P7_MSE_Subcontractor_Cost_Summary.xlsx

XLSX spreadsheet 118 KB Posted

Attached to
AIR-4. 11 N00421-18-R-0003 Mission Systems Engineering (MSE) supporting AD-4. 11. 3
Solicitation number
N00421-18-R-0003
Issued by

About this file

P7-Subcontractor Cost Summary

View the file

Other files

File Type Posted
N0042118R00030002.pdf PDF
N0042118R00030001.pdf PDF
Attachment_6_MSE_Authorized_Key_Personnel.pdf PDF
P2_MSE_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_5_MSE_Authorized_Subcontractors.pdf PDF
P4_MSE_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_3_MSE_-_Data_Item_Transmittal_Acceptance_Rejection_Form.pdf PDF
Attachment_2_MSE_DD254.pdf PDF
Exhibit_A_MSE_CDRLs.xlsx XLSX spreadsheet
Attachment_8_MSE_QASP_CSP.pdf PDF
Attachment_7_MSE_COR_TBD.pdf PDF
P1_MSE_Past_Performance_Information_Form.pdf PDF
Attachment_1_MSE_Wage_Determination.pdf PDF
P6_MSE_Prime_Cost_Summary_Spreadsheet_(MSE).xlsx XLSX spreadsheet
N00421-18-R-0003_MSE_FINAL.pdf PDF
Attachment_4_MSE_-_OCI_List.pdf PDF
Exhibit_A_MSE_CDRLs.xlsx XLSX spreadsheet
Attachment_6_MSE_Authorized_Key_Personnel.pdf PDF
Attachment_4_MSE_-_OCI_List.pdf PDF
P4_MSE_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_8_MSE_QASP_CSP.pdf PDF
Attachment_7_MSE_COR_TBD.pdf PDF
P2_MSE_Contractor_Performance_Assessment_Questionnaire.pdf PDF
P6_MSE_Prime_Cost_Summary_Spreadsheet_(MSE).xlsx XLSX spreadsheet
P1_MSE_Past_Performance_Information_Form.pdf PDF
N00421-18-R-0003_MSE_DRAFT_Solicitation.pdf PDF
Attachment_5_MSE_Authorized_Subcontractors.pdf PDF
Attachment_2_MSE_DD254.pdf PDF
P7_MSE_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_1_MSE_Wage_Determination.pdf PDF
Attachment_3_MSE_-_Data_Item_Transmittal_Acceptance_Rejection_Form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
(Please note that the cells referenced below correspond to the Cost Type sheets. The Summary sheet is numbered slightly differently. )
Contractor:
1On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated.
2On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
3A worksheet has been prepared for each ordering period. Summary sheets exist for both term and completion CLINs. The information in the summary tabs should automatically carry over from the other tabs. Verify that the summary sheets are correct after completing the separate tabs for each ordering period for both Term and Completion.
4Every worksheet should have items 1 and 2 completed.
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6Within the work sheet any cell colored "blue" contains a formula that should not be edited.
7All dollar figures shall be carried out no further than two decimal places. Values with additional decimal places shall not be used within any calculations.
8In column A, starting at row 5, two Government Labor Categories from the Historical Information should have been inserted as an example to how the Contractor is to complete. The offeror shall use the labor categories identified in Section L, Part B, Paragraph 3.0, Sub-Paragraph 3.5, Paragraph 3.5.2.1 and Paragraph 3.5.2.2. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. If necessary, insert additional rows--but ensure integrity of formulas. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
9In column C, the Offeror should insert a "CF" if the worker will be performing at the Contractor's facility or a "O" if it will be performing onsite in Government spaces.
10In column D, for the contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) No input is required by the Offeror in this column.
11In column E, for the individual subcontractor workforce, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
12In column F, enter the name of the proposed individual for that position.
13In column G:
(a) enter the unburdened labor rate for each individual (e.g. rows 5-54)
(b) In Cell G57 the contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell G58 the contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In Cell G61, the contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In Cell G62, the contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In Cell G65, the contractor should insert its G&A rate being applied for work being performed at the contractor's facility.
(g) In Cell G66, the contractor should insert its G&A rate being applied for work being performed at the Client/Government's facility.
(g) In Cell G70, the contractor should insert the fixed fee rate applied to its cost.
14In column H:
(a) enter the hours associated with individual labor category for CLIN 0101 (e.g., rows 5-54).
Column H automatically calculated the total hours for all the CLINS.
Column K is a summation of the costs.
If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the contractor is only utilizing sixteen of the labor categories in rows 5-43, then the rows concerning the reamining nineteen categories would be hidden.
When submitting this file, the instructions may be deleted.

