Industry_Q&As_8.8.2019.pdf

PDF 68 KB Posted

Attached to
PMA-274 Presidential Helicopter Maintenance and Support Services
Solicitation number
N0042118R0042
Issued by

About this file

This document contains questions and answers regarding a draft performance-based statement of work for contractor logistics support, research, development, test and evaluation, engineering services, and aircraft maintenance services in support of the Presidential Helicopter Program Office. Key details include: the government requires Tier 5 Secret YANKEE White security clearances for all key and non-key personnel by the first day of contract performance; a foreign-owned company may bid as a prime contractor or joint venture partner if from a qualifying country and eligible to do business with the U.S. government; degree requirements for key labor categories will not change; the quality assurance surveillance plan will be revised to include performance standards for an additional location and clarify terminology for metrics; and monthly performance will be documented on the quality assurance officer's monthly report form.

Government's Responses to Industry Questions

View the file

Other files

File Type Posted
N0042118R0042-0004.pdf PDF
N0042118R0042-0003.pdf PDF
Attachment_1_-_PBSOW_8.16.2019_Rev2.pdf PDF
N0042118R0042-0002.pdf PDF
P3_Rev1.xls XLS spreadsheet
P4_Fully_Burdened_Labor_Rates_Rev1.xlsx XLSX spreadsheet
Exhibit_A_CDRL_A001-A007_Rev1_8.14.2019.pdf PDF
N0042118R0042_Amend_0001.pdf PDF
Attachment_1_-_PBSOW_Revision_1_8.14.2019.pdf PDF
Industry_Q&As_8.14.2019.pdf PDF
Attachment_2_-_QASP_Revision_1_8.14.2019.pdf PDF
P5_Com._Burdened_Rate,_ex._Fee_Rev1.xlsx XLSX spreadsheet
N0042118R0042.pdf PDF
P3_Prime_and_Sub_Cost_Summary.xls XLS spreadsheet
Attachment_4_-_WD_2015-4279_Rev9_(St._Mary's_MD).pdf PDF
Attachment_3_-_OCI_List.pdf PDF
Attachment_1_-_PBSOW.pdf PDF
P2_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_5_-_WD_2015-4281_Rev14_(Quantico,_VA).pdf PDF
P1_Past_Performance_Information_Form.pdf PDF
P5_Composite_Burdened_Rates,_exclusive_of_Fee.xlsx XLSX spreadsheet
Attachment_6-_DD254_For_Bidding_Purposes_Only.pdf PDF
P4_Fully_Burdened_Labor_Rates.xlsx XLSX spreadsheet
Attachment_2_-_QASP.pdf PDF
Exhibit_A_CDRLs_A001-A007.pdf PDF
N0042118R0042_Draft_PBSOW_Industry_Q&As_7.31.2019.pdf PDF
N0042118R0042_Draft_PBSOW_Industry_Q&As_7.18.2019.pdf PDF
Level_of_Effort_(LOE).docx DOCX document
Attachment_1_-_PBSOW_DRAFT_6.26.2019.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Document Para Question Answer

1 RFP

Section L, Part B, para 1.3.3

The Government requires both Key and Non‐Key personnel to possess a TS‐YW clearance on Day 1. This requirement appears to present an unfair competitive advantage to the incumbent, as non‐incumbents would not have staff with a current YW unless their current staff are working a program requiring the YW access designation. Would the Government consider changing the requirement to hold a YW from "Day 1" to "within 3 weeks of contract award"? In our experience we have found that personnel who have a current TS are able to be granted YW access within that reasonable timeframe if not sooner.

No. The clearance requirements are as written. Due to program requirements, having cleared TS‐YW personnel on Day 1 of performance start date is a hard requirement and will not be revised. Without the appropriate clearances outlined in the RFP, contractor employees are not able to access the equipment or enter into the required spaces on the installation, essentially restricting the awardee from performing any of the performance tasks. However, there will be a 30 day transition period prior to the performance start date.

2 RFP

General Question

Will the Government please confirm that a foreign owned company is eligible to bid this solicitation as a Prime or member of a Joint Venture?

A foreign owned company may bid on this solicition as a Prime or member of a Joint Venture if the foreign country is a qualifying country and the company is eligible and registered to do business with the U.S.

Government.

3 PBSOW

para 3.5.1.2, 3.5.1.3, 3.5.1.4, 3.5.1.6

Due to the specific maintenance experience required for the key labor categories of Group Manager, Maintenance Manager, Integrated Maintenance Concept/Plan (IMC/P) Coordinator/Logistics Analyst, NALCOMIS Database Administrator (DBA/A)/Logs and Records, would the Government consider allowing an aviation or engineering degree in lieu of a business or management degree for these positions?

No. The degree requirements are as written and the PBSOW will not be revised.

4 QASP Enclosure (1) Attachment 2 of the Solicitation titled QASP, has an Enclosure (1), Maintenance Performance Standards, para 1.1 is titled "Presidential Helicopter Support Facility (PHSF)".

Are there supposed to be other tables for other locations?

QASP, Enclosure (1), para 1.1 will be revised to include HMX‐1 EFD, Quantico, Virginia.

5 QASP Enclosure (1)

Under "SOW Task Description", "Maintain/Correct aircraft material condition..." has an associated "Surveillance Level" entry that reads "GIO verifies RA reports, averages RA percentages and enters on monthly RA report. However, Enclosure 2, para 2.2.1 does not list an "RA" metric. A search of the PBSOW and Solicitation did not identify any abbreviation for "RA". Is it intended to be "RFT"?

Yes. The Surveillance Method should read "GIO verifies daily RFT reports, averages RFT percentages and enters on monthly RFT report." The QASP will be revised accordingly.

6 QASP Enclosure (4)

Attachment 2 of Solicitation titled QASP, has an Enclosure 4; the last block of the page 1 of that form has an untitled block with the following statement "As per enclosure one of the QASP, the contractor was graded on the following metrics:" and then lists 6 elements to be "graded". A review of Enclosure 1 lists only 4 elements to be graded; only 3 match the description listed in enclosure 4 of the QASP. Which enclosure lists the correct metrics, Enclosure (1) or Enclosure (4)?

Enclosure (1) lists the performance standards. The untitled block on Enclosure (4) is sample language; this block will be utilized for any written details that may be needed during the assessment. However, the sample language in Enclosure (4) will be revised to align with Enclosure (1) performance standards.

7 QASP para 12.

Attachment 2 of the Solicitation titled QASP, para 12, last sentence reads "The contractor's performance will be documented on the Monthly COR/GIO Monthly Report". Is the report mentioned supposed to be enclosure (4), titled "MAINTENANCE OFFICER/QUALITY ASSURANCE OFFICER'S MONTHLY REPORT"? If this is a different report, will a blank version be added to the QASP?

Yes. The report mentioned in Paragraph 12 of the QASP is Enclosure (4), titled "MAINTENANCE OFFICER/QUALITY

ASSURANCE OFFICER'S MONTHLY REPORT".

N0042118R0042 Presidential Helicopter

File details come from the government source that posted it. Updated .