Exhibit_A.pdf
PDF 3 MB Posted
- Attached to
- AIR-4. 11_ATCLS_AOOSS Federal contract opportunity
- Solicitation number
- N00421-18-R-0024
About this file
Exhibit A
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
CDRL A004
Annex (1)
RECOMMENDATIONS REPORT FORMAT
TITLE
I. INTRODUCTION
II. APPLICABLE DOCUMENTS
III. DISCUSSION – EVALUATION/ANALYSIS
IV. CONCLUSION
V. RECOMMENDATIONS
* All deliverables shall include a cover sheet providing the following information:
- Deliverable Title
- Description of Deliverable
- Date
- Prepared for:_________________under Contract Number: _____________
- TDL Number (if applicable)
CDRL A005
Annex (2)
ENGINEERING REPORT FORMAT
I. Introduction shall consist of a narrative statement of the reasons for investigation; make reference to statement of work, technical instructions, other contract direction, previous related submittals and citation of the government authorization. It should also state aims, objectives, probability of solutions or accomplishments, estimated scope of development effort required and technical approach.
II. Discussion shall give detailed discussion of the technical effort or work performed covering procedures, equipment, facilities, data and mathematical computations used (both successful and unsuccessful), and results (both expected and unexpected).
III. Documentation should be made making reference to all related submittals (drawings, intermediate reports, laboratory reports, conference reports and other research sources).
IV. Status of Accomplishments on all assignments including priority or special assignments along with authorized advanced development pursuits. Identify ECPs/DCPs submitted along with their status, findings resulting from studies, investigations terminated, studies recommended and status of implementation. Also include alteration/modification numbers assigned.
V. Tests. Identify tests conducted by request or proposal, required to demonstrate accomplishments reports upon or necessary to collect data for assembly of special reports. List resultant test reports.
VI. Summary. The main report body shall end with a summary which should be a concise, self-explanatory recapitulation of the report.
VII. Conclusion. The report should contain a logical conclusion based on the contractor’s evaluation of data presented in the report when an evaluation is applicable. The conclusion should be concise and based on supporting arguments presented in the body of the report. Content of the conclusion is optional on less formalized reports and is left to the discretion of the contractor.
VIII. Recommendations. The report should contain recommendations, when applicable. The recommendations should be a logical outcome of the conclusions and should provide information necessary for action leading to improvements of a system or the state of the art. Less formalized reports should especially list planned new developments, proposed studies, analysis of report problems, recommended revision of logistics support, modifications and development of engineering change proposals (ECPs).
NAWCAD CONFIGURATION AID FORM
CDRL A007 Configuration Sheet
Ship:
Date:
Data Collected By:
ALTERATION INSTALLED
ALTERATION DESCRIPTION (Circle Answer)
Y N
OVERHAUL STATUS
DATE: BY:
SHIPBOARD TECHNICIANS (Circle #)
UNRESOLVED MAF
MAF NO. DESCRIPTION RESOLVED (Y/N)
NUMBER OF TECHS 0 1 2 3 4
Logistics Form 003, Rev -, April 15, 2005 PAGE 1 of 2
CDRL A007
Annex (3)
NAWCAD CONFIGURATION AID FORM
Ship:
Date:
Data Collected By:
HSC (ESWBS) EIC RIC NOMENCLATURE (RIC) LOCATION SERIAL NUMBER VALIDATED
Instructions: Validate Nomenclature, Location and Serial Number. If information is correct simply initial the "VALIDATED" column. Enter corrections in the spaces below the error. Enter additions at the
CDRL
Attachment (3)
CDRL A020
Annex (4)
USER LOGISTIC SUPPORT SUMMARY (ULSS) FORMAT
I. INTRODUCTION
II. SYSTEM DESCRIPTION, OPERATIONAL CHARACTERISTICS
III. FACILITIES
IV. PERSONNEL AND TRAINING
V. MAINTENANCE PLANNING
VI. SUPPLY SUPPORT
VII. TEST EQUIPMENT
VIII. PUBLICATIONS
IX. IN-SERVICE ENGINEERING AGENT
X. CONFIGURATION CONTROL
XI. PACKAGING AND HANDLING OF DEPOT REPAIRABLES
XII. CERTIFICATION/VERIFICATION REQUIREMENTS
Current Contract Year:
Current CLIN:
Current Current YTD YTD Current Current Current Current
Task No. Task Title Month Month ST Actual OT Actual Month Month YTD Month YTD Month YTD Total YTD
ST Hrs OT Hrs Hrs Hrs ST Labor $ OT Labor $ Labor $ Travel $ Travel $ Material $ Material $ Costs $
Outstanding Commitments
Labor:
Travel:
Material:
Anticipated Cost to Complete
Labor:
Travel:
Material:
Funds Expenditure Report
Summary
Contract Number N00421-XX-C-XXXX
CDRL ITEM A031
CDRL A030
Annex (5)
CDRL A034
Annex (6)
ATC&LS PHONE-CON ASSISTANCE RECORD
Date ____________________________ Time_________________________
Phone-con Recipient ______________________________________________________
Location ________________________________________________________________
NAWCAD POC __________________________________________________________
Activity Requesting Assistance ______________________________________________
Caller’s Identity __________________________________________________________
Location ________________________________________________________________
System/Subsystem ________________________________________________________
Description of Problem ____________________________________________________
Description of Assistance __________________________________________________
CDRL A042
Annex (7)
