Att_P1_Cost_Summary.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
AIR-4. 11_ATCLS_AOOSS Federal contract opportunity
Solicitation number
N00421-18-R-0024
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Revised Attachment P1 Cost Summary

View the file

Other files for this federal contract opportunity

Other files attached to AIR-4. 11_ATCLS_AOOSS, newest first.
File Type Posted
N00421-18-R-0024-P00003.docx DOCX document
Amendment_3.docx DOCX document
N00421-18-R-0024-P00002.docx DOCX document
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
N00421-18-R-0024-P00001.docx DOCX document
Att_P3_PPIF.pdf PDF
Att_P4_CPAQ.pdf PDF
Att_P2_Annual_Fully_Burdened_Labor.xlsx XLSX spreadsheet
Att_4_Data_Transmittal.doc DOC document
Att_8_Locator_Form.doc DOC document
Att_3_OCI_List.doc DOC document
N00421-18-R-0024.docx DOCX document
Exhibit_A.pdf PDF
Att_5_WD_15-4279_.txt TXT text file
Att_2_QASP.doc DOC document
Att_7_GFP.xlsx XLSX spreadsheet
Att_P1_Cost_Summary.xlsx XLSX spreadsheet
Att_1_DD254.pdf PDF
Att_P5_CPAQ_Instructions.docx DOCX document
Att_6_WD_15-5635.txt TXT text file
N00421-18-R-0024_Section_L.docx DOCX document
N00421-18-R-0024_Section_M.docx DOCX document
N00421-18-R-0024_PWS.docx DOCX document
N00421-18-R-0024_Level_of_Effort.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions for Prime Contractor:
1Enter Prime offeror name into cell A3.
2Enter all prime employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all prime labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For each subcontractor, enter the subcontractor name, total hours, and total amount for each period of performance.
12Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
13The prime should insert the subcontractor handling charge, if any.
14The prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
15The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
16Under Other Direct Costs, the prime contractor should separate by Travel, Material and NMCI as applicable.
17Apply indirects to the Other Direct Costs if applicable and if in compliance with the RFP instructions.
18On the Summary tab, break out all costs by CLIN. Ensure that the total costs of the CLINs match Section B and the total on the Cost Summary Spreadsheet
19When submitting this file, the instructions may be deleted.
Instructions for Subcontractors:
1Enter Prime offeror name into cell A3.
Replace Prime Contractor with Subcontractor in A7, A8, A45, and A52.
2Enter all subcontractor employee names in Column A (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas.
3Enter all subcontractor labor categories in Column C (starting at row 9) If necessary, insert additional rows--but ensure integrity of formulas. In column C, the Offeror should insert the title of the labor category it will be utilizing. The Offeror is not required to utilize the Government's labor categories, however, each proposed labor category should appear opposite of the government labor category it is comparable to. Please note, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
4Only one worksheet shall be prepared for the entire period of performance (for each Prime and Subcontractor)
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6All cells shall be unprotected and unlocked, with formulae intact to show mathematical operations.
7All dollar figures shall be carried out no further than two decimal places.
8In column D, f identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
9In column E, the Offeror shall insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in the Government Spaces.
10Insert applicable indirect rates and apply accordingly. For example, if there are multiple fringe rates, insert separately and apply accordingly.
11For subcontractor cost summary sheets, delete Rows 54-97.
12When submitting this file, the instructions may be deleted.

Cost Spreadsheet (LOE)

COST SUMMARY SPREADSHEET (LOE)

