Attachment_5_Cost_Proposal_Spreadsheet.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Decontamination, Demilitarization and Demolition Technical and Operational Support
Solicitation number
N0017426R1021
Issued by

About this file

This is a cost proposal spreadsheet template for Solicitation No. N0017426R0121, designed for use under the SeaPort-e IDIQ contract vehicle. The spreadsheet is structured to capture detailed pricing information across a base period and four option years, with separate sections for prime contractor and subcontractor labor costs, indirect costs, other direct costs (ODCs), and fee calculations.

The template requires offerors to provide labor cost details by company labor category and eCRAFT labor category, including hours, rates, and extended amounts for each contract period. Prime contractor costs include direct labor, overhead, fringe benefits, and G&A, while subcontractor costs are tracked separately with pass-through analysis. The spreadsheet enforces compliance with SeaPort-e IDIQ constraints, including a maximum pass-through allowance of 8 percent and a maximum fixed fee calculation for labor performed by the prime contractor. Additional sections accommodate fixed fees, other direct costs with potential G&A adders, and comprehensive fee analysis. The template includes a compatibility report noting that label information requires Excel 2007 or later versions to preserve full functionality.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Spreadsheet

SOLICITATION NO. N0017426R0121 - ATTACHMENT 5
COST PROPOSAL SPREADSHEEET
Prime Offeror Name:
Subcontractor Name (if applicable):
DCAA Point of Contact Information:
Total for All YearsBase PeriodOption Year 1Option Year 2Option Year 3Option Year 4
Cost ElementsCompany Labor CategoryeCRAFT Labor CategoryHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmountRateHoursAmount
Prime Contractor Labor Cost
Prime Contractor Direct Labor
Employee Name 1
Employee Name 2
Etc.
Total Direct Labor Cost
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
G&A
Total Indirect Labor Cost
Total Direct and Indirect Labor cost
COM
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor proposed cost and fee
Subcontractor 1
Subcontractor 2
Etc.
Total proposed subcontractor labor cost and fee
Prime contractor pass through (not including fee)
Handling
G&A
Other (if any)
Total pass through (not including fee)
Total Subcontractor Cost including pass through

Total Labor Cost (Prime and Subcontractor Labor)

Fixed Fee
Prime Contractor Fee for Prime Contractor Labor
Prime Contractor Fee for Subcontractor Labor *
Total Fee (for Prime and Subcontractor Labor)

Total Labor Cost Plus Fixed Fee (CPFF)

Other Direct Costs
Other Direct Costs (ODCs)
Any adders to ODCs such as G&A (cost only - no fee)
Total ODCs

Total CPFF all CLINs (Labor and ODCs)

Pass Through Analysis - Total for All YearsAmountPercent
Subcontractor proposed cost and fee
Pass Through Amount (not including fee)
Prime Contractor Fee for Subcontractor Labor *
Total Pass Through Amount (including fee)ERROR:#DIV/0!
Maximum Pass Through Allowed by SeaPort-e IDIQ Contract8.00%
Fee Analysis - Total for All YearsAmountPercent
Prime Contractor Labor Cost
Fixed Fee for Labor Performed by Prime ContractorERROR:#DIV/0!
Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract
* When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.

Sheet1

Compatibility Report for Attachment_5_Cost_Proposal_Spreadsheet.xlsx
Run on 8/13/2026 13:26

If the workbook is saved in an earlier file format or opened in an earlier version of Microsoft Excel, the listed features will not be available.

Significant loss of functionality # of occurrences Version

This workbook has label information that will be lost or not visible if the file is saved as an earlier Excel format.1Excel 97-2003
Excel 2007
Excel 2010
Excel 2013
Excel 2016
Excel 2019

File details come from the government source that posted it. Updated .