Att_2_QASP.doc

DOC document 191 KB Posted

Attached to
AIR-4. 11_ATCLS_AOOSS Federal contract opportunity
Solicitation number
N00421-18-R-0024
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to AIR-4. 11_ATCLS_AOOSS, newest first.
File Type Posted
N00421-18-R-0024-P00003.docx DOCX document
Amendment_3.docx DOCX document
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
N00421-18-R-0024-P00002.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
N00421-18-R-0024-P00001.docx DOCX document
Att_P3_PPIF.pdf PDF
Att_P4_CPAQ.pdf PDF
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.doc DOC document
Att_8_Locator_Form.doc DOC document
Att_3_OCI_List.doc DOC document
N00421-18-R-0024.docx DOCX document
Exhibit_A.pdf PDF
Att_5_WD_15-4279_.txt TXT text file
Att_7_GFP.xlsx XLSX spreadsheet
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
Att_1_DD254.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_6_WD_15-5635.txt TXT text file
N00421-18-R-0024_Section_L.docx DOCX document
N00421-18-R-0024_Section_M.docx DOCX document
N00421-18-R-0024_PWS.docx DOCX document
N00421-18-R-0024_Level_of_Effort.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2 Attachment 2

Quality Assurance Surveillance Plan (QASP) for Air Traffic Control and Landing Systems Operations Aboard USN Ships & Shore Based Sites 1.

Purpose This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Work Statement (PWS) for technical and engineering services to support the Air Traffic Control (ATC) Division. The intent is to ensure that the Contractor performs in accordance with the performance metrics and the Government receives the quality of services for tasks ordered under the contract.

This acquisition is for technical products and services for the Air Traffic Control (ATC) Systems Division, Naval Air Warfare Center Aircraft Division (NAWCAD), AD-4.11.7.2. The Contractor shall provide technical and engineering services, with qualified personnel, to perform the tasks listed below for the ATC Systems Division’s cognizant systems, including, but not limited to: AN/URN-25 Tactical Air Navigation (TACAN), AN/URN-32 (TACAN), AN/SPN-35 Aircraft Control Approach Center, AN/SPN-41 Aircraft Approach Control Transmitting Set, AN/TRN-28 Aircraft Approach Control Transmitting Set, AN/SPN-43 Radar Set, AN/SPN-42-T4 Precision approach Landing System (PALS), AN/TPX-42, TS-4176/UPM Radar Test Set, TS-3098/SPN Radar Test set, Instrument Landing System (ILS), Unmanned Combat Air System (UCAS), Joint Precision Approach Landing System (JPALS), FPN-63 Precision Approach Radar and Air Traffic Control and Landing Systems (ATC&LS). These systems are installed and used for ATC&LS operations aboard U.S. Navy CV, CVN, LHA, LHD, future platform class ships and at various Naval Air Stations/shore-based sites and QE Class Vessels of the British Navy.

This Single Award (SA) Indefinite Delivery Indefinite Quantity (IDIQ) contract will have Cost Plus Fixed Fee (CPFF) CLINs for Labor and Cost CLINs for Travel and Material. The contract will be for a five (5) year ordering period. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2.

Authority Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called in service contracts, to be executed by the Contracting Officer or a duly authorized representative.

3.

Scope To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth in the contract. The QASP on the other hand, is put in place to provide Government surveillance oversight of the Contractor’s efforts to assure that they are timely, effective, and are delivering the results specified in the contract.

4.

Government Resources The following definitions for Government resources are applicable to this plan:

Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer / PCO) or administer (Administrative Contracting Officer / ACO) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.4. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer’s Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting service contract. The limitations of authority are contained in a written letter of appointment.

Alternate Contracting Officer’s Representative (ACOR) – An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.

Government Project Leads (GPL) – The COR designates an individual Government Project Lead to assist in administering a specific project under the contract.

5.

Responsibilities The following Government resources shall have responsibility for the implementation of this QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the Contracting Officer for action.

Alternate Contracting Officer’s Representative (ACOR) – The ACOR is responsible for technical administration of the contract and ensures proper Government surveillance of the contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect price, terms, or conditions shall be referred to the Contracting Officer for action.