1. INTRODUCTION.
1.1. Purpose. This document provides an inventory of all materials contained in the
Air Traffic Control and Landing System Test Bed Computer Program Support Library.
This inventory is provided to the Naval Air Warfare Center Aircraft Division, St. Inigoes, AD-4.11.7, on a quarterly basis by (company name) in conjunction with work performed under PWS paragraph 3.4 of Contract Number _____________________.
2. COMPUTER PROGRAM SUPPORT LIBRARY INVENTORY.
2.1. Descriptive Documentation. The following listed descriptive documentation is physically located at the Test Bed, Landing Systems Test Facility (LSTF) Bldg. 2110;
Patuxent River, Maryland.
Control Number Item Description
2.2. Card Deck Storage. The following listed source/object files are stored on Card
Decks located at the Test Bed.
3. NAWCAD SUPPORT SOFTWARE LIBRARY INVENTORY (AN/TPN-22
UYK-20 PAX PROGRAM) LOAD TAPE CROSS REFERENCE LISTING
3.1. Magnetic Tape Storage. The following listed source/object files are stored on magnetic tapes located at the MATCALS Test Bed.
Control PAR Program PAR Program UYK-20
Number Version Load Tape Numbers Remarks
Landing Summary Report
35C 41A
Ship TYCOM
Desig Ship Name
TPX-42 TPX-42 Indicators
Quarterly Aircraft
Approach Usage Data EQUIPMENT AVAILABILITY PERCENTAGE Ao
Approaches 35C Indicators 35B Radar 35B Indicators
XX QUARTER FY 0X ATC STATUS REPORT (CDRL A043)
HELOS Fixed Wing Unit 1 Unit 2 CH A
CH B
(Spare) Unit 1
43C Radar
IN 1 IN 2Unit 2 CH A CH B IN 3 IN 4
COMMENTS:
CH A CH B
Operational System User
CDRL
Attachment (8)
CONTRACTS DATA REQUIREMENTS LIST Form Approved
(1 Data Item) OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP_________ TM Other _______MGMT________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
A001
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
DI-MGMT-80061A
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
LT
8. APP CODE B 13. DATE OF SUBSEQUENT SUBMISSION a. ADDRESSEE Draft
N/A Reg Repro
16. REMARKS NAWCAD 4.11.7.2 2 0
Block 5: PWS paragraphs: 3.1.5.1, 3.3.2, 3.3.4, 3.3.6, 3.3.8, 3.3.10, 3.3.12, 3.3.14, 3.3.16, 3.3.18, 3.3.20
Block 14 Address:
15. TOTAL 0 2 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
1/17/2018
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 56
Delia Felps
Deliverable Manager
Block 10, 11, 12, & 13: Due within 10 working days after completion of trip.
