||||
| Material Control Manager* | Patuxent River | ||||||
| NALCOMIS Database Administrator/Logs and Records * | Patuxent River | ||||||
| Computer Aided Design Specialist | Patuxent River | ||||||
| Network Systems Administrator | Patuxent River | ||||||
| Office Manager/Maintenance Administration | Patuxent River | ||||||
| Program Manager * | Patuxent River | ||||||
| Quality Manager* | Patuxent River | ||||||
| Support Equipment - Mechanic | Patuxent River | ||||||
| Support Equipment - Mechanic Lead | Patuxent River | ||||||
| Support Equipment Quality Control Specialist | Patuxent River | ||||||
| Tool Room/IMBRL Manager* | Patuxent River | ||||||
| Tool/Parts Attendant | Patuxent River | ||||||
| Turboshaft Engine Mechanic | Patuxent River | ||||||
| Upholsterer/Upholstery Restoration | Patuxent River | ||||||
| Warehouse Manager | Patuxent River | ||||||
| Warehouse Specialist | Patuxent River | ||||||
| Aircraft Mechanic III | Quantico, VA | ||||||
| Aircraft Mechanic III - Supervisor/Lead | Quantico, VA |
Sheet3
File details come from the government source that posted it. Updated .