6.

Methods of QA Surveillance a.

Contractor Performance Assessment Report System (CPARS) – The marketplace for support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS for the Task Orders (TOs) under this contract. An evaluation using the CPARS format will be performed at the end of each year of performance for each TO. This evaluation will be one determinant in the exercising of options in each TO and in issuing additional TOs. For this procurement, the Government will address the quality, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DOD, and future orders, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.

b.

QASP – The below listed methods of surveillance shall be used by the COR, ACOR, or Government Project Leads (GPLs) in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist (SAC) provided herein.

7.

Surveillance

Enclosures (1) and (2) sets forth the performance standards, incentives, and surveillance methods for the contractor and COR while Enclosure (3) provides the checklist and means for the COR to document on a quarterly basis the results of the surveillance and shall be provided to the Contracting Officer on a quarterly basis.

8.

Documentation

In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.

9.

Enclosures

Enclosure (1) – Performance Based Standards/Data Standards Enclosure (2) – Incentives

Enclosure (3) – Surveillance Activity Checklist

PERFORMANCE BASED STANDARDS

Required Service

(Performance Requirements)

Standard (Performance Standards)/Maximum Allowable Degree of Deviation Requirement (AQL)
Method of Surveillance

(Quality Assurance) Incentives

Provide Fleet Services IAW PWS Para 3.3.1 and 3.3.2
The Contractor shall provide technical and engineering services in support of ATC Systems Division aboard DOD and US Navy ships IAW PWS Para 3.3.1 and 3.3.2. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Equipment Improvement Program Services IAW PWS Para 3.3.3 and 3.3.4
The Contractor shall design, develop, fabricate, assemble, test, and install ATC&LS systems, text fixtures, field changes, mods and improvements IAW PWS Para 3.3.3 and 3.3.4. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Technical Services IAW PWS Para 3.3.5 and 3.3.6
The Contractor shall provide technical, engineering, and ILS, planning, analysis and configuration management services for ATC&LS systems IAW PWS Para 3.3.5 and 3.3.6. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Operational Software Development and Maintenance Service IAW PWS Para 3.3.7 and 3.3.8

The Contractor shall provide operational software development, integration, and maintenance of computer programs IAW NAWCAD CMM processes and PWS Para 3.3.7 and 3.3.8. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Test Software Development and Maintenance IAW PWS Para 3.3.9 and 3.3.10
The Contractor shall develop and maintain ATC&LS test software and firmware programs IAW PWS Para 3.3.9 and 3.3.10. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Test Bed Services IAW PWS Para 3.3.11 and 3.3.12
The Contractor shall develop, troubleshoot, repair, operate and maintain test beds under the ATC Systems Division cognizance IAW PWS Para 3.3.11 and 3.3.12. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Repair, Fabrication, and Restoration Services IAW PWS Para 3.3.13 and 3.3.14

The Contractor shall fabricate, repair, restore, and overhaul ATC Systems Division cognizant equipment IAW PWS Para 3.3.13 and 3.3.14. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide ATC&LS Training Services IAW PWS Para 3.3.15 and 3.3.16

The Contractor shall develop, produce, update, revise, and present training material, which includes manuals, handbooks, guidebooks, and visual aids for use in training personnel in maintaining and operating ATC&LS systems and equipment IAW PWS Para 3.3.15 and 3.3.16. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback.

See Enclosure 2.

Provide Local Area Network Support IAW PWS Para 3.3.17 and 3.3.18
The Contractor shall establish performance capabilities and system configuration, and provide modifications and maintenance of Local Area Networks (LAN) systems IAW PWS Para 3.3.17 and 3.3.18. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback
See Enclosure 2.
Provide Quality Assurance (QA) and System Safety IAW PWS Para 3.3.19 and 3.3.20
The Contractor shall provide QA and system safety procedures, QA training, and operate facility wide quality management systems IAW Para 3.3.19 and 3.3.20. Based upon feedback from the Government Project Leads, the services provided are deemed comprehensive, timely and technically acceptable.
Random inspection by COR/ACOR or Government Project Leads and customer feedback
See Enclosure 2.