NAWCAD 4.11.7.2
17454 Webster Field Rd.
Code 4.11.7.2
Naval Air Warfare Center, Aircraft Division
St. Inigoes, MD 20684-4012
See Block 16 See Block 16
11. AS OF DATE
See Block 16
Block 14: Electronic copy shall be made available upon request.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Final
b. COPIES
ATC&LS Ops On Board USN Ships & Shore Based Sites N00421-17-R-0024
Engineering and Technical Services Accomplishment Report Trip Report
A002
DI-MGMT-80937
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
XX
16. REMARKS NAWCAD 4.11.7.2 1 0
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
15. TOTAL 0 1 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Coordinated Test Plan Test Plan and Procedures
PWS Paragraphs: 3.3.2.4, 3.3.4.7, 3.3.4.17, 3.3.6.10, 3.3.10.4, 3.3.14.1 NAWCAD 4.11.7.2
See Block 16 15DPTT (See Block 16)
11. AS OF DATE Final
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
Block 10, 11, 12, & 13: Due within 15 working days prior to the start of a testing period.
A TDP_________ TM X Other _______________
A003
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.7.4 2 0
15. TOTAL 0 3 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Completed Certification Manual
PWS Paragraph: 3.3.2.7 NAWCAD 4.11.7.2
Block 4: The Government will provide the contractor with the certification manuals to complete.
Block 10, 11, 12, & 13: Due within 10 working days after completion of a certification.
Code 4.11.7.4
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A004
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 5: PWS Paragraphs: 3.3.2.3, 3.3.4.2, 3.3.4.15, 3.3.4.19, 3.3.6.1, 3.3.6.4, 3.3.6.8, 3.3.8.1, 3.3.10.11, 3.3.12.5, 3.3.18.5
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Recommendations Report
See Block 16 NAWCAD 4.11.7.2
Block 4: The Contractor shall use the example format provided in Annex 1.
Block 10, 11, 12, & 13: Due within 10 working days after the identification of a possible system improvement.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4)
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A005
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Engineering Report
PWS Paragraphs: 3.3.4.1, 3.3.4.3, 3.3.4.14, 3.3.6.6 NAWCAD 4.11.7.2
Block 4: The Contractor shall use the example format provided in Annex 2.
Block 10, 11, 12, & 13: Due within 10 working days after an on-site visit or after maintenance actions have been completed.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A006
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.7.4 1 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Shipboard Industrial Test Procedure Test Procedures
PWS Paragraph: 3.3.2.6 NAWCAD 4.11.7.2
See Block 16 15 DPTT (See Block 16)
Block 4: The Contractor shall submit in Contractor format.
Block 10, 11, 12, & 13: Due within 15 working days prior to the start of certification testing.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM Other ______MGMT_________
A007
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Configuration Sheet
PWS Paragraph: 3.3.2.2, 3.3.4.11, NAWCAD 4.11.7.2
Block 4: The Contractor shall use the example format provided in Annex 3.
Block 10, 11, 12, & 13: Due within 10 working days after installation of a field change.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A008
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Contractor Eval of Tech Publications & Recommended Changes Technical Documentation Review Report
PWS Paragraphs: 3.3.4.13, 3.3.4.18, 3.3.6.2 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 10 working days after technical evaluations of proposed equipment changes.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM Other ______SESS_________
A009
DI-SESS-80639D
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Engineering Change Proposal ECP
PWS Paragraphs: 3.3.4.4, 3.3.4.5 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after the identification of a potential system engineering change.
A TDP_________ TM Other ____TMSS___________
A010
DI-TMSS-81393
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Field Change Bulletin FCB
PWS Paragraph: 3.3.4.8 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after approval of engineering change.
A TDP_________ TM Other ______SESS_________
A011
DI-PSSS-81716
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Supplementary Provisioning Technical Documentation
PWS Paragraph: 3.3.4.13 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after the implementation of an upgrade or engineering change.
A TDP_________ TM Other _______ALSS________
A012
DI-ALSS-81557
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Supplemental Data for Provisioning
PWS Paragraph: 3.3.4.13 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after the implementation of an upgrade or engineering change.
A TDP_________ TM X Other ______________
A013
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Documentation, Management/Technical Support Technical Manual Modifications/Upgrades
PWS Paragraph: 3.3.4.13, 3.3.4.17, 3.3.6.1, 3.3.6.5, 3.3.20.2 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 10 working days after the identification and incorporation of a system upgrade or change.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM Other ___DRPR____________
A014
DI-DRPR-80651
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 14 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Engineering Drawings
PWS Paragraph: 3.3.4.6, 3.3.6.5, 3.3.20.2 NAWCAD 4.11.7.2
See Block 16 10 DPTT (See Block 16)
Block 10, 11, 12, & 13: Due within 10 working days prior to the start of a testing period for prototypes and/or test fixtures.
