N0042118R00030001.pdf

PDF 449 KB Posted

Attached to
AIR-4. 11 N00421-18-R-0003 Mission Systems Engineering (MSE) supporting AD-4. 11. 3
Solicitation number
N00421-18-R-0003
Issued by

About this file

Solicitation Amendment 0001

View the file

Other files

File Type Posted
N0042118R00030002.pdf PDF
Attachment_6_MSE_Authorized_Key_Personnel.pdf PDF
P2_MSE_Contractor_Performance_Assessment_Questionnaire.pdf PDF
Attachment_5_MSE_Authorized_Subcontractors.pdf PDF
P4_MSE_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_3_MSE_-_Data_Item_Transmittal_Acceptance_Rejection_Form.pdf PDF
P7_MSE_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_2_MSE_DD254.pdf PDF
Exhibit_A_MSE_CDRLs.xlsx XLSX spreadsheet
Attachment_8_MSE_QASP_CSP.pdf PDF
Attachment_7_MSE_COR_TBD.pdf PDF
P1_MSE_Past_Performance_Information_Form.pdf PDF
Attachment_1_MSE_Wage_Determination.pdf PDF
P6_MSE_Prime_Cost_Summary_Spreadsheet_(MSE).xlsx XLSX spreadsheet
N00421-18-R-0003_MSE_FINAL.pdf PDF
Attachment_4_MSE_-_OCI_List.pdf PDF
Exhibit_A_MSE_CDRLs.xlsx XLSX spreadsheet
Attachment_6_MSE_Authorized_Key_Personnel.pdf PDF
Attachment_4_MSE_-_OCI_List.pdf PDF
P4_MSE_Streamlined_Rates_for_Order_Pricing.xlsx XLSX spreadsheet
Attachment_8_MSE_QASP_CSP.pdf PDF
Attachment_7_MSE_COR_TBD.pdf PDF
P2_MSE_Contractor_Performance_Assessment_Questionnaire.pdf PDF
P6_MSE_Prime_Cost_Summary_Spreadsheet_(MSE).xlsx XLSX spreadsheet
P1_MSE_Past_Performance_Information_Form.pdf PDF
N00421-18-R-0003_MSE_DRAFT_Solicitation.pdf PDF
Attachment_5_MSE_Authorized_Subcontractors.pdf PDF
Attachment_2_MSE_DD254.pdf PDF
P7_MSE_Subcontractor_Cost_Summary.xlsx XLSX spreadsheet
Attachment_1_MSE_Wage_Determination.pdf PDF
Attachment_3_MSE_-_Data_Item_Transmittal_Acceptance_Rejection_Form.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment 0001 is to modify the solicitation and to provide answ ers to questions submitted betw een 10 April 2018 and

17 April 2018.

1. CONTRACT ID CODE PAGE OF PAGES

1 23

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0042118R0003

X 9B. DATED (SEE ITEM 11)

10-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Apr-2018

CODE

NAVAL AIR WARFARE CENTER AD

CODE 2.5.1.3, BLDG 433, 47060 LILJENCRANTZ RO

PATUXENT RIVER MD 20670

N00421 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0042118R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been added by full text:

AMENDMENT 0001

The change made to Solicitation N00421-18-R-0003 and responses to questions from industry via Amendment 0001 are outlined below. The proposal due date and time have not changed; all submissions shall be in accordance with

Block 9 of the Solicitation coverpage.

Questions and Answers

Q1: Who is the incumbent contractor?

A1: Please refer to Section L, L-1, Content of Proposals, Part B, 3.0 Volume 3: Price/Cost Proposal, 3.5

Government Furnished Information, subparagraph 3.5.4 Incumbent Information.

Q2: Do the prime contractors need to identify the type of contract the prime will issue to their subcontractors?

A1: Please refer to Section L, L-1, Contend of Proposals, Part B, 3.0 Volume 3: Price/Cost Proposal, 3.1 Volume

Content, subparagraph 3.1.1. The Government has included (e) which states, “For each subcontractor, list the types of subcontract, i.e. cost plus fixed fee, firm fixed price, labor hours.” for clarification.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

SECTION L

SECTION L

L – 1 CONTENT OF PROPOSALS (SERVICES) (04 April 2018)

PART A GENERAL INSTRUCTIONS

1.0 GENERAL

1.1 The Offeror must respond to all requirements of the solicitation and not alter or rearrange the solicitation. The

Offeror is advised that the Government may incorporate any portions of the Offeror’s proposal into the resulting contract.

1.2 In presenting material in the proposal, the Offeror is advised that quality of information is more important than quantity. Clarity, brevity, and logical organization shall be emphasized during proposal preparation. Statements that the prospective Offeror understands, can comply with, or will comply with, the specifications, and paraphrasing the requirements or parts thereof without supporting information are considered inadequate by the Government, and may result in assessing weaknesses and/or deficiencies.

1.3 The Offeror must include any data that illustrates the adequacy of the various assumptions, approaches, and solutions to problems. Failure to address a specific factor or sub factor clearly may be considered a deficiency.

Unnecessarily elaborate brochures or other presentation materials beyond that sufficient to present a complete and effective proposal is neither necessary nor desired.

1.4 The Government advises the Offeror that taking exception or deviating from any term or condition of the RFP may result in the assessment of a deficiency to the proposal.

1.5 Throughout these instructions, a “principal subcontractor” is defined as a subcontractor who provides at least

20% of the proposed total price/cost (excluding the Offeror’s profit/fee), for the contract or provides one or more

Key Personnel. “JV Team member” is defined as one of the entities that make up a joint venture (JV) formed for the purpose of responding to this solicitation.