Prime Offeror Name:
Subcontractor Name (if applicable):
Year 1Year 2Year 3Year 4Year 5Total
PositionCost ElementsGovernment Labor CategoryProposed Labor CategoryF/PSiteRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
1Employee Name 1Manager/Operations Managers*0000000
2Employee Name 2Manager/Operations Managers – Contractor Site*0000000
3Etc.Manager/Operations Managers*0000000
4Etc.Electrical Engineers*0000000
5Etc.Electrical Engineers*0000000
6Etc.Electrical Engineers0000000
7Etc.Program/Project/Management Analysts*0000000
8Etc.Network and Computer Systems Administrators0000000
9Etc.Network and Computer Systems Administrators0000000
10Etc.Computer Systems Analysts0000000
11Etc.Computer Systems Analysts – Contractor Site0000000
12Etc.Program/Project/Management Analysts0000000
13Etc.Program/Project/Management Analysts0000000
14Etc.Program/Project/Management Analysts0000000
15Etc.Program/Project/Management Analysts – Contractor Site0000000
16Etc.Budget Analysts0000000
17Etc.General and Operations Manager0000000
18Etc.Management Analysts0000000
19Etc.Management Analysts0000000
20Etc.Management Analysts – Contractor Site0000000
21Etc.Management Analysts0000000
22Etc.Engineering Technicians, Except Drafters, All Other*0000000
23Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
24Etc.Engineering Technicians, Except Drafters, All Other (3M)0000000
25Etc.Engineering Technicians, Except Drafters, All Other0000000
26Etc.Engineering Technicians, Except Drafters, All Other0000000
27Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
28Etc.Electrical and Electronic Engineering Technicians0000000
29Etc.Electrical and Electronic Engineering Technicians0000000
30Etc.Electrical and Electronic Engineering Technicians0000000
31Etc.Engineering Technicians, Except Drafters, All Other0000000
32Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
33Etc.Engineering Technicians, Except Drafters, All Other0000000
34Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
35Etc.Engineering Technicians, Except Drafters, All Other0000000
36Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
37Etc.Computer Programmers0000000
38Etc.Computer Programmers – Contractor Site0000000
39Etc.Computer Programmers0000000
40Etc.General Clerk – Contractor Site0000000
41Etc.General Clerk0000000
42Etc.General Clerk0000000
43Etc.Drafters0000000
44Etc.Drafters0000000
45Etc.Drafters – Contractor Site0000000
46Etc.Production, Planning, and Expediting Clerks0000000
47Etc.Production, Planning, and Expediting Clerks – Contractor Site0000000
48Etc.Production, Planning, and Expediting Clerks0000000
49Etc.Production, Planning, and Expediting Clerks – Contractor Site0000000
50Etc.Stock Clerks and Order Fillers – Contractor Site0000000
Total Direct Labor Cost0000000
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost000000
Total Direct and Indirect Labor cost000000
COM
Total Prime Contractor Labor Cost000000
Subcontractor Labor Cost
Subcontractor proposed cost and fee
1Subcontractor Name 1Manager/Operations Managers*0000000
2Subcontractor Name 2Manager/Operations Managers*0000000
3Etc.Manager/Operations Managers*0000000
4Etc.Electrical Engineers*0000000
5Etc.Electrical Engineers*0000000
6Etc.Electrical Engineers0000000
7Etc.Program/Project/Management Analysts*0000000
8Etc.Network and Computer Systems Administrators0000000
9Etc.Network and Computer Systems Administrators0000000
10Etc.Computer Systems Analysts0000000
11Etc.Computer Systems Analysts – Contractor Site0000000
12Etc.Program/Project/Management Analysts0000000
13Etc.Program/Project/Management Analysts0000000
14Etc.Program/Project/Management Analysts0000000
15Etc.Program/Project/Management Analysts – Contractor Site0000000
16Etc.Budget Analysts0000000
17Etc.General and Operations Manager0000000
18Etc.Management Analysts0000000
19Etc.Management Analysts0000000
20Etc.Management Analysts – Contractor Site0000000
21Etc.Management Analysts0000000
22Etc.Engineering Technicians, Except Drafters, All Other*0000000
23Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site*0000000
24Etc.Engineering Technicians, Except Drafters, All Other0000000
25Etc.Engineering Technicians, Except Drafters, All Other0000000
26Etc.Engineering Technicians, Except Drafters, All Other0000000
27Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
28Etc.Electrical and Electronic Engineering Technicians0000000
29Etc.Electrical and Electronic Engineering Technicians0000000
30Etc.Electrical and Electronic Engineering Technicians0000000
31Etc.Engineering Technicians, Except Drafters, All Other0000000
32Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
33Etc.Engineering Technicians, Except Drafters, All Other0000000
34Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
35Etc.Engineering Technicians, Except Drafters, All Other0000000
36Etc.Engineering Technicians, Except Drafters, All Other – Contractor Site0000000
37Etc.Computer Programmers0000000
38Etc.Computer Programmers – Contractor Site0000000
39Etc.Computer Programmers0000000
40Etc.General Clerk – Contractor Site0000000
41Etc.General Clerk0000000
42Etc.General Clerk0000000
43Etc.Drafters0000000
44Etc.Drafters0000000
45Etc.Drafters – Contractor Site0000000
46Etc.Production, Planning, and Expediting Clerks0000000
47Etc.Production, Planning, and Expediting Clerks – Contractor Site0000000
48Etc.Production, Planning, and Expediting Clerks0000000
49Etc.Production, Planning, and Expediting Clerks – Contractor Site0000000
50Etc.Stock Clerks and Order Fillers – Contractor Site0000000
Total proposed subcontractor labor cost and fee0000000
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through0

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF) 0

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs) 0

Grand Total of CPFF all CLINs

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee$0
Pass Through Amount (not including fee)$0
Prime Contractor Fee for Subcontractor Labor *$0
Total Pass Through Amount (including fee)$0ERROR:#DIV/0!
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost$0
Fixed Fee for Labor Performed by Prime Contractor$0ERROR:#DIV/0!

Page &P &F

KTR: (name) Source Selection Information - See: FAR 2.101 and 3.104 RFP:

Summary CLIN Summary Sheet

CLINSCLIN DescriptionTotal HoursTotal CostTotal Fixed FeeTotal Value $
0001Labor Term (LOE)
0007Travel
0013Material
0019Field Services
Total

File details come from the government source that posted it.