DATA STANDARDS

Description
Standard
(AQL)
Surveillance Method/Measure
Incentives
Engineering and Technical Services Accomplishment Report (Trip Report) A001
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Coordinated Test Plan (Test Plan and Procedures) A002

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Completed Certification Manual A003

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Recommendations Report A004

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Engineering Report A005

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Shipboard Industrial Test Procedures (Test Procedures) A006

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Configuration Sheet A007

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Contractor Eval of Tech Pubs &Recommended Changes (Technical Documentation Review Report) A008
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Engineering Change Proposal (ECP) A009

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Field Change Bulletin (FCB) A010

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Supplementary Provisioning Technical Documentation A011

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Supplemental Data for Provisioning A012

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Documentation, Management/Technical Support (Technical Manual Modifications/

Upgrades) A013

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Engineering Drawings A014
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Planned Maintenance System (PMS): Maintenance Requirement Card (MRC) A015
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Planned Maintenance System (PMS): Maintenance Index Page (MIP) A016
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Inventory Status Upgrade Report A017

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Logistics Management Information (LMI) Data Products A018
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Government Furnished Property (DD Form 1662) A019
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

User Logistic Support Summary (ULSS) A020
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Maintenance Support Plan (Maintenance/ILS Plans) A021
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Test Bed Log Book A022

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Repair/Modification/

Overhaul Status Report

A023

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Technical Repair Standard (TRS) A024
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Naval Training Systems Requirements, Acquisition and Management (Training Manuals) A025
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Training Materials A026
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Training Evaluation Document (Student Guide) A027
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Engineering and Technical Services Accomplishment Report (Training Report) A028
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Inspection and Test Plan A029
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Contractor’s Progress, Status, and Management Report (Time Expenditure Report) A030
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Funds Expenditure Report (Composite Summary Report) A031
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Funds and Man-Hour Expenditure Report (Voucher Reconciliation Report) A032
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Contractor’s Progress, Status, and Management Report (Progress Report) A033
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Trouble Report

A034

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Software Change/Enhancement Proposal A035
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Software Test Description (STD) (Computer Software Test Plans & Procedures) A036
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Software Test Report (STR) (Computer Software Test Report) A037
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Software Certification Form A038

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Software Version Description (SVD) (Computer Software Version Description Document) A039
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Software Product Specification (SPS) (Program Package Document) A040

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Computer System Operator’s Manual (System Operator’s Manual) A041
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Computer Program Support Library Inventory Report A042

Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Status Report (Landing Data Summary Report) A043
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Preliminary Allowance List A044
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Installation Control Drawings A045
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Request for Approval of Nonstandard General Purpose Electronic Test Equip (ATC&LS Test Fixture Documentation) A046
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Special Equipment Tools and Test Equipment List A047
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Maintenance Test and Support Equipment Requirements List A048
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Source Maintenance and Recoverability (SMR) Code Change Request A049
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Reliability Centered Maintenance Analysis Data A050
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Segregation of Costs and Invoice Requirements A051
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Government Owned Material (GOM) Status Report (Material Tracking Report) A052
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Operation’s Security (OPSEC) A053
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Preparation of Test Reports (Test Reports) Plan A054
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

Enclosure 2.

Web-Based Commercial Asset Visibility (CAV Reporter) A055
Submission is in accordance with the DID cited in the CDRL.
95% of required deliverable provided on time. No more than one (1) report per year may be inaccurate or require rewrite.
100% Inspection by COR, ACOR, and/or Government Project Leads
See

INCENTIVES

The following incentives shall apply to performance on the Task Order(s) under the IDIQ contract.