Term Year 1

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/18-9/1/19CLIN0001
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 5.0050$ 250.00$ 250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example CategoryfJohn Doe$ 6.0050$ 300.00$ 300.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal100$550.00$550.00
Base
fringe fulltime1.00%$550.00$5.50$5.50
fringe part time2.00%$0.00$0.00$0.00
subtotal$5.50$5.50
OverheadBase
Contractor site3.00%$0.00$0.00$0.00
OnSite Government4.00%$0.00$0.00$0.00
subtotal$0.00$0.00
G&A
Contractor site1.00%$0.00$0.00$0.00
OnSite Government2.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.10%$555.50$ 0.56$ 0.56
Total Labor without profit$556.06
Fee/Profit0.0%$ - 0$ - 0
Fee/Profit Pool$ - 0$ - 0
Grand Total Cost$ 0.56$ 0.56
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit550.0$ 0.56$ 0.56

Grand Total Services $ 0.56

Solicitation N00421-18-R-0003, Attachment P7 CPFF LOE Year 1

Term Year 2

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/19-9/1/20CLIN0001
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 5.0050$ 250.00$ 250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example CategoryfJohn Doe$ 6.0050$ 300.00$ 300.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal100$550.00$550.00
Base
fringe fulltime1.00%$550.00$5.50$5.50
fringe part time2.00%$0.00$0.00$0.00
subtotal$5.50$5.50
OverheadBase
Contractor site3.00%$0.00$0.00$0.00
OnSite Government4.00%$0.00$0.00$0.00
subtotal$0.00$0.00
G&A
Contractor site1.00%$0.00$0.00$0.00
OnSite Government2.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.10%$555.50$ 0.56$ 0.56
Total Labor without profit$556.06
Fee/Profit0.0%$ - 0$ - 0
Fee/Profit Pool$ - 0$ - 0
Grand Total Cost$ 0.56$ 0.56
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit550.0$ 0.56$ 0.56

Grand Total Services $ 0.56

CPFF LOE Year 2

Term Year 3

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/20-9/1/21CLIN0001
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 5.0050$ 250.00$ 250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example CategoryfJohn Doe$ 6.0050$ 300.00$ 300.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal100$550.00$550.00
Base
fringe fulltime1.00%$550.00$5.50$5.50
fringe part time2.00%$0.00$0.00$0.00
subtotal$5.50$5.50
OverheadBase
Contractor site3.00%$0.00$0.00$0.00
OnSite Government4.00%$0.00$0.00$0.00
subtotal$0.00$0.00
G&A
Contractor site1.00%$0.00$0.00$0.00
OnSite Government2.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.10%$555.50$ 0.56$ 0.56
Total Labor without profit$556.06
Fee/Profit0.0%$ - 0$ - 0
Fee/Profit Pool$ - 0$ - 0
Grand Total Cost$ 0.56$ 0.56
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit550.0$ 0.56$ 0.56

