P3_-_Cost_Summary_Spreadsheet_-_AVMI_(Split).xlsx
XLSX spreadsheet 130 KB Posted
- Attached to
- Industry Questions & Pre-Solicitation Conference Brief Federal contract opportunity
- Solicitation number
- N00421-17-R-0071
About this file
P3 - Cost Summary Spreadsheet
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
Instructions
| Contractor: | |
| 1 | On Header Tab for each worksheet, insert the proposal number. The file name should be populated. |
| 2 | On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in. |
| 3 | Columns I, L, O, R and U on the RDT&E and NWCF sheet are totals for each year. A CLIN SUMMARY SHEET OF ALL PERIODS NEEDS TO BE COMPLETED AS A SEPARATE TAB. |
| 4 | The worksheets of the workbook should remain in its current format. |
| 5 | Within the work sheet any cell colored "blue" contains a formula and should not be edited, unless there is an error in the formula. It is the Contractor's responsibility to verify all formulas and to correct them, if necessary. The Government does not warrant that the formulas are correct. |
| 6 | All dollar figures shall be carried out no further than two decimal places. |
| 7 | The worksheet is arranged that the workforce being proposed for an entire period of performance is shown together. When the numbers are carried to Section B, they will be the same as shown on the worksheet CLIN SUMMARY. |
| For RDT&E (Pax River) and NWCF (WD) Tabs | |
| 8 | In column A, starting at row 5, the Government Labor Categories from the Government Furnished Information in Section L, Part B, paragraph 3.5 is included. In column B, the Offeror can insert the title of its company labor category it will be utilizing, which is comparable to the Government Labor Category that it appears opposite to. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is required to utilize the Government's labor categories and hours as provided in Section L of the solicitation. In evaluation, the Offeror's proposal will be compared to the Labor categories and Hours provided in Section L, paragraph 3.5 (Government Furnished Information). Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes two Senior Systems Analysts, then the labor category Senior Systems Analyst shall be listed separately for each individual along with their applicable rates and information. In the yellow portion of the spreadsheet (row 85), in column A, the prime offeror will enter the company name of any subcontractor that is being proposed. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas. |
| 9 | In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces. |
| 10 | In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing personnel that will be employed by the prime, whether current employees, contingent hires or prospective hires. -it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Prime Offeror in this column. |
| 11 | In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time. |
| 12 | In column F, enter the name of the proposed individual for that position for the prime's proposed workforce only. |
| 13 | Note: Offerors shall refer to solicitation Section L, Part B, Paragraph 3.5.2 "Labor Hours" for additional guidance pertaining to prime and subcontractor rates. |
In column G, and then similarly for Columns J, M, P, and S:
| (a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-62) |
| (b)The prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate, in the appropriate row. If the fringe is included in the overhead rate, this cell should be left blank. |
| (c) The prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank. |
| (d) As required by the Wage Determination, the contractor shall include that cost associated with those rates on their Attachment P3 (e.g. Health and Welfare - $4.41 per hour). If this value is different from the normal fringe rate applied to the direct labor categories, a row should be added to accommodate this requirement. |
| (e) The prime contractor should insert its overhead rate for work performed at the contractor's facility in the applicable row. |
| (f) The prime contractor should insert its overhead rate for work performed at the Client/Government's facility in the appropriate row. |
| (g) The prime contractor should insert its G&A rate being applied in the appropriate row. |
| (h) In the yellow section, if a subcontractor is proposed, the prime offeror shall enter the fully burden cost (including fixed fee) being proposed by that subcontractor for each year of the contract (columns I, L, O, R and U). |
| (i) The prime should insert the prime's subcontractor handling charge in the appropriate row, if applicable. |
| (j) The prime should insert the fixed fee rate applied to its Labor cost excluding subcontractor labor. |
| (k) The prime should insert the fixed fee rate it is applying to the subcontractor labor, if any. |
| 14 | In column H, and then similarly for Columns K, N, Q, and T: |
| (a) In column H for the prime contractor, enter the hours associated with individual labor categories for CLIN X001 and X005 (columns H, K, N, Q and T). |
Note: Offerors shall provide hours in accordance with Section L, Part B, Paragraph 3.5.2 "Labor Hours", CPFF Labor CLIN Table
