Attachment_1_LSE_CSP.pdf
PDF 323 KB Posted
- Attached to
- AIR-4. 11, N00421-18-R-0017 Lifetime Support Engineering supporting AD-4. 11. 3 - N00421-18-R-0017
- Solicitation number
- N00421-18-R-0017
About this file
This document is a Contract Surveillance Plan outlining oversight of a Lifetime Support Engineering contract to support the Naval Air Systems Command. The five-year contract provides engineering, technical, and logistics support services for radio communication and C5ISR systems aboard Coast Guard and Navy vessels. Key details include:
-
The Contractor will maintain combat readiness through design changes, installations, upgrades, and related efforts for RCS/C5ISR systems throughout the lifecycle of CG-47 and DDG-51 class ships. Support is not limited to Aegis combatants and includes other surface ships and submarines.
-
The contract has both cost-plus-fixed-fee labor CLINs and cost-reimbursable other direct costs CLINs for materials and travel. Quarterly evaluations will assess performance across quality, schedule, cost control, and other areas using the CPARS rating system. Annual assessments will also be conducted.
-
The Contracting Officer and Contracting Officer's Representative are responsible for oversight, while Government Project Leads will assist in administering specific efforts. Surveillance methods include reviewing reports, CDRL submissions, and conducting 100% inspections with checklists. Documentation of all oversight activities will be maintained.
Attachment 1 - CSP
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-18-R-0017
Attachment 1
Contract Surveillance Plan (CSP) for
Lifetime Support Engineering (LSE)
1. Purpose
This CSP document is developed and applied by the Government to ensure systematic
Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the contract. The intent is to ensure the Contractor performs In Accordance
With (IAW) the Statement of Work (SOW), and the Government receives the quality of services called for in each Task Order (TO) SOW.
This contract will support the Ship & Air Integrated Warfare (SAIW) Division (AD-
4.11.3) in the execution of its mission both within the Continental United States (CONUS and outside the Continental United States (OCONUS). The scope includes efforts to maintain combat readiness through engineering and management of design changes, installations, upgrades, Ship Alterations (SHIPALTs) and related efforts to the Radio
Communication System (RCS)/Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance and Reconnaissance (C5ISR) systems throughout the life cycle of Coast Guard (CG) 47 and Guided Missile Destroyer (DDG)
51 Class AEGIS ships. The scope is not limited to AEGIS combatants, and the Contractor must be knowledgeable of RCS/C5ISR systems installed on other U.S. Navy surface ships and submarines as well as those under development or planned for installation aboard new platforms.
This contract will have Cost Plus Fixed Fee (CPFF) labor Contract Line Item Numbers
(CLINS) and cost reimbursable CLINs for Other Direct Costs (ODCs) for Materiel and
Travel. The contract will have a five-year ordering period. A properly executed CSP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this surveillance document is provided under Contract Section
E - Inspection and Acceptance which provides for inspections and acceptance of the services, products and documentation called for in the contract executed by the
Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the CSP. The
Contractor, and not the Government, is responsible for the Quality Control Plan, which defines the management and quality control actions necessary to meet the quality standards set forth in the contract and all resultant orders.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the contract and each TO.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring
Contracting Officer (PCO)), or a person with the authority to administer contracts
(Administrative Contracting Officer (ACO)) and make related determinations and findings on behalf of the Government. The PCO for this contract is AIR-2.5.1.3. The
ACO will be designated in the resulting contract. Contracting officers are designated via a written warrant that sets forth limitations of authority.
Contracting Officer Representative (COR): An individual appointed in writing by the
PCO to act as their authorized representative to assist in administering the contract. The
COR will be appointed in the resulting contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the contract. The ACOR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the
Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the
Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the
Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
GPL: The GPL is responsible for assisting in administering of specific efforts under the contract. A GPL cannot, in any manner, alter the scope of the contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this contract.
Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of small business and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense (DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR and GPLs in the technical administration of this contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the checklist provided herein.
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives and surveillance methods for the Contractor, the COR and GPLs while enclosures (1) and (3) provides the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file.
The file will contain copies of all reports, evaluations, recommendations and any actions related to the Contractor’s performance of the QA function, including the originals of the
QA Checklists. All such records will be maintained for the life of the contract. The COR will forward these records to the KO at termination or completion of the contract.
