Draft_RFP_Att7-Gate_Review_Matrix09JUL2018.pdf

PDF 31 KB Posted

Attached to
PMW 750 C4I Testing, Integration, and Installation Follow-on Federal contract opportunity
Solicitation number
N00039-17-R-0043
Issued by
Department of the Navy Information Warfare Systems Command

About this file

This document contains a gate review matrix for Solicitation Number N00039-17-R-0043 for PMW 750 C4I Testing, Integration, and Installation Follow-on services. The matrix requires offerors to demonstrate over $50 million in relevant past performance across three contracts involving C4I testing, integration and installation work for consideration. Contract references and invoiced amounts from the past five years must be provided for specific sections of the performance work statement. Only task orders awarded under the referenced contracts and with a corresponding experience form will be counted toward the gate review total. The Department of the Navy is the contracting agency, with an estimated contract award date of October 2019 for providing C4I testing, integration and installation services.

View the file

Other files for this federal contract opportunity

Other files attached to PMW 750 C4I Testing, Integration, and Installation Follow-on, newest first.
File Type Posted
Draft_RFP_QA_N00039-17-R-0043_rev1.pdf PDF
Draft_RFP_QA_N00039-17-R-0043.pdf PDF
Draft_RFP_Att10-PEOC4I_POR_and_Non-POR_Systems_09JUL2018.pdf PDF
Draft_RFP_Att12-Past_Perf_Questionnaire_Survey_09JUL2018.pdf PDF
Draft_RFP_Att9-Hull_POR_Summary_09JUL2018.pdf PDF
Section J - List of Attachments-09JUL2018.docx DOCX document
Draft_RFP_Att11-Ship_Avail_Schedule_09JUL2018.pdf PDF
RFP QUESTIONNAIRE FORM.xlsx XLSX spreadsheet
Draft_RFP_Sections_L&M_07112018.pdf PDF
Draft_RFP_Att13-Small_Business_Participation_Data_09JUL2018.pdf PDF
Section B - CLIN Structure-11JUL2018.docx DOCX document
Draft_RFP_Att1-PWS_09JUL2018.pdf PDF
Draft_RFP_Att6-Relevant_Experience_Form_09JUL2018.pdf PDF
Draft_RFP_Att2-CDRLS_09JUL2018.pdf PDF
Draft_RFP_Att4-Labor_Table_09JUL2018.pdf PDF
Draft_RFP_Att7-Gate_Review_Matrix09JUL2018.pdf PDF
Draft_RFP_Att14-Prime_Ctr_and_Subctr_Cost_Sprshts_11JUL2018.xlsx XLSX spreadsheet
Draft_RFP_Att8-Relevant_PEOC4I_POR_and_Systems_09JUL2018.pdf PDF
Draft_RFP_Att5-QASP_09JUL2018.pdf PDF
Draft_RFP_Att13-Small_Business_Participation_Data_09JUL2018.pdf PDF
Draft_RFP_Att10-PEOC4I_POR_and_Non-POR_Systems_09JUL2018.pdf PDF
Draft_RFP_Att1-PWS_09JUL2018.pdf PDF
Draft_RFP_Att12-Past_Perf_Questionnaire_Survey_09JUL2018.pdf PDF
Draft_RFP_Att8-Relevant_PEOC4I_POR_and_Systems_09JUL2018.pdf PDF
Draft_RFP_Att6-Relevant_Experience_Form_09JUL2018.pdf PDF
Draft_RFP_Att5-QASP_09JUL2018.pdf PDF
Draft_RFP_Att4-Labor_Table_09JUL2018.pdf PDF
Section J - List of Attachments-09JUL2018.docx DOCX document
RFP QUESTIONNAIRE FORM.xlsx XLSX spreadsheet
Draft_RFP_Att14-Prime_Ctr_and_Subctr_Cost_Sprshts_11JUL2018.xlsx XLSX spreadsheet
Draft_RFP_Sections_L&M_07112018.pdf PDF
Draft_RFP_Att9-Hull_POR_Summary_09JUL2018.pdf PDF
Draft_RFP_Att11-Ship_Avail_Schedule_09JUL2018.pdf PDF
Section B - CLIN Structure-11JUL2018.docx DOCX document
Draft_RFP_Att2-CDRLS_09JUL2018.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 7 - GATE REVIEW MATRIX

N00039-17-R-0043 Attachment 7 SOURCE SELECTION SENSITIVE - See FAR 3.104 1 of 4

Ref

Invoiced $ from line 8

3.1.1.5 3.1.2.3 3.1.2.5 3.1.2.6 3.1.2.7 3.1.4.1 3.1.4.2 3.1.4.5 3.1.5.2 3.1.5.3 3.1.5.5 3.1.5.7 Invoiced $ 1 Example-13-R-0001 Y X X X X 17,354,678$ 12/14/13-Present 2 Example-12-R-0034 Y X X X X X X X X 33,525,380$ 08/22/13-02/11/18 3 Example-17-R-1006 N X X X 2,334,236$ 11/24/17-05/23/18

Total 53,214,294$

Gate 50,000,000$

Non-IDIQ contracts do not require a tab sheet to be completed.