1.6 Questions: Offerors may submit questions requesting clarification of solicitation requirements by emailing

Tiffany Crayle, Contract Specialist at tiffany.crayle@navy.mil and Amy G. Davis, Contracting Officer, at amy.g.davis@navy.mil. It is required that all questions be received within 10 calendar days of the date this solicitation is issued. Questions received after 10 calendar days may not be answered prior to the proposal due date.

2.0 PROPOSAL FORMAT

2.1 Written proposals must be formatted using a Times New Roman 12 pt. Normal font (no reduction permitted), single-spaced with 1-inch margins all around, and formatted for standard 8.5 x 11 inch paper. Offeror's proposal shall not utilize compressed or condensed spacing between lines or characters in order to circumvent the provided page limits; any proposal that utilizes compressed or condensed spacing will be deemed non-compliant, will not be evaluated, and will be ineligible for award. All pages should be numbered with section and page numbers. When foldout pages are used they must not exceed 11 x 17 inches and will be counted as 1 page. Drawings may be provided separately and may be any size but should be folded to approximately 8.5 x 11 inch standard size and will count as 1 page. Graphs and tables shall be presented in no smaller than a 10 pt. font and should contain a grid, which allows values to be read directly from the graph. Graphic resolution, including such data as tables or charts, shall be no smaller than 10 pt. font and should be consistent with the purpose of the data presented.

2.2 The Offeror shall provide one complete copy of the proposal to the Procuring Contracting Officer (PCO) as electronic files fully compatible with Microsoft 2010 and for information not supported by MS Office products, with the latest Adobe Acrobat reader on a CD-ROM. The Offeror will ensure that the Price/Cost Volume is provided on a separate CD-ROM. Each CD-ROM is to be labeled with Offeror’s name and include “For Official Use Only” and

“Source Selection Information – See FAR 2.101 and 3.104.” If a discrepancy exists between the original paper copy of the proposal and the disk copy, the paper copy will take precedence.

3.0 PROPOSAL CONTENT AND VOLUMES

3.1 The Offeror must present proposal information in a manner that facilitates a one-to-one comparison between the information presented and this Proposal Instruction. Proposal information must be structured such that its Volume and paragraph number matches the Proposal Instructions Volume and paragraph number provided in section “Part B

Specific Instructions” to which it is responding, although the Offeror may add lower tier subparagraphs. The

Offeror must provide any reason(s) it will not provide information for a particular paragraph. The proposal information instructions are structured by paragraph numbers where first, second, third, and fourth parts correspond to the volume, section, and element, etc., in the Offeror’s proposal.

3.2 Each volume of the proposal shall be submitted as one original and additional copies as specified in the table below. The table below supersedes the copies requested in Block 9 of the Standard Form (SF) 33. All volumes of the original proposal shall be delivered to the address provided in Section 4.0 prior to the closing date/time stated in this solicitation. Page limitations for each volume, if any, are also specified in the table below; title pages and table of contents pages do not count towards the page limit. Any pages submitted exceeding the page limit will be disregarded and will NOT be evaluated.

3.3 Information submitted as an Annex to the proposal includes manuals, specifications, plans, procedures, and policies that exist as an official document of the company or facility, as well as other information requested in Part B mailto:tiffany.crayle@navy.mil mailto:amy.g.davis@navy.mil

Specific Instructions. Page limitations for Annexes, if any, are specified below. The authorized Annexes are summarized in the table below.

Volume Section Title Page Limitations Copies Required

1.0 Technical Proposal 1 Original;

3 Paper Copies;

1 Electronic Copy

1.1.1 Understanding of the Work

- Performance Work

Statement/Statement of

Work Approach

15 pages 1 Original;

3 Paper Copies;

1 Electronic Copy

1.1.2 Understanding of the Work

- Sample Task 15 pages

1 Original;

3 Paper Copies;

1 Electronic Copy

1.2 Workforce

- Key Personnel

Resumes/Personnel

Qualifications

2 pages per resume 1 Original;

3 Paper Copies;

1 Electronic Copy

1.3 Management Approach 20 pages 1 Original;

3 Paper Copies;

1 Electronic Copy

2 2.0 Past Performance No page limit 1 Original;

1 Paper Copy;

1 Electronic Copy

3.0

Price/Cost Proposal No Page Limit 1 Original;

1 Paper Copy

1 Electronic Copy

Annex 1 Small Business Utilization

Strategy

No page limit

1 Original;

1 Paper Copy

1 Electronic Copy

Annex 2 Past Performance

Supporting Documents

No page limit 1 Original;

1 Paper Copy

1 Electronic Copy

Annex 3 Past Performance – Cross

Reference Matrix (CRM)

1 page per Past

Performance contract reference

1 Original;

1 Paper Copy

1 Electronic Copy

Annex 4 Small Business

Subcontracting Plan

No page limit 1 Original;

1 Paper Copy

1 Electronic Copy

3.4 Each proposal volume shall contain the following information:

a. Cover and title page

b. Title of proposal and proposal number as applicable

c. Offeror’s name, address, and POC

d. RFP number

e. Proposal volume/book number

f. Copy number

g. Table of Contents (The table of contents must provide sufficient detail to enable easy location of important elements)

h. Use tabs and dividers

3.5 The Offeror shall submit a Cross Reference Matrix (CRM) for the Technical Volume, similar to the example below, to help ensure that all solicitation requirements are addressed and to facilitate the evaluators’ review of the

Offeror’s proposal. The CRM should be a single integrated matrix and cross-reference the proposal volumes and paragraphs to specific RFP requirements, as well as other parts of the proposal that contain relevant information.