Assessment Period
Acceptable Performance Definition
How Measured

Incentives

Base:
All measurement areas rated at least “Satisfactory”. Two or more areas are rated as “Very Good”. See below
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition for exercising Option I.*

(-) Does not meet the acceptable performance definition for exercising Option I.*

Ordering Period I
All measurement areas rated at least “Satisfactory”. Two or more areas are rated as “Very Good”. See below
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition for exercising Option II.*

(-) Does not meet the acceptable performance definition for exercising Option II.*

Ordering Period II
All measurement areas rated at least “Satisfactory”. Two or more areas are rated as “Very Good”. See below
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition for exercising Option III.*

(-) Does not meet the acceptable performance definition for exercising Option III.*

Ordering Period III
All measurement areas rated at least “Satisfactory”. Two or more areas are rated as “Very Good”. See below
Annually using the CPARS system covering the previous 12 months.
(+) Meet the acceptable performance definition for exercising Option IV.*

(-) Does not meet the acceptable performance definition for exercising Option IV.*

Ordering Period IV
All measurement areas rated at least “Satisfactory”. Two or more areas are rated as “Very Good”. See below
Annually using the CPARS system covering the previous 12 months.

*The Government reserves the right to not exercise a Task Order Option unless all regulatory requirements are met and the conditions meet the acceptable performance definition.

All PWS/CDRL efforts will be assessed focusing on the following:

Quality– Assess the contractor’s conformance to contract/order requirements, specifications and standards of good workmanship (e.g., commonly accepted technical, professional, environmental, or safety and health standards). Include, as applicable, information on the following:

Are reports/data accurate?

Does the product or service provided meet the specifications of the contract/order?

Does the contractor’s work measure up to commonly accepted technical or professional standards?

What degree of Government technical direction was required to solve problems that arise during performance?

Schedule – Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).

This evaluation of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the evaluation period that contribute to or affect the schedule variance. Also, address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.

This element applies to contract/order closeout activities as well as contract/order performance. Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices are indicators of problems which may have resulted in variance to the contract/order schedule and should, therefore, be noted in the evaluation.

Questions to consider include the following:

Is the contractor completing the design/engineering services activities in a timely manner? This includes administrative activities, as well as meeting all scheduled milestones in the design process.

Did the contractor adequately schedule the work?

Has the contractor met administrative milestone dates?

Has the contractor met physical milestone dates specified by contract or agreed to in the project schedule?

If the schedule has slipped through the contractor’s fault or negligence, has he taken appropriate corrective action of his own volition?

Has the contractor furnished all required deliverables on or ahead of schedule?

Is the contractor completing the construction activities in a timely manner? This includes administrative activities, as well as physical construction activities such as submittal of a management response to Request for Proposal (RFPs), etc.

Has the contract furnished updated project schedules on a timely basis?

Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract/order cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. For contracts/orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed. Include, as applicable, the following information:

Does the contractor keep within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals)?

Did the contractor do anything innovative that resulted in cost savings?

Were billings current, accurate and complete?

Are the contractor’s budgetary internal controls adequate?

Has the contractor provided a design that can be constructed with the available funds?

Has the contractor notified the Government and taken necessary corrective actions when the cost estimate exceeds available funds?

Evaluation information regarding performance under an Undefinitized Contract Action (UCA), including letter contracts and actions where price has not yet been negotiated, shall be included in the annual evaluation. If the final negotiated contract/order type is not a cost-type, cost information for the period the UCA was in effect shall be included under the Cost Control element. If the final negotiated contract/order type is a cost-type, cost information for the entire period of performance shall be included under the Cost Control rating element. The narrative shall fully explain the contractor’s performance during the UCA, including definitization of the contract/order. The contractor’s performance under the UCA shall be separately identified but considered in the overall annual ratings.

Management – Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Include, as applicable, information on the following:

Is the contractor oriented toward the customer?

Is interaction between the contractor and the government satisfactory or does it need improvement?

Include the adequacy of the contractor’s accounting, billing, and estimating systems and the contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the contractor under the contract/order.

Address the timeliness of awards to subcontractors and management of subcontractors, including subcontract costs. Consider efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.

Assess the prime contractor’s effort devoted to managing subcontracts and whether subcontractors were an integral part of the contractor’s team. Are the contractor’s management, on-site, and home office personnel exhibiting the capacity to adequately plan, schedule, resource, organize and otherwise manage the work? If not, describe and relate to other rated elements.

Regulatory Compliance –

Assess compliance with all terms and conditions in the contract/order relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract. Consider questions such as the following:

Has the contractor complied with all contract clauses and reporting requirements (e.g., FAPIIS, FAR Subsection 9.104-6, FAR Clause 52.209-9)?