| (b) The prime contractor should insert the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (c) The prime contractor should insert the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. | |
| (d) The prime contractor should insert the base its overhead rate is being applied to for work performed at the contractor's facility. | |
| (e) The prime contractor should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility. | |
| (f) The prime contractor should insert the base its G&A rate is being applied to. | |
| (g) The prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor). | |
| (h) The prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any. | |
| (i) Under Other Direct Costs, the Government has entered Material, Travel, and ODCs by CLIN for each contract year. | |
| 15 | Insert similar "labor base" totals in columns K,N,Q and T in appropriate cells. |
| 16 | Column V is a summation of the costs. |
| 17 | Column W should automatically calculate the total hours for all rows. |
| 18 | Other Direct Costs - Material, Travel, and ODCs estimates are supplied by the Government. |
| 19 | Enter the rate for material handling if it is being applied to Material, Travel, and ODCs. If not applying a material handling should be left blank. |
| 20 | Enter the rate for G&A if it is being applied to Material, Travel, and ODCs. If not, applying a G&A should be left blank. |
| Burdened CPFF Labor Rates Worksheet: | |
| 21 | In Column B, enter the Offeror (Prime's name or Subcontractor's name) in this field to distinguish between the companies |
| 22 | In Column C, enter the Proposed Labor Category, as recorded in the Prime or Subcontractor's accounting system, that correlates to each of the Government solicitation Labor Category on that row. Spell and format entry the same every time it is used on the template (for example, when it relates to the Prime Offeror's rates on one row and to a Subcontractor's rates on another row). If the Offeror determines that no personnel will be proposed to perform work defined by one of the Government Estimate Labor Categories listed, enter "NA". |
| 23 | In Column D, For each individual Contractor employee proposed; enter a different identifying title in the form of FTE## (e.g. FTE01, FTE02, etc.) for each individual to distinguish them from one another. Do not enter the individual's name into the template. |
| 24 | In Columns E-I, Enter the Annual Fully-Burdened Labor proposed for the applicable performance period (e.g. Base or Year_#) for personnel associated with the Proposed Labor Category and Individual Designator. Enter numbers only, in U.S. Dollar format $###.## rounded to the nearest cent. Annual Fully-Burdened Labor shall include fringe, overhead, G&A, and fee on total cost, but should not include Fully-Burdened Other Direct Costs (ODCs) such as Materials, Travel, and Cost of Money costs. Annual Fully-Burdened Labor shall be the Fully-Burdened Labor Rate times the amount of hours proposed for the applicable performance period. |
| CLIN Summary Worksheet: | |
| 25 | On the CLIN Summary tab, break out all costs by CLIN and validate the links to ensure that the total costs of the CLINs match Section B and the totals on the Cost Summary Spreadsheet. |
| 26 | When submitting this file, the instructions may be deleted. |
| **Add instructions for new format*** |
PAX (RDT&E X001 - X004 )
| DO NOT TYPE IN ANY COLORED AREAS | Base Year | Option Year I | Option Year II | Option Year III | Option Year IV | Total $ | Total Hours | |||||||||||||||
| CPFF | CLIN | 0001 | CLIN | 1001 | CLIN | 2001 | CLIN | 3001 | CLIN | 4001 | ||||||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | |||||||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | |||||||
| Patuxent River, MD | ||||||||||||||||||||||
| Acquisition Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Administrative Assistant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Aircraft Welder | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer Support Technician | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Configuration Manager | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Instrumentation | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Junior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Structural | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Facility Support Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Maintenance Worker | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Graphic Designer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Hangar Manager | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| IA Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| IA Specialist, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Laborer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Management Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Program Manager, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Documentation Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Safety Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Supply Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| System Administrator II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| System Administrator III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Tool and Parts Attendant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech IV - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| Overhead | ||||||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Subtotal Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontractors | hrs | $ | hrs | $ | hrs | $ | hrs | $ | hrs | $ | Total $ | |||||||