The Offeror’s CRM may be identical to the example below or revised such as to add columns to indicate the page number on which information may be found, identify where other relevant information in the proposal is located, or provide other comments. The CRM does not count against any of the proposal page limitations.

EXAMPLE OF A CROSS REFERENCE MATRIX (CRM)

4.0 PROPOSAL SUBMISSION:

4.1 Offeror shall clearly mark all packages with the solicitation number. All proposals shall be received at the address below no later than the date and time specified in Block 9 of the SF 33 of the RFP.

4.2 Offeror shall hand carry or submit proposals via United States Postal Service or through a commercial carrier using the address provided below.

4.2.1 Hand carried proposals including commercial carriers (e.g. FEDEX, UPS, etc.) shall be delivered, attention to:

Tiffany Crayle and/or Amy G. Davis to the below address. When submitting hand carried proposals, contact either

Tiffany Crayle at (301) 757-1534 or Amy G. Davis at (301)757-9773 to coordinate access into the building at time of proposal delivery.

NAVAL AIR SYSTEMS COMMAND

CODE: AIR-2.5.1.3.19. (TIFFANY CRAYLE)

47060 LILJENCRANTZ ROAD, BLDG 433

PATUXENT RIVER, MD 20670

Solicitation Number: N00421-18-R-0003

4.2.2 United States Postal Service proposal delivery shall be delivered, attention to Tiffany Crayle at the following address:

DEPARTMENT OF THE NAVY

AIRCRAFT SUPPORT CONTRACTS DIVISION

ATTN (TIFFANY CRAYLE) CODE (AIR-2.5.1.3.19)

21983 BUNDY ROAD BLDG 441

PATUXENT RIVER, MD 20670-1127

Solicitation Number: N00421-18-R-0003

Section L –

Proposal

Instructions

Government

SOW/PWS

Section M –

Evaluation

Factor Offeror’s Proposal Reference

CLIN

Reference

Volume 1

Technical

Example: Para 3.1

Note: This column shall address all paragraphs in

Sections xx and xy of the

SOW/PWS.

3A Provide reference to Offeror’s

Proposal Volume I –

Technical. Example: Refer to appropriate page number in

Offeror’s written proposal

4.2.3 Offeror shall not submit proposals by facsimile or electronically via email.

5.0 PROPOSAL PACKAGING:

5.1 The Offeror shall package the proposal volumes in cartons or equivalent packaging containers in the most efficient manner possible grouping like volumes to the maximum extent possible. Each container shall be single person portable. One container shall include all Original Proposal volumes including the original and signed documents submitted as part of Volume 3 Price/Cost.

5.2 Each box shall include a packing slip detailing the contents to include the volume number, title, and copy number. Also, each box shall be stamped or marked “For Official Use Only” and “Source Selection Information –

See FAR 2.101 and 3.104.”

6.0 CLASSIFIED DATA

All proposals must be UNCLASSIFIED.

7.0 SOLICITATION CHANGES

For notice of any changes and additional information provided by the Government for the solicitation, please go to www.FedBizOpps.gov.

PART B SPECIFIC INSTRUCTIONS

Cost or pricing information shall only appear in the Price/Cost volume.

1.0 VOLUME 1: TECHNICAL

The Offeror shall provide all information and data required to conduct a thorough and complete technical evaluation.

The Offeror shall address the following in the proposal:

1.1. Understanding of the Work

1.1.1 Performance Work Statement (PWS)/Statement of Work (SOW) Approach

1.1.1.1 The offeror shall provide a written narrative of the offeror’s proposed understanding and capability to perform the requirements of the Performance Work Statement (PWS)/Statement of Work (SOW), to include all associated subtasks unless otherwise directed: 3.3.1 C5ISR Systems Engineering and IT Support, 3.3.2 C5ISR

Integration Support, and 3.3.3 ISEA and Logistics Support EXCEPT for paragraphs 3.3.1.1, 3.3.1.2, 3.3.1.3, 3.3.1.4, 3.3.2.1, 3.3.2.2, 3.3.2.3, and 3.3.3.2. The narrative shall include, but is not limited to, the elements set forth below:

1.1.1.1.1 Provide a detailed description of the approach, including a detailed step-by-step procedure and methodology which would be used in accomplishing each PWS/SOW task.

1.1.1.1.2 Identify any areas that may impact successful performance and potential risk mitigation steps.

1.1.1.2 Describe the Offeror's strategy to meet requirements of PWS/SOW 3.1.2.3. In describing its strategy, the

Offeror shall include its approach for providing adequate industrial support services, managing and protecting Government Property, and provide verification of an Approved Property Management System.

1.1.2 Sample Task:

http://www.fedbizopps.gov/

The Contractor shall provide a written response to the sample task. Offeror’s response shall include the following information and follow this outline.

(1) Team - Identify the contractor team members that are required for successful performance of the task, and if applicable, describe the roles and responsibilities of any subcontractors, and/or Joint Venture team members required to perform the work.

(2) Assumptions - Detail all assumptions (as applicable) relative to the sample task and your technical approach to ensure full understanding of your response by the Government.

(3) Technical Approach - Provide a detailed description of the technical approach, including a step-by-step procedure and methodology which would be used in accomplishing the task. Technical approach shall include the process for implementing the solution into existing infrastructure.

(4) Performance Risk Analysis - Identify contingent events inherent to the nature of the effort that could, if they were to occur, endanger satisfactory performance. Offerors are encouraged to focus on critical events that are realistically likely to occur and that would pose serious problems, rather than trying to identify every event that could cause some minor difficulty.

(5) Work Breakdown Structure/Integrated Master Schedule - Provide a detailed schedule of events and briefly describe each activity with its inputs and outputs and the interrelationships and interdependencies among the activities.

