N00421-18-R-0024_Section_M.docx

DOCX document 31 KB Posted

Attached to
AIR-4. 11_ATCLS_AOOSS Federal contract opportunity
Solicitation number
N00421-18-R-0024
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Section M

View the file

Other files for this federal contract opportunity

Other files attached to AIR-4. 11_ATCLS_AOOSS, newest first.
File Type Posted
N00421-18-R-0024-P00003.docx DOCX document
Amendment_3.docx DOCX document
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
N00421-18-R-0024-P00002.docx DOCX document
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
N00421-18-R-0024-P00001.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.doc DOC document
Att_8_Locator_Form.doc DOC document
Att_P3_PPIF.pdf PDF
Att_P4_CPAQ.pdf PDF
Att_3_OCI_List.doc DOC document
N00421-18-R-0024.docx DOCX document
Exhibit_A.pdf PDF
Att_5_WD_15-4279_.txt TXT text file
Att_2_QASP.doc DOC document
Att_7_GFP.xlsx XLSX spreadsheet
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
Att_1_DD254.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_6_WD_15-5635.txt TXT text file
N00421-18-R-0024_Section_L.docx DOCX document
N00421-18-R-0024_PWS.docx DOCX document
N00421-18-R-0024_Level_of_Effort.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0042118R0024

M-1 EVALUATION FACTORS FOR AWARD (SERVICES) (Jul 2017)

PART A: GENERAL INFORMATION

1.0 GENERAL

The Government expects to select one Offeror whose proposal offers the “best value” to the Government, using the trade-off method. "Best value" means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit(s) in response to the requirement. The Offeror is advised that the lowest priced proposal meeting the solicitation requirements may not be selected for an award if award to a higher priced Offeror is determined to be more beneficial to the Government. However, the perceived benefits of the higher priced proposal must merit the additional price.

2.0 EVALUATION PROCESS

2.1 In accordance with FAR 52.215-1, the Government intends to evaluate and award a contract without discussions with offerors (except minor clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price or cost and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. All proposals will be evaluated for compliance with the terms, conditions, and requirements set forth in the solicitation. Failure to address each of the areas identified in Section L Part B Specific Information in the proposal may impact the resulting evaluation ratings and risk assessment.

2.2 For all the Technical factor(s) and subfactors, a combined Technical/Risk rating will be assigned. This method reflects whether the proposal meets or does not meet the minimum requirements along with an assessment of the strengths, weaknesses, significant weaknesses, and deficiencies of the proposal to determine the combined Technical/Risk rating. The benefit to the Government associated with assessed strengths along with technical risk will be considered in determining whether the offeror’s proposal rises to a level of being thorough or exceptional. Assessment of technical risk considers potential for disruption of schedule, increase in costs, degradation of performance, the need to increase Government oversight, or the likelihood of unsuccessful contract performance. Offerors are advised that during the evaluation process, a technical subfactor with an “Unacceptable” Technical/Risk Rating will result in the entire proposal being found unacceptable and eliminated from the competition.

2.3 Under Past Performance, the Government will evaluate recent, relevant performance to determine how well an offeror has performed work similar to the work required by the solicitation. When proposals are received from joint ventures, specifically formed by the Offeror to propose on a particular acquisition, the past performance evaluation will consider each individual JV team member’s relevant past performance. After evaluating the Offeror’s past performance information, a Performance Confidence Assessment Rating will be assigned. More relevant past performance will typically be a stronger predictor of future success and have more influence on the Performance Confidence Assessment Rating than past performance of lesser relevance. In the case of an Offeror without a record of relevant past performance, the Offeror will receive a Performance Confidence Assessment Rating of “Unknown Confidence (Neutral)”.

3.0 EVALUATION FACTORS FOR AWARD

Proposals shall be evaluated using the factors and subfactors listed below.

a) TECHNICAL

1. Understanding of the Work

2. Workforce

3. Management Approach

b) PAST PERFORMANCE

c) PRICE/COST

Factors are listed in descending order of importance. The technical subfactors are also listed in descending order of importance.

Technical and Past Performance factors, when combined, are significantly more important than Price/Cost. Technical is more important than Past Performance.

Price/Cost is not the most important evaluation factor, but its degree of importance will increase commensurably with the degree of equality among different Offeror’s Technical and Past Performance proposals.