| Sub: 1: | ||||||||||||||||||
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 1 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 2: | ||||||||||||||||||
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 2 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 3 | ||||||||||||||||||
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 3 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 4: | ||||||||||||||||||
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 4 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 5: | ||||||||||||||||||
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 5 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 6: | ||||||||||||||||||
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 6 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 7 | ||||||||||||||||||
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 7 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 8: | ||||||||||||||||||
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 8 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Total of all Subcontractors | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit - prime | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Cost (CLINs 0001, 1001, 2001, 3001 and 4001) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fee/Profit Pool (CLINs 0001, 1001, 2001, 3001 and 4001) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Total Hours | |||||
| Total Labor and Subcontractor Cost Plus Fee/Profit (CLINs 0001, 1001, 2001, 3001 and 4001) | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 |
| Other Direct Costs | |||||||||||
| Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | ||||||
| (description) | (description) | (description) | (description) | (description) | (description) | ||||||
| Material (CLINs 0002, 1002, 2002, 3002, and 4002) | $2,400,000.00 | $2,400,000.00 | $2,400,000.00 | $2,400,000.00 | $2,400,000.00 | $ 12,000,000.00 | |||||
| Travel (CLINs 0003, 1003, 2003, 3003, and 4003) | $400,000.00 | $400,000.00 | $400,000.00 | $400,000.00 | $400,000.00 | $ 2,000,000.00 | |||||
| ODCs (CLINs 0004, 1004, 2004, 3004, and 4004) | $300,000.00 | $300,000.00 | $300,000.00 | $300,000.00 | $300,000.00 | $ 1,500,000.00 | |||||
| ODC subtotal | $3,100,000.00 | $3,100,000.00 | $3,100,000.00 | $ 3,100,000.00 | $ 3,100,000.00 | $ 15,500,000.00 | |||||
| material handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| G&A on ODC | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| Total ODC | $3,100,000.00 | $ 3,100,000.00 | $ 3,100,000.00 | $ 3,100,000.00 | $ 3,100,000.00 | $ 15,500,000.00 |
Grand Total Services & ODC $ 3,100,000.00 $ 3,100,000.00 $ 3,100,000.00 $ 3,100,000.00 $ 3,100,000.00 $ 15,500,000.00
&F (insert proposal number) &A
Attachment_P3_Cost Summary Spreadsheet (insert proposal number) &A
KTR:(insert name) Source Selection Information See: FAR 3.104 RFP:N00024-09-R-3185
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0049
CL + PtM (NWCF) (X005 - X008)
| DO NOT TYPE IN ANY COLORED AREAS | Base Year | Option Year I | Option Year II | Option Year III | Option Year IV | Total $ | Total Hours | |||||||||||||||
| CPFF | CLIN | 0005 | CLIN | 1005 | CLIN | 2005 | CLIN | 3005 | CLIN | 4005 | ||||||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | |||||||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | |||||||
| Point Mugu, CA | ||||||||||||||||||||||
| Configuration Manager, Junior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Configuration Manager, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Handling Laborer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Shipping and Receiving Clerk | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Tool and Parts Attendant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| China Lake, CA | ||||||||||||||||||||||
| Drafter I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Management Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| PCB Designer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Supply Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| Overhead | ||||||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Subtotal Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontractors | hrs | $ | hrs | $ | hrs | $ | hrs | $ | hrs | $ | Total $ | |||||||
| Sub: 1: | ||||||||||||||||||
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 1 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 2: | ||||||||||||||||||
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 2 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 3 | ||||||||||||||||||
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 3 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 4: | ||||||||||||||||||
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 4 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 5: | ||||||||||||||||||
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 5 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 6: | ||||||||||||||||||
