Attachment 4 - Sample 3_Rev A.pdf

PDF 79 KB Posted

Attached to
Propulsor Demonstration Hardware
Solicitation number
N0016720R0009
Issued by

About this file

This document contains a request for proposal for the procurement of propulsor demonstration hardware. The Naval Surface Warfare Center Carderock Division is seeking proposals for a cost plus fixed fee completion contract over five years to manufacture and deliver one machined and balanced Zero Thrust Propulsor in accordance with the specifications in Drawing 8541632 Rev B. Offerors must propose a period of performance and schedule to develop the propulsor along with project management, engineering support, material procurement, inspections, packaging, and delivery to NSWCCD by the completion date. Reviews of the manufacturing plan and periodic progress are required. The winning contractor will also provide certification documentation and inspection records prior to government acceptance of the delivered hardware. Proposals are due under Solicitation N0016720R0009.

View the file

Other files

File Type Posted
N0016720R0009 0004.pdf PDF
Attachment 7 - Past Performance Reference (Rev 1).docx DOCX document
S9245-A4-TSM-010_REV00 30_DEC_2018-Part(2).pdf PDF
N0016720R0009 Amendment 2 Final.pdf PDF
Attachment 13 - Questions and Answers 20R0009 Round 2.pdf PDF
Attachment 14 - Questions and Answers 20R0009 Round 3.pdf PDF
N0016720R0009 0001.pdf PDF
Attachment 12 - Questions and Answers 20R0009 Final.pdf PDF
CDRL A013_Meeting Minutes.pdf PDF
CDRL A001_TDP-Worksheet.pdf PDF
Attachment 2 -Sample 1_Requirement.pdf PDF
Attachment 10 - QASP.pdf PDF
CDRL A003_Test Plan_S.pdf PDF
Attachment 6 - Sub Plan Coversheet 19R0009.docx DOCX document
Attachment 9 - DD254.pdf PDF
Attachment 3 - Sample 2_Requirement.pdf PDF
CDRL A004_MSR_S.pdf PDF
N0016720R0009 Final.pdf PDF
CDRL A005_Engr Change Proposal_S.pdf PDF
CDRL A006_TestInspecton Report_S.pdf PDF
CDRL A002_Technical Report_S.pdf PDF
CDRL A011_Program Review Agenda Revised.pdf PDF
Responses to Synopsis Questions.pdf PDF
Attachment 1 DO1_Requirement.pdf PDF
CDRL A001_TDP_S.pdf PDF
Attachment 11 - GFP Template.xlsx XLSX spreadsheet
CDRL A008_Quality Status Report_R.pdf PDF
CDRL A007_Material Certification_S.pdf PDF
Attachment 4 - Sample 3_Requirements.pdf PDF
CDRL A012_Program Review Docs.pdf PDF
Attachment 8 - Past Performance Questionnaire.docx DOCX document
CDRL A010_Project Planning Chart.pdf PDF
Attachment 5 - Key Personnel Qualifications.pdf PDF
CDRL A014_GFP Inventory Revised.pdf PDF
CDRL A009_MER_S.pdf PDF
Attachment 7 - Past Performance Reference.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 - Sample Task 3 Requirements for Zero Thrust Propulsor (ZTP2)

References:

(a) ZTP2 Drawing, 8541632 Rev B

(b) S9245-A5-TRS-010

Statement of Work:

Manufacturing/Balancing: The contractor shall manufacture and balance one ZTP2 in accordance with drawing reference (a).

Project Management: The contractor shall provide project management and engineering services to develop project schedules and budgets, and maintain them over the course of the Period of Performance proposed by the offeror. The contractor shall support project review with the Government as defined below, and provide meeting minutes and action items within three business days of each review.

Material Procurement: The contractor shall procure the material necessary to manufacture the Zero Thrust Propulsor (ZTP2) in accordance with reference (a). Fasteners shall be procured according the requirements of reference (a).

Inspection: In-process and final dimensional inspections and non-destructive testing shall be performed in accordance with reference (a).

Packaging/Delivery: The finished part shall be packaged for shipping according to the requirements of (a). Loose items shall be labeled and packed per reference (a). The shipping container shall include a complete list of all container contents. The contractor shall ship the completed ZTP2 to NSWCCD, 9500 MacArthur Blvd, West Bethesda, MD, 20817.

Deliverables:

a) One machined and balanced ZTP2 in accordance with reference (a) and within the proposed period of performance.

b) The material certification, inspection, and balancing requirements are identified on the drawings, references (a). Advance copy of certification package shall be provided to the government 10 days prior to government acceptance of the hardware (CDRL A007).

Reviews:

A review meeting shall be held at the manufacturer’s site at the start of ZTP2 manufacturing. The meeting shall address the complete manufacturing plan and schedule.

A follow-on review meeting shall be held approximately every three months, and as necessary to support emerging issues.

File details come from the government source that posted it. Updated .