Question_Set_4.docx

DOCX document 16 KB Posted

Attached to
Pre-Prototype Propulsors
Solicitation number
N00167-16-R-0014
Issued by

View the file

Other files

File Type Posted
SPEC_EB-4941.pdf PDF
N00167-16-R-0014-0002.docx DOCX document
Question_Set_3.docx DOCX document
Question_Set_2.docx DOCX document
N00167-16-R-0014-0001.docx DOCX document
Question_Set_1.docx DOCX document
Attachment_6_DD_254.pdf PDF
N00167-16-R-0014.doc.docx DOCX document
CDRL_A002_TDP.pdf PDF
TDP_PRE_-_PROTOTYPE_PROPULSORS.pdf PDF
CDRLs_A009_Property_Report_A010_ATR.pdf PDF
CDRLs_A003_TestPlan_A004_ConfAgenda.pdf PDF
Attachment_2_Sample_Delivery_Order__2.pdf PDF
Attachment_3_Cost_Summary_Format.xls XLS spreadsheet
Attachment_4_Labor_Rate_Substantiation_Table.xls XLS spreadsheet
CDRLs_A005_Proj_Plan_Chart_A006_Mtg_Mins.pdf PDF
CDRLs_A007_ECP_A008_NOR.pdf PDF
Attachment_1_Sample_Delivery_Order__1.pdf PDF
CDRL_A001_Progress _Status_and_Management_Report.pdf PDF
Attachment_5_Historical_Government_Material_Requirements.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00167-16-R-0014 Question Set 4

1) Could you please provide guidance on where to locate "Qualification of Glass Reinforced Plastic Composite Material Systems" SPEC EB-4941, I have been unable to locate it online.

A) SPEC EB-4941 has been added to the attachments of this solicitation.

2) Could you please provide guidance on how to locate the technical information on material properties, application process, required qualifications for vendor application, and material supplier for Delivery Order 1, Item 9, Hydro shaping Material (HYSHMA), Pour-in-place Compound (Part# NSWCCD Formula G-071) as it appears to be a NSWCCD developed material that is not a COTS product.

A) Sample Delivery Order 1, LSV AOS, Section 4.3 states: "Reference (b) item 9 installation and machining and item 5 installation are outside the scope of this effort." Therefore, there is no need to provide the technical information for Delivery Order 1, Item 9 since it is not needed to fulfill the requirements of the sample delivery order in the RFP.

3) Facilities Requirements: Must the prime’s subcontractors maintain a Defense Security Service (DSS) approved security system for the manufacture of non-classified parts?

A) If the subcontractor is only performing work on non-classified parts, and is performing work in a separate location than where the classified work is being performed, no approved security system is needed.

4) Security Requirements: Will the government accept Interim Secret security clearances for Key Personnel?

A) Yes the Government will accept an Interim Secret security clearance for a key personnel if the interim clearance was granted after 01 Aug 2016. If it was granted prior to 01 Aug 2016 the contractor will need to provide verification from both the FBI and local Police of the fingerprint check.