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 6 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 7 | ||||||||||||||||||
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 7 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 8: | ||||||||||||||||||
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 8 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Total of all Subcontractors | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit - prime | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Total Hours | |||||
| Total Labor and Subcontractor Cost Plus Fee/Profit | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 |
| Other Direct Costs | |||||||||||
| Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | ||||||
| (description) | (description) | (description) | (description) | (description) | (description) | ||||||
| Material (CLINs 0006, 1006, 2006, 3006, and 4006) | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 | $100,000.00 | $ 500,000.00 | |||||
| Travel (CLINs 0007, 1007, 2007, 3007, and 4007) | $50,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $50,000.00 | $ 250,000.00 | |||||
| ODCs (CLINs 0008, 1008, 2008, 3008, and 4008) | $80,000.00 | $80,000.00 | $80,000.00 | $80,000.00 | $80,000.00 | $ 400,000.00 | |||||
| ODC subtotal | $230,000.00 | $230,000.00 | $230,000.00 | $ 230,000.00 | $ 230,000.00 | $ 1,150,000.00 | |||||
| material handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| G&A on ODC | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| Total ODC | $230,000.00 | $ 230,000.00 | $ 230,000.00 | $ 230,000.00 | $ 230,000.00 | $ 1,150,000.00 |
Grand Total Services & ODC $ 230,000.00 $ 230,000.00 $ 230,000.00 $ 230,000.00 $ 230,000.00 $ 1,150,000.00
Attachment_P3_Cost Summary Spreadsheet (insert proposal number) &A
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0049
Combined RDT&E + NWCF
| DO NOT TYPE IN ANY COLORED AREAS | Base Year | Option Year I | Option Year II | Option Year III | Option Year IV | Total $ | Total Hours | |||||||||||||||
| CPFF | CLIN | 0001, 0005 | CLIN | 1001, 1005 | CLIN | 2001, 2005 | CLIN | 3001, 3005 | CLIN | 4001, 4005 | ||||||||||||
| Services | Contractor | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | hrs | subtotal | |||||||||||
| Government Labor Category | Proposed Category | site | sub | f/p | Employee Name | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | Rate | Labor | |||||||
| Patuxent River, MD | ||||||||||||||||||||||
| Acquisition Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Administrative Assistant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Aircraft Welder | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer Support Technician | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Computer System Analyst III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Configuration Manager | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Drafter I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Instrumentation | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Junior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Structural | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Facility Support Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Maintenance Worker | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Graphic Designer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Hangar Manager | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| IA Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| IA Specialist, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Laborer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Machinist Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Management Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Mechanical Drafter IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Program Manager, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Documentation Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Safety Specialist | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Structures Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Supply Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| System Administrator II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| System Administrator III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Tool and Parts Attendant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech V | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Instrumentation Tech IV - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Sheet Metal Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Wiring Tech III - Overtime | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Total Patuxent River, MD (CLIN X001) | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||||||
| Point Mugu, CA | ||||||||||||||||||||||
| Configuration Manager, Junior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Configuration Manager, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electrical Drafter IV | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Handling Laborer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Secretary I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Shipping and Receiving Clerk | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Technical Writer III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Tool and Parts Attendant | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| China Lake, CA | ||||||||||||||||||||||
