Attachment_5_-_Previous_Contracting_Effort_Narrative.doc
DOC document 47 KB Posted
- Solicitation number
- N0016719R0020
About this file
Section J - Attachment 5 - Previous Contracting Effort Narrative
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0016719R0020_0003_Modification_Copy.pdf | ||
| Solicitation_Questions_8-20-19_Approved.docx | DOCX document | |
| Solicitation_Questions_8-13-19.docx | DOCX document | |
| Attachment_2_-DD254.pdf | ||
| N0016719R0020_0001_-7-25-2019_Modification_Copy.pdf | ||
| Exhibit_-_CDRL.zipx | ZIPX file | |
| Questions_on_Solicitation_N0016719R0020_7-25-19.docx | DOCX document | |
| N0016719R0020-0001-7-25-2019.pdf | ||
| N0016719R0020_Solicitation.pdf | ||
| Attachment_1_-GFP_-_Part_2_of_2.xlsx | XLSX spreadsheet | |
| Attachment_2_-DD254.pdf | ||
| Attachment_4_-_Past_Performance_Questionnaire.doc | DOC document | |
| Attachment_1_-GFP_-_Part_1_of_2.xlsx | XLSX spreadsheet | |
| Exhibit_A_-_CDRLS_D001_-_F002_-_Part_2_of_2.pdf | ||
| Exhibit_A_-_CDRLS_A001_-_C001_-_Part_1_of_2.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP# N00167-19-R-0020
N00167-19-R-0020
Attachment 5 Previous Contracting Efforts
Past Performance Data (Complete the blocks in this form for each contracting effort as identified under Section L, Section 4.X.X of this solicitation)
Performing Contractor/Division:
DUNS Number/CAGE Code:
Customer/Program Name:
Contract Number/Task Order Number:
Period of Performance:
Customer Points of Contact (POCs) (Provide the name, address, telephone number, and e-mail address for one of the POCs identified below. More than one is permitted, but only one is required.)
Program Manager (PM):
Contracting Officer (KO):
Administrative Contracting Officer (ACO):
Contracting Officer’s Technical Representative (COTR) or Contracting Officer’s Representative (COR):
Task Monitor:
Contract Information
Contract Type: Fixed-Price; Labor Hour or Time-and-Materials; Cost-Reimbursement (CPFF, CPAF, CPIF, etc.)
| If the contract/task order has been completed, provide the program cost/price: |
| Dollar Amount at Award: |
Dollar Amount at Completion:
If the contract has not been completed:
(Do not include unexercised options) Current Cost/Price:
Current Estimate to Complete:
List of key subcontracts and the estimated portion and description of work performed by or as subcontractors:
List of proposed key personnel who worked on this contract/task order, if any (identify role/responsibility on past effort and on current proposed effort):
Using the space below, provide the following narrative information:
· Describe how the Past Performance Reference is relevant to the requirement being solicited.
· Describe the work products and/or services delivered to the customer under this past contract/task order.
· Describe the relevance of the past contract/task order in comparison to the requirements described in the Solicitation, with respect to scope, period of performance, and complexity (e.g. task, dollar value, contract type, labor mix). Describe the extent to which it addresses the task areas of this solicitation (e.g. radiation detection, air sampling, engineering, configuration management, quality).
· Describe the extent to which the radiation detection and air sampling products produced under the past contract/task order were reviewed by, or reconciled with, government agencies and/or technical warrant holders.
· Describe significant achievements, challenges, or obstacles that were encountered during contract/task order performance and the measures taken to overcome them.
· Provide performance criteria/measures that were applied in evaluating performance, for the contract/task order identified. The performance criteria/measures should be specific and show the target performance levels that are/were set forth under the contract/task order as well as the level of performance achieved, for the most recent period of performance of the contract/task order. Describe the tools and/or methods used to collect metrics data and the frequency of data collection and reporting.
SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104
File details come from the government source that posted it.