(6) Models & Tools - Identify the models and / or other tools that would be utilized to perform the task.

(7) Identify any processes used to track progress towards completion of task.

(8) Reports - Provide a list of reports(s) necessary to document the task.

(9) Level of Effort - Provide an outline of hours by labor category required to complete the task; do not include any cost information.

Sample Task 1:

NAWCAD is working with a Non-DoD agency to provide program management, engineering, integration, and sustainment support for two (2) new towers with a surveillance system being deployed along the US and Canadian border within the Swanton sector. These tower heights will range from eighty (80) to one hundred and twenty (120) feet from the ground. One system will be deployed on a fixed tower and the other will be deployed on a government owned facility roof top. This system will be integrated into the existing infrastructure complete with a command and control (C2) center receiving data feed via microwave or fiber optics from the towers in this sector to include these new additions. The engineering and technical approach must consider the environmental conditions in the design to detect suspicious activities and illegal operations conducted by foot or vehicles, which could include cars, rail, watercraft, and air-vehicles. Offeror shall propose a technical solution discussing the types of detection capabilities, communication equipment to the C2, cyber and physical security considerations, and maintainability considerations that would be required to support this type of engineering effort between multiple agency contractors, organizations, and sites. Offeror will be integrating this solution into the existing infrastructure. Offeror is encouraged to utilize various technologies within their technical solution in order to demonstrate a comprehensive understanding of the work.

Note: The Sample Tasks are issued to evaluate the Contractors ability to understand and provide the process to complete the tasking. Creative production and cost cutting solutions and ideas are always encouraged.

1.2 Workforce

The following definitions apply: A “contingent hire” is an individual who has committed, under a signed letter of intent (LOI), to being employed by the offeror with a stated salary, if the offeror is awarded the contract. A

“prospective hire” is an individual that the offeror has committed to hiring if the offeror is awarded the contract whose identity may not be known until after award.

Key Personnel Resumes/Personnel Qualifications

For proposed current or contingent Key Personnel, offeror shall provide a resume of the work assignments, training, etc., that demonstrates the experience and specialized qualifications of each key person proposed. Resumes shall contain, at a minimum, the following information:

Employee name

Years of employment experience in chronological order including narrative description of duties and responsibilities

Current position, title and employer

Educational history

Institution name, degree (type and field of study) or certification earned, and year for all degrees or certifications earned

Specialized training or certifications as it relates to the labor category qualifications and the year training was completed or certification was achieved

Current level of security clearance and status (i.e. final, interim, pending submission, or n/a)

Offeror shall only submit resumes for the number of key personnel listed in Section C, Paragraph 3.0, Sub-paragraph 3.4, Part 3.4.2.

If the qualification (i.e. education, experience) does not readily or easily compare to the minimum qualification stated in the PWS/SOW, the offeror has the burden of proof to show how proposed qualifications meet the minimum qualifications.

1.2.1 No prospective hire may be proposed as Key Personnel.

1.2.2 The Government may check backgrounds to verify experience, education and certifications received.

1.3 Management Approach

1.3.1 Overall Management Approach: Offerors shall address in sufficient detail the following:

1.3.1.1 Proposed management approach to recruiting and retaining personnel to support this specific contract. The approach shall address the ability to meet security clearance level and any Cyber IT/CSWF certifications requirements as defined in Section C, Paragraph 3.2.2.1 and Paragraph 3.4.7.1.

1.3.1.2 Proposed lines of responsibility, authority, and communication through which the tasks will be managed.

1.3.1.3 Procedures to be taken to ensure quality, security, deliverable compliance and cost control

1.3.1.4 Processes for managing the contract and Task Orders from start to finish, including the role and authority of the offeror’s Program Manager in comparison to the role played by the offeror’s indirect or corporate office.

1.3.1.5 Identification of potential performance risks and proposed risk mitigation strategies.

1.3.2 Usage of Teaming, Personnel, and Subcontractors: Offerors shall present in sufficient detail the following:

1.3.2.1 Subcontract Management Approach. Prime Contractor shall detail how the team members and/or subcontractors will be managed to ensure cohesive integration into the overall management approach.

1.3.2.2 How the offeror will leverage their strengths to increase value to the customer through technical leadership, quality assurance, and process improvement.

1.3.2.3 How and why selected subcontractor(s) were chosen, which knowledge and skills the offeror will be acquiring through each subcontract, the level of subcontract effort expected

1.3.2.4 How the offeror will maintain control during the performance of work and how the offeror will ensure subcontractors are tasked consistent with their overall and task order proposals.

1.3.2.5 Offerors shall provide all information in its proposal to clearly demonstrate that its proposal meets the solicitation's minimum requirements, to include compliance with DoD Directive 8140.01 and SECNAV M-

5239.2.

1.3.3 Small Business Utilization Strategy. As part of the Management Approach, Offerors shall present the following in Annex 1:

1.3.3.1 Small Business (SB) Utilization Strategy: All Offerors shall describe their strategies for utilizing SB

Concerns in the performance of this contract, whether as a JV teaming arrangement to achieve a Government established Small Business Participation Goal of no less than 23% of the total contract value, inclusive of options and include the following minimum goals: SDB 5%, WOSB 5%, and SDVOSB 3%. Small business offerors should include themselves in addressing their strategies. All goals shall be presented in percentages in relation to total contract value. This strategy is separate from, but shall be consistent with, the SB Subcontracting Plan, if such a

Plan is required.