| Drafter I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Electronics Tech III | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Engineer, Senior | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Clerk I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech I | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| General Tech II | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Management Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Material Coordinator | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| PCB Designer | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Project Analyst | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Supply Tech | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |||||
| Total Point Mugu and China Lake (CLIN X005) | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||||||
| subtotal | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||||||
| fringe fulltime | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| fringe part time | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| Overhead | ||||||||||||||||||||||
| Contractor site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Client site | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||
| G&A | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| COM | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | 0.00% | $ - 0 | $ - 0 | $ - 0 | ||||||
| Subtotal Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontractors | hrs | $ | hrs | $ | hrs | $ | hrs | $ | hrs | $ | Total $ | |||||||
| Sub: 1: | ||||||||||||||||||
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 1 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 1 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 2: | ||||||||||||||||||
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 2 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 2 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 3 | ||||||||||||||||||
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 3 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 3 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 4: | ||||||||||||||||||
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 4 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 4 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 5: | ||||||||||||||||||
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 5 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 5 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 6: | ||||||||||||||||||
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 6 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 6 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 7 | ||||||||||||||||||
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 7 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 7 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Sub: 8: | ||||||||||||||||||
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| 8 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | |
| sub total on Sub 8 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| Total of all Subcontractors | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 0 | ||||||
| subcontractor handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 | |||||||
| subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit - prime | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| prime's fee/profit on subcontractor | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 | $ - 0 | $ - 0 |
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| Fee/Profit Pool | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | Total Hours | |||||
| Total Labor and Subcontractor Cost Plus Fee/Profit | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | -0 | $ - 0 | $ - 0 | -0 |
| Other Direct Costs | |||||||||||
| Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | Subtotal | ||||||
| (description) | (description) | (description) | (description) | (description) | (description) | ||||||
| Material (CLINs 0002, 0006, 1002, 1006, 2002, 2006, 3002, 3006, 4002 and 4006) | $2,500,000.00 | $2,500,000.00 | $2,500,000.00 | $2,500,000.00 | $2,500,000.00 | $ 12,500,000.00 | |||||
| Travel (CLINs 0003, 0007, 1003, 1007, 2003, 2007, 3003, 3007, 4003 and 4007) | $450,000.00 | $450,000.00 | $450,000.00 | $450,000.00 | $450,000.00 | $ 2,250,000.00 | |||||
| ODCs (CLINs 0004, 0008, 1004, 1008, 2004, 2008, 3004, 3008, 4004 and 4008) | $380,000.00 | $380,000.00 | $380,000.00 | $380,000.00 | $380,000.00 | $ 1,900,000.00 | |||||
| ODC subtotal | $3,330,000.00 | $3,330,000.00 | $3,330,000.00 | $ 3,330,000.00 | $ 3,330,000.00 | $ 16,650,000.00 | |||||
| material handling | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| G&A on ODC | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | $ - 0 |
| Total ODC | $3,330,000.00 | $ 3,330,000.00 | $ 3,330,000.00 | $ 3,330,000.00 | $ 3,330,000.00 | $ 16,650,000.00 |
Grand Total Services & ODC $ 3,330,000.00 $ 3,330,000.00 $ 3,330,000.00 $ 3,330,000.00 $ 3,330,000.00 $ 16,650,000.00