PART B: SPECIFIC INFORMATION

1.0 TECHNICAL

The Government will evaluate the Offeror’s proposal to determine the Offeror’s understanding of, approach to, and ability to meet the solicitation requirements. The Government will assess the Offeror’s Technical proposal with respect to its compliance with the solicitation requirements and the risk associated with the Offeror's approach. The evaluation will also include an assessment of the following:

1.1 Understanding of the Work

a. Performance Work Statement (PWS)/Statement of Work (SOW) Approach: The Government will evaluate the responses for clarity, completeness, realism, and the extent to which the proposed approach will ensure successful accomplishment of solicitation requirements.

b. Sample Task(s): The Government will evaluate the soundness and completeness of the Offeror’s sample task response(s) to determine if the offeror understands the work and is capable of successfully accomplishing the sample task.

1.2 Workforce

The Government will evaluate all proposed Key Personnel based on the resumes submitted to determine if each individual meets the minimum qualification requirements for labor category for which the individual is proposed. In addition, Key Personnel proposed to be utilized in the performance of this effort, whose labor qualifications exceed the minimum qualification requirements, may be considered a strength if the Government determines that the proposed qualification will be advantageous to the Government during contract performance.

1.3 Management Approach

a) Management Approach: The Government will evaluate the Offeror’s proposed management approach based on the information required by Section L of this solicitation determine the Offeror’s understanding of contract requirements, the soundness of the approach to meeting those requirements, the ability to plan, manage, staff, and execute the contract, and the extent to which the proposed processes and procedures ensure successful accomplishment of the tasks described in the PWS/SOW.

b) Small Business Utilization Strategy: The offeror’s strategy for utilizing Small Business, Small Disadvantaged Business, Women Owned Small Business, HUBZone Small Business, Veteran Owned Small Business, and Service-Disabled Veteran-Owned Small Business concerns compliance with any minimum required Small Business goals as identified in Section L, as well as its consistency with the proposed Small Business Subcontracting Plan will be evaluated.

(1) The extent to which such firms are specifically identified in proposals

(2) The complexity and variety of the work small firms are to perform (i.e. the Government may find favor in higher complexities of subcontract offerings with small business concerns

(3) The extent of participation of such firms in terms of the value of the total acquisition

Prospective offerors are forewarned that utilization of excessive subcontracting or JV team members may be considered as additional proposal risk. Excessive subcontracting or JV team member is considered as any offeror whose team includes more than 6 subcontractor or JV team members.

2.0 PAST PERFORMANCE

There are three aspects to the past performance evaluation: recency, relevancy, and quality. The first aspect of the past performance is to evaluate the recency of the Offeror’s past performance reference. A past performance reference will be considered recent if the contract/order has been performed within five years of the solicitation release date. Past Performance that is not recent will not be considered further in the evaluation.

The second aspect of the past performance evaluation is to evaluate the relevancy of the Offeror’s Past Performance reference. The Government will review the Offeror’s past performance information and determine the quality and usefulness as it applies to performance confidence assessment.

The third aspect of the past performance evaluation is to establish the overall quality of the Offeror’s recent relevant past performance. The Government will evaluate the Offeror, principal subcontractors, and JV team members’ performance and focus its evaluation on the following areas: 1) meeting technical requirements, i.e., the quality of technical performance; 2) meeting schedule requirements, e.g., on time or late delivery; 3) controlling contract cost; 4) managing the contracted effort, i.e., program management; and 5) utilization of small business; 6) regulatory compliance, and 7) the demonstrated systemic improvement actions taken to resolve past problems. A separate quality rating will not be assigned for each past performance contract submitted, rather the past performance confidence assessment rating is based on the Offeror’s overall record of quality of performance on recent relevant contracts.

3.0 PRICE/COST

3.1 Cost Reimbursement CLINs:

Except for otherwise unacceptable proposals when awarding on initial proposals, the Government will perform a cost realism analysis to determine the Most Probable Cost (MPC) for each applicable offeror’s proposal. Cost realism analysis is the process of independently reviewing and evaluating specific elements of each Offeror’s proposed cost to determine whether the proposed cost is realistic for the work to be performed and are consistent with the unique methods of performance and materials described in the Offeror’s technical proposal. In conducting its cost realism evaluation, the Government may review the prospective Offeror’s proposed labor categories and compare the proposed rate to the average labor rate in industry or other similar rates within the same demographic zone where the work is to be performed. Pertinent cost information, including but not limited to DCAA recommended rates for such costs as direct labor, overhead, G&A, etc., as necessary and appropriate, will be used to arrive at the Government determination of the MPC for the performance of this contract. In addition, adjustments to the cost portion of the offer may be made to include Government costs required to accomplish the Offeror’s proposed approach (e.g., additional Government-Furnished Equipment/Government-Furnished Information required by the Offeror to implement its approach) with the exception of those costs to the Government that are equal to all Offerors. The MPC to the Government is an Offeror’s total cost, including fee, and any additional adjustments the Government has determined necessary to make the proposed cost realistic for all periods. The Government will use the results of its cost realism analysis to determine the MPC of performance for each Offeror. The MPC may differ from the proposed cost. Contract awarded value, however, will be based upon the successful Offeror’s proposed costs.