1) Offerors shall specifically identify the small business subcontractors to be utilized in performance of this contract to the maximum extent practical. For each SB concern specifically identified in the proposal, provide the SB concern’s SB subcategory (e.g SDB, SDVOSB, WOSB, HUB Zone, etc.), provide the SB concern’s CAGE code (or, if not registered in System for Award Management (SAM), provide evidence of self-certification in accordance with FAR 19.703(b) as a SB concern), and the NAICS code for the work to be performed by the SB subcontractor.

2) Offerors shall describe the complexity and variety of the work small firms are to perform. For each SB subcontractor specifically identified, the offeror shall identify if the planned subcontract effort is considered to be of low, medium, or high complexity along with a brief rationale.

1.3.4 Transition Plan: The services under this solicitation are vital to the Government and must be continued without interruption. The offeror is required to submit a written narrative delineating a transition plan based on a 30 day period after award that ensures a smooth workplace changeover from an incumbent with no loss of service and minimal loss of corporate knowledge. The plan should take into consideration the following elements as well as any additional elements deemed necessary by the Offeror.

1.3.4.1 Work Turnover: The Offeror shall provide a plan of action to effectively transfer tasked work that is in process at the expiration of the current contract from the incumbent to the successor offeror.

1.3.4.2 Training – The offeror shall provide a plan of action to implement personnel training needed during the transition period to ensure continuity between the services provided by the incumbent and the successful offeror.

1.3.4.3 Risk Mitigation Strategies: The Offeror shall provide a plan of action to mitigate contract performance risks

(quality and schedule) encountered during the transition period.

1.3.4.4 Security Requirements to include OPSEC, facility clearances and base access. The offeror shall provide a plan to implement the required security clearances and physical access requirements of the contract during the transition period so that service is not interrupted.

1.3.4.5 Data Transfer – The offeror shall provide a plan of action for the efficient inventory and transfer of program data from the incumbent to the successful offeror.

1.3.4.6 Timeline – The offeror shall provide proposed schedule of events during the transition period.

2.0 VOLUME 2: PAST PERFORMANCE

2.1 General

2.1.1 Sources of past performance evaluation information include information provided by the Offeror in response to the solicitation, information obtained from questionnaires, and any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee

Performance and Integrity Information Systems, Electronic Subcontract Reporting System, or other databases; the

Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee

Determining Officials.

2.1.2 The Offeror shall complete the Past Performance Information Form, Attachment P1, for each past performance reference performed within five years of the solicitation release date. The Offeror shall submit no more than five

Past Performance Information Forms as the Prime Contractor, no more than two forms for each principal subcontractor, and/or no more than two forms for each JV team member. The Offeror shall submit written consent from its principal subcontractor(s) and JV team member(s) that will allow the Government to coordinate any past performance issues directly with the Offeror. If the Offeror does not submit the written consent, the Government will address any past performance issues directly with the principal subcontractor or JV Team member and the

Offeror will forfeit the opportunity to participate in any related communications. Consequently, for any principal subcontractor or JV team member that does not provide the written consent, the Offeror shall provide the name, job title, address, phone number, and email address for the subcontractor or JV team member POC with whom the

Government may address any past performance issues.

2.1.3 The Offeror shall provide one electronic copy of the Performance Work Statement (PWS)/Statement of Work

(SOW) for each contract reference as Annex 2 and cross reference how each provided contract aligns to the RFP

PWS/SOW. If the work was perform by a subcontractor, the Offeror shall submit the subcontract’s SOW. The

Offeror shall submit a Cross Reference Matrix (CRM), Annex 3, similar to example below. Past Performance CRMs shall be no more than one page per Past Performance reference contract. Additionally, for each contract reference, the Offeror shall provide the total number of labor hours and a breakout of hours associated with each performance period.

Contract Number (List Order Number, if

Applicable) Identified in Attachment P1

N000421-18-R-0003

PWS/SOW Paragraph

Attachment P1 Reference

PWS/SOW Paragraph

3.3.1.1

3.3.1.2

3.3.1.3

3.3.1.4

3.3.1.5

3.3.1.6

3.3.2.1

3.3.2.2

3.3.2.3

3.3.2.4

3.3.2.5

3.3.3.1

3.3.3.2

3.3.3.3

3.3.3.4

(a) Offerors may choose one of two options when submitting the Attachment P1 – Past Performance

Information Form:

(i) Offerors may fill in the information in the Contract Effort Description box of the Attachment, if the response if concise enough to fit within the limitations of the form and the information is viable when the form is printer; OR,

(ii) Offerors may designate within the Contract Effort Description Box “See Continuation Page”, and then submit a second PDF or MS Word document in order to provide the required information for the Contract Description Box of the Attachment P1 – Past Performance Information Form.

2.1.4 The primary source of past performance information will be PPIRS. If a Contractor Performance Assessment

Report (CPAR) exists for multiple years for the same contract/order, all periods of performance for that contract/order will be used for evaluation. In the event a CPAR does not exist for a past performance reference, the

Offeror shall submit a Contractor Performance Assessment Questionnaire (CPAQ), Attachment P2, to the Program

Manager who is the Assessing Official. The Offeror shall include instructions for the Program Manager to send completed questionnaires within two weeks of its receipt via e-mail to Tiffany Crayle Contract Specialist, at tiffany.crayle@navy.mil AND Amy G. Davis, Contract Officer at amy.g.davis@navy.mil, thereby allowing the customer approximately two weeks to complete their response. All CPAQs should be received by the Government concurrently with the Offeror’s proposal submission.

3.0 VOLUME 3: PRICE/COST PROPOSAL

If proposed, subcontractors and/or consultants shall provide the same information required for the prime contractor, unless otherwise noted below.

