Attachment_8_Section L Table 1 and Table 2 - Amendment 1.pdf
PDF 610 KB Posted
- Solicitation number
- N0017426R1021
About this file
This is a labor category and cost estimate document for a federal contract opportunity involving decontamination and ordnance-related services. The contract covers a base period and four option periods, each with identical labor hour allocations totaling 48,960 hours per period (equivalent to approximately 25.5 full-time equivalent staff based on a 1,920-hour work year).
The labor structure includes 20 distinct job categories spanning management, engineering, ordnance specialist, decontamination, quality assurance, and scientific roles. Nine positions are designated as Key Personnel, including the Program Manager, Lead Project Manager, Lead Decontamination Supervisor, Lead Ordnance Specialist, Quality Assurance/Safety Specialist, and four engineering/technical leadership roles. The highest resource allocations are for Lead Ordnance Specialist (5,760 hours), Lead Engineering/Explosive Technician (3,840 hours), Ordnance Specialist (3,840 hours), Engineering/Explosive Technician DECON (5,760 hours), and Lead Decontamination Supervisor (3,840 hours). Other Direct Costs include Travel (not-to-exceed) and Supplies/Materials (not-to-exceed), with the Base Period budgeted at $834,580 and increasing annually through Option Period 4. The five-year total program cost (base plus four option periods) is estimated at $4,393,108, with ODCs totaling $4,393,108 across all periods.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
Labor Categories and Estimated Labor Hours
Labor Categories Base
Period Option
Period 1 Option
Period 2 Option
Period 3 Option
Period 4
Program Manager - (K) 1920 1920 1920 1920 1920
Lead Project Manager - (K) 1920 1920 1920 1920 1920
Lead Decontamination Supervisor - (K) 3840 3840 3840 3840 3840
Lead Ordnance Specialist -
(K) 1920 1920 1920 1920 1920
Quality Assurance/Safety Specialist - (K) 1920 1920 1920 1920 1920
Lead Senior Engineer - (K) 1920 1920 1920 1920 1920
Lead Engineer - (K) 1920 1920 1920 1920 1920
Lead Engineering/ Explosive Technician (K) 1920 1920 1920 1920 1920
Project Manager 1920 1920 1920 1920 1920
Lead Project Manager 1920 1920 1920 1920 1920
Lead Ordnance Specialist 5760 5760 5760 5760 5760
Lead Engineering/ Explosive Technician 3840 3840 3840 3840 3840
Ordnance Specialist 3840 3840 3840 3840 3840
Senior Engineer 1920 1920 1920 1920 1920
Engineer 1920 1920 1920 1920 1920
Engineering/Explosive Technician (DECON) 5760 5760 5760 5760 5760
Lead Scientist 960 960 960 960 960
Scientist 1920 1920 1920 1920 1920
Technical Writer 1920 1920 1920 1920 1920
Totals 48,960 48,960 48,960 48,960 48,960
Note: Work year is based upon 1,920 hours
(K) denotes Key Personnel labor Category
TABLE 2
Other Direct Costs
ODCs Base Period
OpƟon Period 1
OpƟon Period 2
OpƟon Period 3
OpƟon Period 4
Total
Travel (Not-to-exceed)
$359,580 $366,772 $374,107 $381,589 $389,221 $1,871,269
Supplies/Materials (Not-to-exceed)
$475,000 $489,250 $503,928 $519,045 $534,617 $2,521,840
Totals $834,580 $856,022 $878,035 $900,635 $923,838 $4,393,108