Attachment_P3_Cost Summary Spreadsheet (insert proposal number) &A
KTR:(insert name) Source Selection Information See: FAR 2.101 & 3.104 RFP:N00421-17-R-0049
Burdened CPFF Labor Rates
| Offeror Name | Proposed Labor Category | ||
| (Furnished by Government) | Individual Designator* | Proposed Annual Fully-Burdened Labor per Labor Category, per Individual Designator |
(CLIN 0001 / CPFF)
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | |
| Patuxent River, MD | |||||
| Acquisition Specialist | |||||
| Administrative Assistant | |||||
| Aircraft Welder | |||||
| Computer Support Technician | |||||
| Computer System Analyst I | |||||
| Computer System Analyst II | |||||
| Computer System Analyst III | |||||
| Configuration Manager | |||||
| Drafter I | |||||
| Electrical Drafter II | |||||
| Electrical Drafter III | |||||
| Engineer | |||||
| Engineer, Instrumentation | |||||
| Engineer, Junior | |||||
| Engineer, Senior | |||||
| Engineer, Structural | |||||
| Facility Support Technician III | |||||
| General Clerk I | |||||
| General Clerk II | |||||
| General Maintenance Worker | |||||
| General Tech I | |||||
| General Tech II | |||||
| Graphic Designer | |||||
| Hangar Manager | |||||
| IA Specialist | |||||
| IA Specialist, Senior | |||||
| Instrumentation Tech III | |||||
| Instrumentation Tech IV | |||||
| Instrumentation Tech V | |||||
| Laborer | |||||
| Machinist III | |||||
| Machinist IV | |||||
| Machninist Tech V | |||||
| Management Analyst | |||||
| Material Coordinator | |||||
| Mechanical Drafter II | |||||
| Mechanical Drafter III | |||||
| Mechanical Drafter IV | |||||
| Program Manager, Senior | |||||
| Project Analyst | |||||
| Project Documentation Tech | |||||
| Safety Specialist | |||||
| Secretary I | |||||
| Secretary II | |||||
| Secretary III | |||||
| Sheet Metal Tech III | |||||
| Sheet Metal Tech IV | |||||
| Sheet Metal Tech V | |||||
| Structures Tech III | |||||
| Structures Tech IV | |||||
| Structures Tech V | |||||
| Supply Tech | |||||
| System Administrator II | |||||
| System Administrator III | |||||
| Technical Writer I | |||||
| Technical Writer II | |||||
| Technical Writer III | |||||
| Tool and Parts Attendant | |||||
| Wiring Tech III | |||||
| Wiring Tech IV | |||||
| Wiring Tech V | |||||
| General Tech II - Overtime | |||||
| Instrumentation Tech III - Overtime | |||||
| Instrumentation Tech IV - Overtime | |||||
| Sheet Metal Tech III - Overtime | |||||
| Wiring Tech III - Overtime | |||||
| Point Mugu, CA | |||||
| Configuration Manager, Junior | |||||
| Configuration Manager, Senior | |||||
| Electrical Drafter IV | |||||
| Electronics Tech II | |||||
| Electronics Tech III | |||||
| Engineer, Senior | |||||
| General Clerk I | |||||
| Material Coordinator | |||||
| Material Handling Laborer | |||||
| Project Analyst | |||||
| Secretary I | |||||
| Shipping and Receiving Clerk | |||||
| Technical Writer II | |||||
| Technical Writer III | |||||
| Tool and Parts Attendant | |||||
| China Lake, CA | |||||
| Drafter I | |||||
| Electronics Tech I | |||||
| Electronics Tech II | |||||
| Electronics Tech III | |||||
| Engineer, Senior | |||||
| General Clerk I | |||||
| General Clerk II | |||||
| General Clerk III | |||||
| Management Analyst | |||||
| Material Coordinator | |||||
| PCB Designer | |||||
| Project Analyst | |||||
| Supply Tech |
CLIN Summary
| CLIN Summary Sheet | ||||||
| Total Fixed Fee | Handling/G&A | |||||
| CLINS | CLIN Description | Total Hours | Total Cost / Price | (applies to Labor CLINs) | (applies to Material, Travel and ODCs) | Total CLIN Value $ |
| 0001 | Pax Labor (Base Year) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 1001 | Pax Labor (OYI) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 2001 | Pax Labor (OY2) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 3001 | Pax Labor (OY3) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 4001 | Pax Labor (OY4) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 0005 | CL and PtM Labor (Base Year) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 1005 | CL and PtM Labor (OY1) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 2005 | CL and PtM Labor (OY2) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 3005 | CL and PtM Labor (OY3) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| 4005 | CL and PtM Labor (OY4) | 0 | $ - 0 | $ - 0 | N/A | $ - 0 |
| Total Labor | $ - 0 | $ - 0 | N/A | $ - 0 |
| 0002 | Pax Material (Base Year) | N/A | $ 2,400,000.00 | N/A | $ - 0 | $ 2,400,000.00 |
| 1002 | Pax Material (OY1) | N/A | $ 2,400,000.00 | N/A | $ - 0 | $ 2,400,000.00 |
| 2002 | Pax Material (OY2) | N/A | $ 2,400,000.00 | N/A | $ - 0 | $ 2,400,000.00 |
| 3002 | Pax Material (OY3) | N/A | $ 2,400,000.00 | N/A | $ - 0 | $ 2,400,000.00 |
| 4002 | Pax Material (OY4) | N/A | $ 2,400,000.00 | N/A | $ - 0 | $ 2,400,000.00 |
| 0006 | CL and PtM Material (Base Year) | N/A | $ 100,000.00 | N/A | $ - 0 | $ 100,000.00 |
| 1006 | CL and PtM Material (OY1) | N/A | $ 100,000.00 | N/A | $ - 0 | $ 100,000.00 |
| 2006 | CL and PtM Material (OY2) | N/A | $ 100,000.00 | N/A | $ - 0 | $ 100,000.00 |
| 3006 | CL and PtM Material (OY3) | N/A | $ 100,000.00 | N/A | $ - 0 | $ 100,000.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.