3.1 Volume Content:

3.1.1 This Volume shall contain the Contract Compliance information specified below as follows:

a. Offeror Summary Table: The Offeror shall complete the table below. The Offeror shall include all subcontractors and team members who will be involved with the performance or management of the contract and list all sites where the work will be performed. If a teaming or subcontracting arrangement is proposed, identify the work share, distribution elements, and ratios that each contractor will perform using the table below. Also provide a definition of the legal relationship between the entities if it is other than a Prime/subcontractor relationship. (Only required from Prime contractor.)

mailto:tiffany.crayle@navy.mil

Contractor Name

(Indicate Prime, Team

Member, or Sub)

CAGE

Code

Place of Performance DUNS # % of Total

Proposed Price

b. Signed SF33 for basic solicitation and acknowledgment of each amendment, including completion of any

RFP clause or provision that requires a fill-in or response. (Only required from Prime contractor.)

c. Signed Representations, Certifications, and Acknowledgements and/or System for Award Management

(SAM).

d. Guarantee the length of proposal validity (for at least 210 days after proposal submission).

e. For each subcontractor, list the type of subcontract, i.e. cost plus fixed fee, firm fixed price, labor hour.

3.1.2 This Volume shall also contain a copy of Section B with the Contract Line Item (CLIN) and Sub-CLIN Unit

Prices and, for evaluation purposes, the Total Prices filled in using the estimated quantities value in the solicitation and the instructions below. Section B prices shall be provided separately in one digital data copy in MS Office 2010

Excel format on CD-ROM media. (Only required from Prime contractor.) Within all Excel spreadsheets, the Offeror shall use formulas and functions to the maximum extent possible and avoid using output type “value only” cells. If links are utilized, supply those referenced files. Spreadsheets shall not be protected.

3.1.3 All price/cost and price/cost supporting information shall be contained in Section B and the price/cost proposal. No price or pricing information shall be included in any other proposal volume including cover letters.

Offerors are responsible for submitting sufficient information to enable the Government to fully evaluate their price/cost proposal.

3.2 Ground Rules and Assumptions:

3.2.1 As this is a competitive acquisition with adequate price competition anticipated, certified cost or pricing data in accordance with FAR 15.403-1 is not required. However, in the event that adequate price competition does not exist after receipt of proposals, the Government reserves the right to request additional cost or pricing data as necessary from both the Offeror and subcontractors. Further, the Offeror may be required to provide a Certificate of

Current Cost or Pricing Data prior to award, pursuant to FAR 15.406-2.

3.2.2 The Offeror shall provide sufficient information to support its price/cost as well as an explanation of all ground rules and assumptions that affect the price/cost estimates.

3.3 Price/Cost Information:

3.3.1 Offerors shall submit their fully completed price/cost proposal utilizing the Cost Summary Format

(Attachments P6 and P7 for the Prime and Subcontractor respectively). The spreadsheet shall be formatted on letter size (8.5 X 11) paper and shall be unprotected and unlocked, with formulae intact to show mathematical operations.

The Offeror shall use the CLIN Summary tab to breakout total proposed costs by CLIN.

3.3.2 RESERVED

3.3.3 To facilitate the establishment of streamlined task orders, the offeror shall complete Attachment P4, Streamlined Rates for Order Pricing.

3.3.3.1 Composite Fully Burdened Rates: Attachment P4 spreadsheet will consist of composite fully burdened rates for each of the key and non-key labor categories, inclusive of fee. Fully burdened rates are defined as direct labor rates plus all applicable burdens, to include indirect rates, fees, and subcontractor pass-through costs where applicable. These rates will be incorporated into Section B of the contract. The Government will utilize the rates when developing estimated labor ceilings for task orders by using the estimated hours per labor category multiplied by the composite rates found in Section B. (Only required from Prime contractor.)

3.3.3.2 Fixed Fee (Non-Performance Based/Level of Effort): Fixed Fee will be calculated based on fee per hour.

The fee per hour is the total fee proposed for all ordering periods divided by the total number of hours for all ordering periods. The offeror shall identify the Fixed Fee in Attachment P4, Streamlined Rates for Order Pricing.

The spreadsheet shall be formatted on letter size (8.5 X 11) paper and shall be unprotected and unlocked, with formulae intact to show mathematical operations. The rates will be incorporated into Section B of the contract.

(Only required for Prime Contractor)

3.3.3.3 Fixed Fee (Performance Based/Completion): Fixed fee will be calculated based on the percentage of total fee proposed for all ordering periods divided by the total proposed costs for all ordering periods. The offeror shall identify the Fixed Fee in Attachment P4, Streamlined Rates for Order Pricing. The rates will be incorporated into

Section B of the contract. (Only required for Prime Contractor)

3.3.4 RESERVED

3.3.5 The Government is not soliciting any investments. However, in order for the Government to properly assess a proposed price/cost that appears low due to a corporate decision to absorb costs, e.g., lower than usual burdens or rates, the Offeror shall fully identify and explain any such investments.

3.3.6 Direct/Indirect Rates: The Offeror shall submit Forward Pricing Rate Agreements (FPRAs), Collective

Bargaining Agreements (CBAs), and Area Wage Determinations (AWDs) as applicable for all proposed personnel.

The Offeror shall identify whether the labor rates proposed are FPRAs, CBAs, AWDs, ACO/DCAA recommended rates (FPRRs), or Offeror proposed rates (FPRPs). The Offeror shall propose in compliance with the current hourly rate set forth in the Department of Labor Wage Determination as applicable. The Offeror shall provide Defense

Contract Audit Agency (DCAA) Information/Payroll Verification information as follows: A DCAA point of contact, with a current e-mail address, must be provided for the prime and each subcontractor. The Offeror and proposed subcontractors shall provide: the most current DCAA Provisional Billing Rate Approval Letter, DCAA

Final Billing Rate Approval Letter, and/or DCAA Forward Pricing Rate Agreement recommendation; payroll verification for currently employed proposed personnel; and any other information necessary to substantiate the rates proposed. Payroll verification shall consist of a form containing the title, direct labor rate, and a signed certification by an authorized representative of the company that the information contained in the form is correct.