Grand Total Services $ 0.56

CPFF LOE Year 3

Term Year 4

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/21-9/1/22CLIN0001
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 5.0050$ 250.00$ 250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example CategoryfJohn Doe$ 6.0050$ 300.00$ 300.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal100$550.00$550.00
Base
fringe fulltime1.00%$550.00$5.50$5.50
fringe part time2.00%$0.00$0.00$0.00
subtotal$5.50$5.50
OverheadBase
Contractor site3.00%$0.00$0.00$0.00
OnSite Government4.00%$0.00$0.00$0.00
subtotal$0.00$0.00
G&A
Contractor site1.00%$0.00$0.00$0.00
OnSite Government2.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.10%$555.50$ 0.56$ 0.56
Total Labor without profit$556.06
Fee/Profit0.0%$ - 0$ - 0
Fee/Profit Pool$ - 0$ - 0
Grand Total Cost$ 0.56$ 0.56
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit550.0$ 0.56$ 0.56

Grand Total Services $ 0.56

CPFF LOE Year 4

Term Year 5

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/22-9/1/23CLIN0001
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 5.0050$ 250.00$ 250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example CategoryfJohn Doe$ 6.0050$ 300.00$ 300.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal100$550.00$550.00
Base
fringe fulltime1.00%$550.00$5.50$5.50
fringe part time2.00%$0.00$0.00$0.00
subtotal$5.50$5.50
OverheadBase
Contractor site3.00%$0.00$0.00$0.00
OnSite Government4.00%$0.00$0.00$0.00
subtotal$0.00$0.00
G&A
Contractor site1.00%$0.00$0.00$0.00
OnSite Government2.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.10%$555.50$ 0.56$ 0.56
Total Labor without profit$556.06
Fee/Profit0.0%$ - 0$ - 0
Fee/Profit Pool$ - 0$ - 0
Grand Total Cost$ 0.56$ 0.56
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit550.0$ 0.56$ 0.56

Grand Total Services $ 0.56

CPFF LOE Year 5

Term Summary

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/18-9/1/23CLIN0001
ServicesContractor
Government Labor Category (* = Key)Proposed Categorysiteyear 1year 2year 3year 4year 5TOTAL
Program/Project Analyst, Journeyman (Onsite)Example Category$250.00$250.00$250.00$250.00$250.00$1,250.00
Program/Project Analyst, Journeyman (Contractor Facility)Example Category$300.00$300.00$300.00$300.00$300.00$1,500.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$550.00$550.00$550.00$550.00$550.00$2,750.00
fringe fulltime$5.50$5.50$5.50$5.50$5.50
fringe part time$0.00$0.00$0.00$0.00$0.00
subtotal$5.50$5.50$5.50$5.50$5.50$27.50
Overhead
Contractor site$0.00$0.00$0.00$0.00$0.00$0.00
OnSite Government$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$0.00$0.00$0.00$0.00$0.00$0.00
G&A
Contractor site$0.00$0.00$0.00$0.00$0.00$0.00
OnSite Government$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$0.00$0.00$0.00$0.00$0.00$0.00
FCCOM$0.56$0.56$0.56$0.56$0.56$2.78
Total Labor$556.06$556.06$556.06$556.06$556.06$2,780.28

CPFF LOE Term Summary

Completion Year 1

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/18-9/1/19CLIN0007
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal3,840.0$ 79,872.00$ 79,872.00
Base
fringe fulltime0.00%$ 79,872.00$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
OverheadBase
Contractor site0.00%$ - 0$ - 0$ - 0
Onsite Government0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
G&A
Contractor site0.00%$0.00$0.00$0.00
OnSite Government0.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.00%$79,872.00$ - 0$ - 0
Total Labor without profit$79,872.00
Grand Total Cost$ - 0$ - 0
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit-0$ - 0$ - 0

Grand Total Services $ - 0

CPFF Completion Year 1

Completion Year 2

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/19-9/1/20CLIN0007
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal3,840.0$ 79,872.00$ 79,872.00
Base
fringe fulltime0.00%$ 79,872.00$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
OverheadBase
Contractor site0.00%$ - 0$ - 0$ - 0
Onsite Government0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
G&A
Contractor site0.00%$0.00$0.00$0.00
OnSite Government0.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.00%$79,872.00$ - 0$ - 0
Total Labor without profit$79,872.00
Grand Total Cost$ - 0$ - 0
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit-0$ - 0$ - 0

