Att_P2_Annual_Fully_Burdened_Labor.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- AIR-4. 11_ATCLS_AOOSS Federal contract opportunity
- Solicitation number
- N00421-18-R-0024
About this file
Annual Fully Burdened Labor Spreadsheet
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions to Prime Contractors for completing Attachment XX Annual Fully Burdened Labor
RFP # XX
| COLUMN/AREA | COLUMN HEADING | DESCRIPTION OF DATA UNDER THIS COLUMN HEADING |
| A | Offeror Name | Enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies |
| C | Proposed Labor Category (Furnished by Government) | Enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solication Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| D | Individual Designator* | For each individual Contractor employee proposed, the contractor shall enter the corresponding Position Number as found on Attachment XX. |
| E-I | Proposed Annual Fully-Burdened Labor per Labor Catergory, per Labor Individual Designator | Enter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period. |
Prime Burdened Labor Rates
| Offeror Name | ATTACHMENT P2 | Individual Designator* | Proposed Annual Fully-Burdened Labor | ||||
| Proposed Labor Category | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | ||
| Manager/Operations Managers* | |||||||
| Manager/Operations Managers* | |||||||
| Manager/Operations Managers* | |||||||
| Electrical Engineers* | |||||||
| Electrical Engineers* | |||||||
| Electrical Engineers | |||||||
| Program/Project/Management Analysts* | |||||||
| Network and Computer Systems Administrators | |||||||
| Network and Computer Systems Administrators | |||||||
| Computer Systems Analysts | |||||||
| Computer Systems Analysts – Contractor Site | |||||||
| Program/Project/Management Analysts | |||||||
| Program/Project/Management Analysts | |||||||
| Program/Project/Management Analysts | |||||||
| Program/Project/Management Analysts – Contractor Site | |||||||
| Budget Analysts | |||||||
| General and Operations Manager | |||||||
| Management Analysts | |||||||
| Management Analysts | |||||||
| Management Analysts – Contractor Site | |||||||
| Management Analysts | |||||||
| Engineering Technicians, Except Drafters, All Other* | |||||||
| Engineering Technicians, Except Drafters, All Other – Contractor Site* | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other – Contractor Site | |||||||
| Electrical and Electronic Engineering Technicians | |||||||
| Electrical and Electronic Engineering Technicians | |||||||
| Electrical and Electronic Engineering Technicians | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other – Contractor Site | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other – Contractor Site | |||||||
| Engineering Technicians, Except Drafters, All Other | |||||||
| Engineering Technicians, Except Drafters, All Other – Contractor Site | |||||||
| Computer Programmers | |||||||
| Computer Programmers – Contractor Site | |||||||
| Computer Programmers | |||||||
| General Clerk – Contractor Site | |||||||
| General Clerk | |||||||
| General Clerk | |||||||
| Drafters | |||||||
| Drafters | |||||||
| Drafters – Contractor Site | |||||||
| Production, Planning, and Expediting Clerks | |||||||
| Production, Planning, and Expediting Clerks – Contractor Site | |||||||
| Production, Planning, and Expediting Clerks | |||||||
| Production, Planning, and Expediting Clerks – Contractor Site | |||||||
| Stock Clerks and Order Fillers – Contractor Site |
File details come from the government source that posted it.