9. Enclosures
Enclosure (1): Surveillance Activity Checklist
Enclosure (2): Quarterly Evaluation By Contract Data Requirements Lists
Enclosure (3): Annual Surveillance Summary
N00421-18-R-0018
Enclosure (1)
SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, Utilization of
Small Business and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
Description
Surveillance
Method/
Measure
Dates Quality
Assessment
Schedule
Assessment
Cost
Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of Small
Business
Assessment
Other
Areas
Assessment
3.3.1
Engineering
Support IAW
SOW
requirements.
100% Inspection by
COR/ACOR and/or
Government Project
Leads.
3.3.2 Technical
Support IAW
SOW
requirements.
100% Inspection by
COR/ACOR and/or
Leads
3.3.3 Logistics
Support IAW
SOW
requirements.
100% Inspection by
COR/ACOR and/or
Leads
Enclosure (2)
QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS
(CDRLs) Form DD 1423
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Technical Report - Study/Services:
COTS - Feasibility Studies of
Emerging Technologies A001
100% Inspection by COR/ACOR and/or Government Project
Installation Control Drawings
A002
100% Inspection by COR/ACOR
Product Drawings/Models and
Associated Lists: Procurement
Drawings A003
100% Inspection by COR/ACOR
Technical Information Report:
Hardware Technical
Documentation A004
100% Inspection by COR/ACOR
Shipbuilder CDRL Item Review
Comments & Technical Inputs
A005
100% Inspection by COR/ACOR
Failure Summary and Analysis
Report A006
100% Inspection by COR/ACOR and/or Government Project Leads
Maintenance Facilities
Efficiency/Productivity Analysis
Report A007
100% Inspection by COR/ACOR
Report, Record of
Meeting/Minutes: Trip
Reports/Meeting Minutes A008
100% Inspection by COR/ACOR
Readiness Deficiencies
Resolution/Response Report A009
100% Inspection by COR/ACOR
Readiness Test Report A010
100% Inspection by COR/ACOR
Enclosure (2)
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Training Program Structure
Document: OJT Plan A011
100% Inspection by COR/ACOR
Survivability and Shock Trial
Documentation A012
100% Inspection by COR/ACOR
Inspection and Test Plan:
Inspection System Plan A013
100% Inspection by COR/ACOR
Technical Report - Study/Services:
Material Status Report A014
100% Inspection by COR/ACOR
Long Lead Item Status Report
A015
100% Inspection by COR/ACOR
Product Drawings and Associated
Lists: Space Arrangement
Drawings/Equipment Elevation
Drawings A016
100% Inspection by COR/ACOR
Product Drawings and Associated
Lists: Space Arrangement
Drawings/Equipment Elevation
Drawings A017
100% Inspection by COR/ACOR
Drawings and Associated Lists:
Cable Run Sheets A018
100% Inspection by COR/ACOR
Review of LSE/ISE
Documentation A019
100% Inspection by COR/ACOR
Configuration Audit Summary
Report and Certification A020
100% Inspection by COR/ACOR
Enclosure (2)
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Management Plan: Program
Management Plan A021
100% Inspection by COR/ACOR
Design Deficiency Report A022
100% Inspection by COR/ACOR
Acquisition Logistics Support Plan:
ALSP Deficiency and Resolution
Report A023
100% Inspection by COR/ACOR
User Logistics Support Summary:
ULSS Deficiency and Resolution
Report A024
100% Inspection by COR/ACOR
Ships Maintenance and Material
Management (3-M) Manual: PMS
Documentation A025
100% Inspection by COR/ACOR
Equipment Installation
Instructions: Work Instructions
A026
100% Inspection by COR/ACOR
Project/TDL Close-Out A027
100% Inspection by COR/ACOR
Progress and Status Report:
Technical Progress Report A028
100% Inspection by COR/ACOR
Progress and Status Report:
Financial Progress Report A029
100% Inspection by COR/ACOR
Test/Procedure: Test Plans and/or
Test Procedures A030
100% Inspection by COR/ACOR
Logistics Management Information
(LMI) Data Products A031
100% Inspection by COR/ACOR
Enclosure (2)
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Technical Information Report:
PTD and ICAPs A032
100% Inspection by COR/ACOR
TOCs/TOCRs A033
100% Inspection by COR/ACOR
Technical Report - Study Services:
Cost Feasibility Report A034
100% Inspection by COR/ACOR
NAVAIR Operations Security
(OPSEC) Plan A035
100% Inspection by COR/ACOR
Period Close-Out Report A036
100% Inspection by COR/ACOR
Contract Master Staffing/Resource
Plan A037
100% Inspection by COR/ACOR
Technical and Management Work
Plan: Program Plans for
Implementation of SOW and TDLs
A038
100% Inspection by COR/ACOR
Contractor's Risk Management
Plan A039
100% Inspection by COR/ACOR
