Attachment_3_LSE_Data_Item_Transmittal_Acceptance_Rejection_Form.pdf
PDF 163 KB Posted
- Attached to
- AIR-4. 11, N00421-18-R-0017 Lifetime Support Engineering supporting AD-4. 11. 3 - N00421-18-R-0017
- Solicitation number
- N00421-18-R-0017
About this file
This document is a data item transmittal/acceptance/rejection form related to solicitation N00421-18-R-0017 from the Naval Air Systems Command Naval Air Warfare Center seeking lifetime support engineering services. The form provides instructions for contractors to submit contract data requirement list items for government review and acceptance or rejection within a specified timeframe. Contractors must resubmit rejected items or items requiring changes within 30 days unless otherwise noted. The related solicitation seeks amendments to the existing contract and requires acknowledgement of receipt of amendments by June 4, 2019 at 12:00 PM.
Attachment 3 - Data Item Transmittal
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0017 Attachment 3
DATA ITEM TRANSMITTAL/ACCEPTANCE/REJECTION FORM
Contract : TBD
CLIN/SLIN: / TITLE:
Block 14 Distribution:
Other:
Doc. Ref. No.: Date:
From:
To: Naval Air Warfare Center Aircraft Division, ADDRESS, ATTN: COR
The above detailed CDRL item is forwarded for review and acceptance/ rejection. This item is due
. The Government review period is days.
Sincerely, Signature: _____________________________________
Typed Name/Title: ______________________________
ENDORSEMENT: Date Received:
( ) Accepted.
( ) Accepted. Attached comments must be incorporated into the next scheduled submission.
( ) Rejected, comments attached. Change pages ( ) are ( ) not sufficient for correction.
Contractor is allowed ( ) 30 days or ( ) days to resubmit.
Signature:___________________________________________
Typed Name/Title:____________________________________
Code: Date:_______________
Return to Contractor Via: Date:
CC w/Encl.:
CC w/o Encl.:
File details come from the government source that posted it. Updated .