For key personnel contingent hires, the offeror shall provide contingent offer letters outlining salary information for contingent hire employees. For any prospective hires for non-key labor categories, provide information to substantiate the rates proposed. All contingent hires shall have a letter of intent submitted under the Cost Volume.

Any proposed consultants shall have a consultant agreement substantiating the rates proposed. If a composite rate or other pricing methodology (e.g. cost estimating relationships) is utilized, the Offeror shall demonstrate how those rates were developed. Subcontractors and team members shall provide this information either separately or included in the Offeror’s submission of this document.

3.3.6.1 If any of the rates utilized by the Offeror or any subcontractors differ from the DCAA information and/or payroll verification, a justification shall be provided for the difference. If DCAA has not reviewed the rate information for an Offeror or one of its subcontractors, the Offeror must submit a detailed justification of the proposed direct and indirect rates. The Offeror shall also provide documentation verifying that it has a DCAA approved Accounting System or state that its Accounting System has not been approved by DCAA. Offerors shall provide the last three (3) years of actual indirect information. The Government may compare a prospective

Offeror’s labor category rate to the average labor rate from industry.

3.3.7 For all Cost type CLINS (e.g., CPFF, Cost – No Fee), under the solicitation, the Offeror shall fully disclose the buildup of price/cost of each CLIN.

3.3.8 When completing the Cost Summary Spreadsheets (Attachments P6 and P7), the Offeror shall not utilize any fully burdened hourly rates when pricing the labor of its employees.

3.3.9 Offeror’s labor classification should cross reference to Department of Labor (DOL) wage determination classifications as much as possible.

3.3.10 This solicitation contains some labor categories that are subject to the Service Contract Act of 1965, as amended, and to FAR clause 52.222-41, contained in Section I of this solicitation. Offerors shall propose employee’s wages for the labor categories marked SCA in accordance with the Wage Determination shown under

Attachment 1. As part of the Price/Cost proposal, the Offeror shall furnish the names of the proposed labor categories and the corresponding labor categories from the attached Wage Determination as well as documentation of compliance with the minimum monetary wages and fringe benefits for service employees as specified in the

Wage Determination (provided as an attachment in Section J of this solicitation). Offerors are required to submit a total compensation plan setting forth salaries and fringe benefits proposed for employees (including temporary and part time employees) who will work under the contract and are subject to the Act, and explain how the compensation plan complies with the Service Contract Act.

3.3.11 RESERVED

3.3.12 Offeror shall provide a narrative that addresses any assumptions made during the preparation of the

Price/Cost proposal and discuss the basis for the cost elements listed below:

Direct labor rates by category. The Offeror is required to submit labor rates for all proposed current, contingent, and prospective hire individuals. If composite or category averages are proposed, provide a breakdown of how rates are developed. If necessary provide a narrative to describe derivation of labor rates, use of uncompensated overtime, pools to which indirect rates are applied, historical /provisional billing rates for indirect rates for the last 3 years and description, and amount of proposed other direct costs.

If the Offeror requires the use of consultants in performance of the effort, the consultant cost shall be captured under the appropriate labor CLIN not the ODCs CLIN.

Escalation on labor. Offerors, including subcontractors, shall address escalation for all labor categories, and shall provide rationale for the specific escalation rate used. Offerors that do not include escalation, or an explanation as to why it is not included, may be considered unrealistically low and may have their proposals adjusted by the Government to include escalation in the option periods.

Indirect costs (e.g., Overhead, Fringe Benefits, General & Administrative (G&A), etc.) Historical indirect costs for the past three years.

Information needed to explain the offeror’s estimating practices

Profit/Fee: Identify profit/fee rate and total amounts proposed and identify the various cost elements to which the profit/fee is being applied. Profit, Base, Award, and Incentive fee rates, as applicable in Section

B, must be clearly distinguishable. Profit/Fee shall not be applied to ODCs.

Other Direct Costs (ODCs) by specific cost element (e.g., Travel & Material). Reimbursement for Travel will be in accordance with the Joint Travel Regulations. If the Offeror proposes burdens on the

Government provided ODC estimates, the Offeror shall provide a percentage breakdown of the Offeror’s indirect costs and burdens added to the Government estimates for any and all Cost Reimbursable CLINs in

Section B.

When the Offeror elects to claim Cost of Money (COM) as an allowable cost, the Offeror must submit a

COM form and show the calculations of the proposed amount.

3.4 Total Professional Compensation Plan:

3.4.1 The Offeror shall provide a Total Compensation Plan in accordance with FAR 52.222-46 and FAR 22.1103 for each proposed professional employee. For evaluation purposes, see Section C, paragraph 3.4.7 for the labor categories deemed to be professional. The Plan shall include, but not limited to, the following items:

a. The proposed direct labor rate for each professional employee proposed;

b. The total cost of the proposed fringe benefits package for each professional employee proposed, including:

i. list and brief summary of the benefits that make up the fringe package (e.g. vacation time, sick leave, stock, incentive plans, family leave, life insurance, severance pay, bonus plans, health insurance, holidays, location allowance, retirement benefits); and

ii. an itemization of the benefits that require employee contributions, and the amount of that contribution as a percentage of the cost of the particular benefit; and

c. Data, such as recognized national and regional compensation surveys and studies of professional, public and private organizations, used by the Offeror in establishing the total compensation structure.