Unrealistically low costs or inconsistencies between the technical and cost proposals may be assessed as Technical risk and may be assessed as weaknesses under the Technical factor. Therefore, any inconsistency, whether real or apparent, between the technical proposal and price/cost proposal should be explained in the narrative section of the price/cost proposal.

Total Professional Employee Compensation Plan:

The Government will evaluate the Offeror’s Total Compensation Plan in accordance with FAR 52.222-46.

In accordance with FAR 15.404-1(b)(2), various price analysis techniques and procedures will be employed to ensure the prices being proposed for this requirement are fair and reasonable. To assist in the overall determination of price reasonableness, NAVAIR has established a fully burdened annual labor rate ("tripwire") of $300,000 applicable to procuring Services. As part of its evaluation, the Government will identify all instances where proposed fully burdened labor rates exceed the established tripwire. The fully burdened labor rate for any proposed subcontractor labor will be calculated inclusive of all pass-through costs being applied by the prime. Any fully burdened labor rate exceeding the tripwire may ultimately be determined unreasonable absent justification.

3.2 Overall Summary Level for all CLINs

Normally, adequate price competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the PCO determines that adequate price competition does not exist and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the Offeror may be required to provide certified cost and pricing data in accordance with FAR 15.403-4.

Prospective Offerors are forewarned that if there are discrepancies between Section B, Attachment (P1), and Volume 3 Narrative, Section B prevails.

4.0 EVALUATION OF OPTIONS

Clause 52.217-8, Option to Extend Services, is incorporated in the solicitation to be utilized at the IDIQ base and Task Order level. Total evaluated cost/price of task orders will also include the six month performance period permitted under the clause, to account for a situation where invoking of the clause, in whole or part, becomes necessary. Specifically, the evaluated cost/price of this six-month period will be calculated by dividing the final ordering period by the number of months of performance to establish an estimated monthly amount. The monthly amount will then be multiplied by six to establish the estimated cost for the six-month option to extend services.

PART C: EVALUATION AND RISK ASSESSMENT DEFINITIONS

1.0 TECHNICAL EVALUATION RATINGS

The definitions below will be used by the Government when assessing solicitation compliance and the expected results of the offeror's proposed approach. The appropriate adjectival rating will be assigned to each factor and subfactor, as required. The Government will utilize a combined technical/risk rating for this effort.

Combined Technical/Risk Ratings: The combined technical/risk assignments are provided in the table below.

Table 1
COMBINED TECHNICAL/RISK RATING
Rating
Description
Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate
Marginal
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable
Proposal does not meet requirements of the solicitation, and thus contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Table 2 below provides risk rating descriptions.

Table 2
Risk Rating
Rating
Description
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.

2.0 PAST PERFORMANCE RELEVANCY RATINGS

Past Performance Relevancy Ratings: Relevant past performance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

Table 3
Past Performance Relevancy Rating
Rating
Definition
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

3.0 PERFORMANCE CONFIDENCE ASSESSMENT RATINGS

The Government will employ the Performance Confidence Assessments Rating Method described in the table below. In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown or neutral past performance.

Performance Confidence Assessment Rating: Performance Confidence Assessment rating assignments reflect the Government’s confidence that the Offeror will successfully perform the solicitation’s requirements based on the Offeror’s overall record of quality of performance on recent relevant contracts.

Table 4
Performance Confidence Assessment Rating
Rating
Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

4.0 OTHER DEFINITIONS

Strength: An aspect of an Offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

Weakness: A flaw in the proposal that increases the risk of unsuccessful contract performance. (FAR15.001)

Significant Weakness: A flaw that appreciably increases the risk of unsuccessful contract performance. (FAR 15.001)

Deficiency: A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increase the risk of unsuccessful contract performance to an unacceptable level. (FAR 15.001)

Recency: As it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.

Relevancy: As it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance.

Risk: As it pertains to source selection, is the potential for unsuccessful contract performance. The consideration of risk assesses the degree to which an Offeror’s proposed approach to achieving the technical factor or subfactor may involve risk of disruption of schedule, increased cost or degradation of performance, the need for increased Government oversight, and the likelihood of unsuccessful contract performance.

File details come from the government source that posted it.