Has the contractor complied with Cost Accounting Standards and disclosure statements (FAR Subpart 30.2, FAR Clauses 52.230-2, 52.230-3, 52.230-4, 52.230-5, 52.230-6)?

Has the contractor complied with the reporting requirements relating to recovered material content utilized in contract performance (see FAR Subpart 23.4)?

Has the contractor complied with contractual safety requirements and labor laws (see FAR Subsection 22.407, FAR Clauses 52.222-4, 52.222-34, 52.222-20)?

Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production (FAR Subpart 42.302).

Has the contractor complied with Hazardous Material Identification and Material Safety Data (see FAR Subpart 23.3, FAR Clauses 52.223-3)?

Has the contractor complied with specifications or other contractual requirements requiring the delivery or use of environmentally preferable products, energy-efficient products, products containing recovered materials, and biobased products (FAR Subparts 23.2, 23.4, 23.7)? Monitor the contractor's environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract.

Has the contractor implemented an effective safety program; one which minimizes/mitigates potential accidents (FAR Subsection 36.513, FAR Clause 52.236-13)?

Is the contractor complying with affirmative action and EEO compliance requirements (see FAR Subpart 22.8, FAR Clauses 52.222-26, 52.222-27)?

Has the contractor complied with combating trafficking in persons (see FAR Subpart 22.17, FAR Clause 52.222-50)

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Performance Based Evaluation: The Government will evaluate contractor performance based on their ability to complete work specified in the scope and PWS paragraphs 3.1 through 3.8. The contractor shall be evaluated using the following ratings:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

QUALITY ASSURANCE SURVEILLANCE PLAN

Quarterly Surveillance:

The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Management, Regulatory Compliance, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (2).

Description
Surveillance Method/Measure
Date Planned
Date Completed
Quality
Schedule
Cost Control
Mgmt.
Regulatory Compliance
Other Areas
Provide Fleet Services IAW PWS Para 3.3.1 and 3.3.2
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Equipment Improvement Program Services IAW PWS Para 3.3.3 and 3.3.4
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Technical Services IAW PWS Para 3.3.5 and 3.3.6
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD

Provide Operational Software Development and Maintenance Service IAW PWS Para 3.3.7 and 3.3.8

Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Test Software Development and Maintenance IAW PWS Para 3.3.9 and 3.3.10
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Test Bed Services IAW PWS Para 3.3.11 and 3.3.12
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD

Provide Repair, Fabrication, and Restoration Services IAW PWS Para 3.3.13 and 3.3.14

Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD

Provide ATC&LS Training Services IAW PWS Para 3.3.15 and 3.3.16

Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Local Area Network Support IAW PWS Para 3.3.17 and 3.3.18
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD
Provide Quality Assurance (QA) and System Safety IAW PWS Para 3.3.19 and 3.3.20
Random Inspection by COR/ACOR or Government Project Lead Quarterly Input
TBD

Monthly Summary of Ratings:

Quality

Schedule

Number of Exceptional

Number of Very Good

Number of Satisfactory

Number of Marginal

Number of Unsatisfactory

Cost Control

Management

Regulatory Compliance

Other Areas

Number of Unsatisfactory

Annual Surveillance:

The COR will perform an annual assessment of overall contract performance utilizing the evaluation rating definitions listed in Enclosure 2. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the first year of the contract, which will cover only the previous 6 months.

Description
Surveillance Method/Measure
Date Planned
Date Completed
Summary Rating/Results
Quality
Review of Quarterly Ratings.
TBD
Schedule
Review of Quarterly Ratings.
TBD
Cost Control
Review of Quarterly Ratings.
TBD
Management
Review of Quarterly Ratings.
TBD
Regulatory Compliance
Review of Quarterly Ratings.
TBD
Other Areas
Review of Quarterly Ratings.
TBD

SOURCE SELECTION INFORMATION-SEE FAR 2.101 AND 3.104

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION-SEE FAR 2.101 AND 3.104

FOR OFFICIAL USE ONLY

File details come from the government source that posted it.