Quality System Plan: Quality
Management/Assurance Plan A040
100% Inspection by COR/ACOR
Integrated Program Management
Report (IPMR) A041
100% Inspection by COR/ACOR
Change Control Strategy A042
100% Inspection by COR/ACOR
Enclosure (2)
Description Surveillance Method / Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Detailed Project Schedule A043
100% Inspection by COR/ACOR
Detailed Task/Activity Estimate
Report A044
100% Inspection by COR/ACOR
Systems Engineering Management
Plan (SEMP) A045
100% Inspection by COR/ACOR
Enterprise-Wide Contractor
Manpower Reporting (ECMRA)
A046
100% Inspection by COR/ACOR
Segregation of Costs and Invoice
Requirements Reporting A047
100% Inspection by COR/ACOR
Integrated Program Management
Report (IPMR) A048
100% Inspection by COR/ACOR
Status Report: Information
Technology Personnel Security
Report for NAVAIR Security
A049
100% Inspection by COR/ACOR
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (3)
Annual Surveillance Summary
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure (3). This assessment will be completed annually covering the previous 12 months.
Description Surveillance Method/ Measure Date Planned Date Completed Summary Rating/Results
Quality of Product or Service Review of Quarterly Ratings
Schedule Review of Quarterly Ratings
Cost Control Review of Quarterly Ratings
Business Relations Review of Quarterly Ratings
Management Review of Quarterly Ratings
Utilization of Small Business Review of Quarterly Ratings
Other Areas Review of Quarterly Ratings
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of Small Business: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small
Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran
Owned, Service Disabled Veteran Owned Small Business and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract performance consistent with efficient performance of the contract. Evaluation will focus on the metrics of actual small business utilization as compared to the contract required targets and the Contractor’s submitted small business plan.
Other areas: Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Contractor’s performance of virtually all contract requirements consistently exceeds the acceptable standards and in addition provides numerous significant tangible or intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (>5%) below initial estimates, increased timeliness or generally enhanced effectiveness of operations).
Although a few areas require minor improvement, these areas are offset by superior performance in other areas. The few problems that do exist are insignificant in nature, have been noted and the Contractor has taken effective quick corrective action.
Very Good Performance: Contractor’s performance of most contract requirements is consistently above acceptable standards and provides significant tangible and intangible benefits to the Government (e.g., improved quality, responsiveness, reduced costs (1-5%) below the initial estimates, increased timeliness or generally enhanced effectiveness of operations). Although some areas require improvement, these areas are minor and are offset by better performance in other areas. Few, if any, recurring problems have been noted and the Contractor has taken satisfactory corrective action.
Satisfactory Performance: Contractor’s performance of most contract requirements meets the acceptable standards with some tangible or intangible benefits to the Government (e.g., improved quality, costs are consistent with expectations, responsiveness, increased timeliness, or generally enhanced effectiveness of operations). Although there are some areas of very good or excellent performance, these are more or less offset by marginal performance in other areas.
Marginal: Performance does not meet the full intent of the contract requirements. The contractual performance of the task and subtask being assessed reflect a problem for which the Contractor has not yet identified marginally corrective actions. Costs have exceeded estimates without reasonable justification. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Contractor’s performance of most contract requirements is inconsistent and frequently does not meet acceptable standards. Quality, responsiveness, and timeliness in many areas require attention and action. Cost control efforts are nearly nonexistent. Corrective actions were not taken or were ineffective.
File details come from the government source that posted it. Updated .