Offeror is responsible for ensuring any PWS Sections Covered boxes checked, and Invoiced $ and Relevant Performance Period values are transfer from the Ref # TO-DO tabs.

[Prime Offeror Name Here] Relevant

Performance Period (Begin & End Dates)

MM/DD/YY

IDIQ

(Y/N)

Contract Reference Number (must match one of the Att. 6 References)

Any contract listed in the Gate Review Matrix without a corresponding Attachment 6 "Relevant Experience Form" will not be included in the total for meeting the Gate requirement.

PWS Sections Covered

Attachment 7 SOURCE SELECTION SENSITIVE - See FAR 3.104 2 of 4

Invoiced $ from line 8

3.1.1.5 3.1.2.3 3.1.2.5 3.1.2.6 3.1.2.7 3.1.4.1 3.1.4.2 3.1.4.5 3.1.5.2 3.1.5.3 3.1.5.5 3.1.5.7 Invoiced $ Example-13-R-0001 0001 X X X X 2,354,678$ 12/14/13-9/30/14 Example-13-R-0001 0002 X X X X X X X X 6,253,652$ Example-13-R-0001 0005 X X X X X 4,927,613$ Example-13-R-0001 0006 X X X X 3,818,135$

Total* 17,354,078$

Any TO/DO(s) listed on this tab that do(es) not correspond to referenced Contract #1 on "3 Contracts" tab will not be included in the total for meeting the Gate requirement.

Additional rows may be inserted to include additional relevant TO/DOs awarded under referenced IDIQ contract.

* Offeror is responsible for ensuring Total value reflects accurate summation of listed TO/DO Invoiced values.

[Prime Offeror Name Here]

Contract Reference Number 1 (Task Order listing)

TO/DO #

(as applicable)

Relevant Performance Period (Begin & End Dates)

MM/DD/YY

PWS Section

Attachment 7 SOURCE SELECTION SENSITIVE - See FAR 3.104 3 of 4

Invoiced $ from line 8

3.1.1.5 3.1.2.3 3.1.2.5 3.1.2.6 3.1.2.7 3.1.4.1 3.1.4.2 3.1.4.5 3.1.5.2 3.1.5.3 3.1.5.5 3.1.5.7 Invoiced $ Example-12-R-0034 0002 X X X X X X X 8,354,678$ 08/22/13-02/11/18 Example-12-R-0034 0003 X X X X X 4,684,285$ 08/22/13-02/11/18 Example-12-R-0034 0004 X X X 2,918,621$ 08/22/13-02/11/18 Example-12-R-0034 0007 X X X X X X 7,916,235$ 08/22/13-02/11/18 Example-12-R-0034 0012 X X X X X X X X X X X 9,651,561$ 08/22/13-02/11/18

Total* 33,525,380$

* Offeror is responsible for ensuring Total value reflects accurate summation of listed TO/DO Invoiced values.

[Prime Offeror Name Here]

Contract Reference Number 2 (Task Order listing)

TO/DO #

(as applicable)

Relevant Performance Period (Begin & End Dates)

MM/DD/YY

Any TO/DO(s) listed on this tab that do(es) not correspond to referenced Contract #1 on "3 Contracts" tab will not be included in the total for meeting the Gate requirement.

Additional rows may be inserted to include additional relevant TO/DOs awarded under referenced IDIQ contract.

Attachment 7 SOURCE SELECTION SENSITIVE - See FAR 3.104 4 of 4

Invoiced $ from line 8

3.1.1.5 3.1.2.3 3.1.2.5 3.1.2.6 3.1.2.7 3.1.4.1 3.1.4.2 3.1.4.5 3.1.5.2 3.1.5.3 3.1.5.5 3.1.5.7 Invoiced $ Ex. N/R

Total* -$

* Offeror is responsible for ensuring Total value reflects accurate summation of listed TO/DO Invoiced values.

[Prime Offeror Name Here]

Contract Reference Number 3 (Task Order listing)

TO/DO #

(as applicable)

Relevant Performance Period (Begin & End Dates)

MM/DD/YY

Any TO/DO(s) listed on this tab that do(es) not correspond to referenced Contract #1 on "3 Contracts" tab will not be included in the total for meeting the Gate requirement.

Additional rows may be inserted to include additional relevant TO/DOs awarded under referenced IDIQ contract.

3 Contracts
Ref 1 TO-DO
Ref 2 TO-DO
Ref 3 TO-DO

File details come from the government source that posted it. Updated .