Attachment_2_Sample_Delivery_Order__2.pdf
PDF 226 KB Posted
- Attached to
- Pre-Prototype Propulsors
- Solicitation number
- N00167-16-R-0014
About this file
Statement of Work for Sample Delivery Order 2. All parties interested in responding to this RFP should contact Jonathan Mauro via email at jonathan.mauro navy.mil with their company name and CAGE code requesting the Attachments associated with this Sample.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_Set_4.docx | DOCX document | |
| SPEC_EB-4941.pdf | ||
| N00167-16-R-0014-0002.docx | DOCX document | |
| Question_Set_3.docx | DOCX document | |
| Question_Set_2.docx | DOCX document | |
| N00167-16-R-0014-0001.docx | DOCX document | |
| Question_Set_1.docx | DOCX document | |
| Attachment_6_DD_254.pdf | ||
| N00167-16-R-0014.doc.docx | DOCX document | |
| CDRL_A002_TDP.pdf | ||
| TDP_PRE_-_PROTOTYPE_PROPULSORS.pdf | ||
| CDRLs_A009_Property_Report_A010_ATR.pdf | ||
| CDRLs_A003_TestPlan_A004_ConfAgenda.pdf | ||
| CDRLs_A005_Proj_Plan_Chart_A006_Mtg_Mins.pdf | ||
| Attachment_3_Cost_Summary_Format.xls | XLS spreadsheet | |
| Attachment_4_Labor_Rate_Substantiation_Table.xls | XLS spreadsheet | |
| CDRLs_A007_ECP_A008_NOR.pdf | ||
| Attachment_1_Sample_Delivery_Order__1.pdf | ||
| CDRL_A001_Progress _Status_and_Management_Report.pdf | ||
| Attachment_5_Historical_Government_Material_Requirements.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # N00167-16-R-0014
Delivery Order 0002
Yard Patrol Propeller
SECTION 1.0 – Title
Yard Patrol Propeller
SECTION 2.0 - OBJECTIVES
Manufacture a Prototype Propeller per Government Furnished Information (GFI) provided drawing and then package and deliver hardware to the Naval Surface Warfare Center – Carderock (NSWCCD) West Bethesda, MD
SECTION 3.0 – AREA SPECIFIED IN THE BASIC CONTRACT
The work in this Delivery Order (DO) is covered under SOW Section C under the following paragraph headings.
SECTION 4.0 - STATEMENT OF WORK
4.1 General and Facility Requirements
The contractor shall furnish all labor, facilities and materials necessary to manufacture the pre-prototype propeller in accordance with the GFI drawing (a).
4.2 Delivery Requirements
Validation Reports: The contractor shall produce and deliver a Certification Package report validating that the manufactured products comply with the requirements identified on the GFI drawing (CDRL A010).
Advance copy of Certification Package shall be provided to the Government 10 days prior to Government acceptance of the hardware. Final Certification package (material certs, Non-destructive Testing inspection reports, balance report, dimensional inspection, and any other information required per GFI drawing (a)) shall be delivered with the hardware.
4.3 Rough and Final Machining.
Manufacturing/Balancing: Manufacture and balance one pre-prototype propeller in accordance with GFI drawing (a).
4.4 Assembly
Material Procurement: Procure the casting necessary to manufacture the pre-prototype propeller in accordance with GFI drawing.
4.5 Contractor Management and Quality Control
Start Up Meeting. The contractor shall provide meetings at manufacturing facilities at the start of the pre-prototype manufacturing. The meeting shall address the complete manufacturing plan and schedule.
The contractor shall provide agendas and meeting minutes. (CDRLs A004, A005, and A006).
Follow On Meeting. A review meeting shall be held approximately half way thru the schedule, and as necessary to support emerging issues. The contractor shall provide agendas and meeting minutes. (CDRLs
A004, A005, and A006).
4.8 Logistics
Packaging/Delivery: Assembly protective packaging and shipping container requirements are identified in
GFI drawing (a). Package and label all loose items per GFI drawing (a). Include complete list of all container contents in the shipping container. Ship the completed pre-prototype propeller to NSWCCD West Bethesda, MD.
4.9 GOVERNMENT FURNISHED INFORMATION
(a) Prototype Propeller Drawing and embedded electronic model, drawing PM16003
4.10 CONTRACTOR ACQUIRED MATERIAL (CAM):
The contactor shall identify items required by the contractor for the performance of this DO to the
Contracting Officer Representative (COR) promptly when the contractor recognizes the requirement and will be addressed on a case by case basis. Any changes in the requirement will be provided via a DO modification issued by the Procuring Contracting Officer.
4.11 Disposition of Materials:
Upon completion of the DO, all material associated with this DO that is purchased by the contractor, billed to the Government, and not depleted during the performance of the DO shall become the property of the Federal
Government. The contractor shall transfer all materials not depleted to the COR, as specified within the individual DOs, by way of a Material Inspection and Receiving Report (DD Form 250) and a DD Form 1149.
Disposition shall follow instructions outlined in Section H, GFP clause.
SECTION 5.0 DELIVERABLES
The contractor shall provide the following deliverables in accordance with SOW/DO requirements above.
CDRL DID Title/Subtitle)
A004 DI-ADMN-81249A Conference Agenda
A005 DI-ADMN-80507C Project Planning Chart
A006 DI-ADMN-81505 Report, Record of Meeting/Minutes
A010 DI-QCIC-81891 Acceptance Test Report (ATR)
SECTION 6.0 – PLACE OF DELIVERY
The deliverables to be provided shall be submitted to:
Naval Surface Warfare Center CARDEROCK Division
9500 MacArthur Boulevard
West Bethesda, MD 20817-5700
Marked for: XXXXX
SECTION 7.0 – DELIVERY
Delivery is required 210 days after award of the DO.
SECTION 8.0 – SECURITY
The work under this delivery order is unclassified.
SECTION 9.0 – GOVERNMENT POINTS OF CONTACT
Subject Matter Expert (SME)
John Doe
Contracting Officer’s Representative (COR)
John Doe
File details come from the government source that posted it. Updated .