3.5 Government Furnished Information

3.5.1 ODCs

The Government’s estimates for ODCs for the prime and all subcontract efforts, unburdened are listed below:

ODCs associated with CPFF LOE and CPFF Completion – CLIN 0013

CLIN 0013 Travel Material Total

Year 1 $400,000.00 $3,750,000.00 $4,150,000.00

Year 2 $409,200.00 $3,836,250.00 $4,245,450.00

Year 3 $418,611.60 $3,924,483.75 $4,343,095.35

Year 4 $428,239.67 $4,014,746.88 $4,442,986.55

Year 5 $438,089.18 $4,107,086.05 $4,545,175.23

Total $2,094,140.45 19,632,566.68 $21,726,707.13

The offeror shall utilize the estimated amounts provided by the Government for ODCs and include all applicable burdens. If it is the contractor’s accounting practice to apply (and invoice for) burdens with regards to ODCs, then the contractor shall propose the ODC amount plus the addition of the applicable burdens. If the contractor chooses not to burden ODCs, then the contractor shall propose an H-clause to identify the unallowability of burden cost to the contract. These costs in the table above do not include cost for PWS/SOW 3.1.2.3 Industrial Support Services.

NO FEE SHALL BE APPLIED TO ODCs.

3.5.2. Labor Hours

The Government total labor hour (Term and Completion) estimate is 854,400 hours during all ordering periods for the entire work effort. A work-year is defined as 1920 hours exclusive of holidays and leave. For evaluation purposes, the contractor shall propose the labor categories/hours as outlined below.

3.5.2.1 CPFF Non-Performance Based/LOE

The Government estimate is 768,960 hours for Non-Performance Based/LOE for the entire work effort, inclusive of options. A work-year is defined as 1920 hours exclusive of holidays and leave. The estimate hours shall be used for pricing and setting ceiling at the basic contract level for the CPFF Non-Performance Based/LOE Labor CLIN. For evaluation purposes, the Offeror shall propose the labor categories and hours as outlined below:

Non Performance Based (CLINS 0001-0006) TERM Government-Site Hours

Contract Labor Category Key/Non-

Key

Work

Year I

Work

Year II

Work

Year III

Work

Year IV

Work

Year V Total

Computer Programmer II

(SCA)

Non-Key 2,074 2,074 2,074 2,074 2,074 10,370

Computer Programmer III

(SCA)

Non-Key 691 691 691 691 691 3,455

Configuration Management

Analyst/Management

Analyst, Journeyman Key 691 691 691 691 691 3,455

Drafter/CAD Operator I

(SCA)

Non-Key 691 691 691 691 691 3,455

Drafter/CAD Operator II

(SCA)

Non-Key 691 691 691 691 691 3,455

Electrical and Electronic

Engineering Technician

(Electronics Technician

Maintenance II) (SCA)

Non-Key 5,530 5,530 5,530 5,530 5,530 27,650

Electrical and Electronic

Engineering Technician

(Electronics Technician

Maintenance III) (SCA)

Non-Key 3,456 3,456 3,456 3,456 3,456 17,280

Electrical Engineer, Journeyman Non-Key 3,456 3,456 3,456 3,456 3,456 17,280

Electrical Engineer, Junior Non-Key 691 691 691 691 691 3,455

Electrical Engineer, Senior Key 691 691 691 691 691 3,455

Electrical Engineer, Senior Non-Key 1,383 1,383 1,383 1,383 1,383 6,915

Mechanical Engineer, Journeyman Non-Key 2,765 2,765 2,765 2,765 2,765 13,825

Mechanical Engineer, Junior Non-Key 691 691 691 691 691 3,455

Mechanical Engineer, Senior Key 691 691 691 691 691 3,455

Computer Hardware

Engineer, Journeyman Non-Key 2,765 2,765 2,765 2,765 2,765 13,825

Computer Hardware

Engineer, Junior Non-Key 691 691 691 691 691 3,455

Computer Hardware

Engineer, Senior Key 691 691 691 691 691 3,455

(Engineering Technician I

(SCA)

Non-Key 2,074 2,074 2,074 2,074 2,074 10,370

Engineering Technician II

(SCA)

Non-Key 2,074 2,074 2,074 2,074 2,074 10,370

Engineering Technician III

(SCA)

Non-Key 1,382 1,382 1,382 1,382 1,382 6,910

Engineering Technician IV

(SCA)

Non-Key 1,382 1,382 1,382 1,382 1,382 6,910

Executive Secretaries and

Executive Administrative

Assistant (General Clerk I)

(SCA)

Non-Key 1,382 1,382 1,382 1,382 1,382 6,910

Logistician, Journeyman Non-Key 691 691 691 691 691 3,455

Logistician, Senior Non-Key 691 691 691 691 691 3,455

Manager/Operations

Manager, Senior (Project

Manager) Key 691 691 691 691 691 3,455

Manager/Operations

Manager, Senior (Project

Manager)

Non-Key 2,074 2,074 2,074 2,074 2,074 10,370

Manager/Operations

Manager, Senior (Program

Manager) Key 691 691 691 691 691 3,455

Program/Project/Manageme nt Analyst, Journeyman Non-Key 2,074 2,074 2,074 2,074 2,074 10,370

Management Analyst, Journeyman (Systems

Analyst)

Non-Key 6,912 6,912 6,912 6,912 6,912 34,560

Management Analyst, Senior (Systems Analyst) Key 691 691 691 691 691 3,455

Management Analyst, Senior (Systems Analyst) Non-Key 4,839 4,839 4,839 4,839 4,839 24,195

Engineer, Journeyman

(Systems Engineer) Non-Key 1,382 1,382 1,382 1,382…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.