Grand Total Services $ - 0

CPFF Completion Year 2

Completion Year 3

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/20-9/1/21CLIN0007
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal3,840.0$ 79,872.00$ 79,872.00
Base
fringe fulltime0.00%$ 79,872.00$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
OverheadBase
Contractor site0.00%$ - 0$ - 0$ - 0
Onsite Government0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
G&A
Contractor site0.00%$0.00$0.00$0.00
OnSite Government0.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.00%$79,872.00$ - 0$ - 0
Total Labor without profit$79,872.00
Grand Total Cost$ - 0$ - 0
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit-0$ - 0$ - 0

Grand Total Services $ - 0

CPFF Completion Year 3

Completion Year 4

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/21-9/1/22CLIN0007
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal3,840.0$ 79,872.00$ 79,872.00
Base
fringe fulltime0.00%$ 79,872.00$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
OverheadBase
Contractor site0.00%$ - 0$ - 0$ - 0
Onsite Government0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
G&A
Contractor site0.00%$0.00$0.00$0.00
OnSite Government0.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.00%$79,872.00$ - 0$ - 0
Total Labor without profit$79,872.00
Grand Total Cost$ - 0$ - 0
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit-0$ - 0$ - 0

Grand Total Services $ - 0

CPFF Completion Year 4

Completion Year 5

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/22-9/1/23CLIN0007
ServicesContractorhrssubtotal
Government Labor Category (* = Key)Proposed Categorysitesubf/pEmployee NameRateLaborTotal
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
Program/Project Analyst, Journeyman (Onsite)Example CategoryfJohn Doe$ 20.801920$ 39,936.00$ 39,936.00
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
subtotal3,840.0$ 79,872.00$ 79,872.00
Base
fringe fulltime0.00%$ 79,872.00$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
OverheadBase
Contractor site0.00%$ - 0$ - 0$ - 0
Onsite Government0.00%$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0
G&A
Contractor site0.00%$0.00$0.00$0.00
OnSite Government0.00%$0.00$0.00$0.00
subtotal$ - 0$ - 0
FCCOM0.00%$79,872.00$ - 0$ - 0
Total Labor without profit$79,872.00
Grand Total Cost$ - 0$ - 0
Grand Total Fixed Fee Pool$ - 0$ - 0
Grand Total Subcontractor Labor Cost Plus Fee/Profit-0$ - 0$ - 0

Grand Total Services $ - 0

CPFF Completion Year 5

Completion Summary

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:8/31/18-9/1/23CLIN
ServicesContractor
Government Labor Category (* = Key)Proposed Categorysiteyear 1year 2year 3year 4year 5TOTAL
Program/Project Analyst, Journeyman (Onsite)Example Category$ 39,936.00$ 39,936.00$ 39,936.00$ 39,936.00$ 39,936.00$199,680.00
Program/Project Analyst, Journeyman (Contractor Facility)Example Category$ 39,936.00$ 39,936.00$ 39,936.00$ 39,936.00$ 39,936.00$199,680.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
$ - 0$ - 0$ - 0$ - 0$ - 0$0.00
subtotal79,872.0$ 79,872.00
fringe fulltime$0.00$0.00$0.00$0.00$0.00$0.00
fringe part time$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$0.00$0.00$0.00$0.00$0.00$0.00
Overhead
Contractor site$0.00$0.00$0.00$0.00$0.00$0.00
OnSite Government$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$0.00$0.00$0.00$0.00$0.00$0.00
G&A
Contractor site$0.00$0.00$0.00$0.00$0.00$0.00
OnSite Government$0.00$0.00$0.00$0.00$0.00$0.00
subtotal$0.00$0.00$0.00$0.00$0.00$0.00
FCCOM$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor$79,872.00$79,872.00$79,872.00$79,872.00$79,872.00$399,360.00

CPFF Completion Summary

File details come from the government source that posted it.