A TDP_________ TM Other _______SESS________
A015
DI-PSSS-80991B
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 15 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Planned Maintenance System (PMS): Maintenance Requirment Card (MRC)
PWS Paragraphs: 3.3.6.1, 3.3.6.2, 3.3.6.3, 3.3.12.2, 3.3.12.3 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 10 working days after approved system change/upgrade.
A TDP_________ TM Other _______PSSS________
A016
DI-PSSS-80992B
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 16 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Planned Maintenance System (PMS): Maintenance Index Page (MIP)
PWS Paragraphs: 3.3.6.1, 3.3.6.2, 3.3.6.3, 3.3.12.2, 3.3.12.3 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 10 working days after approved system change/upgrade.
A017
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 17 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Inventory Status Upgrade Report
PWS Paragraphs: 3.3.6.5, 3.3.20.2 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Report shall be submitted each year by 30 October and updates shall be provided as requested.
A TDP_________ TM Other _______ALSS________
A018
DI-ALSS-81529
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 18 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Logistics Management Information (LMI) Data Products
PWS Paragraphs: 3.3.6.5, 3.3.6.7, 3.3.20.2 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after the implementation of an upgrade or engineering change.
N00421-17-R-0024
A019
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
Block 14: Deliverables to be provided in electronic format (Microsoft 2007 or greater). Hard copy due only upon request.
15. TOTAL 1 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 19 of 56
Delia Felps 1/17/2018
ANNLY (See Block 16) 15DATC (See Block 16)
Block 4 - To be used as guidance only.
Block 10, 11, 12 & 13 - Due 15 working days after contract award and annually thereafter.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Government Property Inventory Report
PWS Paragraphs: 3.1.2.1.3, 3.3.6.5 NAWCAD 4.11.7.2
DI-MGMT-80441C
A020
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 20 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
User Logistic Support Summary (ULSS)
PWS Paragraphs: 3.3.6.7, 3.3.6.11 NAWCAD 4.11.7.2
Block 4: The Contractor shall use the example format provided in Annex 4.
Block 10, 11, 12, & 13: Due 15 working days after installation/certification or ECP implementation.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM Other ______ILSS_________
A021
DI-ILSS-81225
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 21 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Maintenance Support Plan Maintenance/ILS Plans
PWS Paragraph: 3.3.6.7 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due 15 working days after installation/certification or ECP implementation.
A022
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 22 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Test Bed Log Book
PWS Paragraph: 3.3.12.6 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: To be kept in system test beds, and available for review upon request.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM Other _______MGMT_______
A023
DI-MGMT-80933
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
16. REMARKS NAWCAD 4.11.7.4 1 0
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 23 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Repair/Modification/Overhaul Status Report
PWS Paragraph: 3.3.4.12, 3.3.14.4 NAWCAD 4.11.7.2
WEKLY See Block 16
Block 10, 11, 12, & 13: Due weekly for each item in for repair, modification, and overhaul.
A024
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 24 of 56
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Technical Repair Standard (TRS)
PWS Paragraph: 3.3.14.2 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days after the completion of a repair, modification, or overhaul.
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
A TDP_________ TM X Other _______________
A025
OPNAVINST 1500.76B
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 25 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Naval Training Systems Requirements, Acquisition, and Management Training Manual
PWS Paragraph: 3.3.16.1 NAWCAD 4.11.7.2
Block 10, 11, 12, & 13: Due within 15 working days prior to the scheduled training session.
A TDP_________ TM Other _______ILSS_______
A026
DI-ILSS-80872 NOT 1
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 26 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Training Materials Training Aids
PWS Paragraph: 3.3.16.2 NAWCAD 4.11.7.2
A TDP_________ TM Other _______PSSS________
A027
DI-PSSS-81524C
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 27 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
Training Evaluation Document Student Guide
PWS Paragraph: 3.3.16.2, 3.3.16.3, 3.3.16.5 NAWCAD 4.11.7.2
A TDP_________ TM Other ______MGMT________
A028
DI-MGMT-80061A
7. DD 250 REQ 9.DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 28 of 56
Block 7 - XX - Acceptance will be by the COR via the Data Item Transmittal/Acceptance/Rejection Form (Attachment 4).
If this form has not been transmitted within 10 working days of submission of CDRL, the CDRL is considered accepted.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to either of these addresses.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.