Draft_RFP_Att11-Ship_Avail_Schedule_09JUL2018.pdf

PDF 67 KB Posted

Attached to
PMW 750 C4I Testing, Integration, and Installation Follow-on Federal contract opportunity
Solicitation number
N00039-17-R-0043
Issued by
Department of the Navy Information Warfare Systems Command

About this file

This attachment provides a ship availability schedule for multiple Navy vessels requiring maintenance and upgrades between fiscal years 2019 through 2030. The schedule outlines planned dates for activities including crew move aboard, government furnished equipment delivery, shipbuilder contract awards, trials, maintenance availabilities, upgrades and deliveries/redeliveries for various aircraft carriers and amphibious assault ships. Specific ships and planned dates are identified for events and activities including early start work, builder trials, carrier incremental availabilities, crew move aboard, delivery, government furnished equipment required in-yard dates, initial post-delivery availabilities, just in time delivery, obligation work limiting dates, post shakedown availabilities, post-delivery availabilities, refueling and complex overhaul start dates and shipbuilder DD&C contract awards. Definitions are also provided for key terms used in the schedule.

The related federal contract opportunity is a pre-solicitation notice for contract number N00039-17-R-0043 seeking offers for C4I testing, integration and installation services for PMW 750. The notice identifies the solicitation number, name, opportunity type and Navy as the issuing agency. An estimated contract award date of October 2019 is provided, with interested parties instructed to monitor FedBizOpps and the SPAWAR E-Commerce Central website for further updates and details regarding the solicitation. Contact information is provided for questions, which are to be submitted in writing only.

View the file

Other files for this federal contract opportunity

Other files attached to PMW 750 C4I Testing, Integration, and Installation Follow-on, newest first.
File Type Posted
Draft_RFP_QA_N00039-17-R-0043_rev1.pdf PDF
Draft_RFP_Att12-Past_Perf_Questionnaire_Survey_09JUL2018.pdf PDF
Draft_RFP_Att9-Hull_POR_Summary_09JUL2018.pdf PDF
Section J - List of Attachments-09JUL2018.docx DOCX document
Draft_RFP_Att11-Ship_Avail_Schedule_09JUL2018.pdf PDF
RFP QUESTIONNAIRE FORM.xlsx XLSX spreadsheet
Draft_RFP_Sections_L&M_07112018.pdf PDF
Draft_RFP_Att13-Small_Business_Participation_Data_09JUL2018.pdf PDF
Draft_RFP_QA_N00039-17-R-0043.pdf PDF
Draft_RFP_Att10-PEOC4I_POR_and_Non-POR_Systems_09JUL2018.pdf PDF
Draft_RFP_Att7-Gate_Review_Matrix09JUL2018.pdf PDF
Draft_RFP_Att14-Prime_Ctr_and_Subctr_Cost_Sprshts_11JUL2018.xlsx XLSX spreadsheet
Draft_RFP_Att8-Relevant_PEOC4I_POR_and_Systems_09JUL2018.pdf PDF
Draft_RFP_Att5-QASP_09JUL2018.pdf PDF
Section B - CLIN Structure-11JUL2018.docx DOCX document
Draft_RFP_Att1-PWS_09JUL2018.pdf PDF
Draft_RFP_Att6-Relevant_Experience_Form_09JUL2018.pdf PDF
Draft_RFP_Att2-CDRLS_09JUL2018.pdf PDF
Draft_RFP_Att4-Labor_Table_09JUL2018.pdf PDF
Draft_RFP_Att6-Relevant_Experience_Form_09JUL2018.pdf PDF
Draft_RFP_Att13-Small_Business_Participation_Data_09JUL2018.pdf PDF
Draft_RFP_Att10-PEOC4I_POR_and_Non-POR_Systems_09JUL2018.pdf PDF
Draft_RFP_Att1-PWS_09JUL2018.pdf PDF
Draft_RFP_Att12-Past_Perf_Questionnaire_Survey_09JUL2018.pdf PDF
Draft_RFP_Att8-Relevant_PEOC4I_POR_and_Systems_09JUL2018.pdf PDF
Section B - CLIN Structure-11JUL2018.docx DOCX document
Draft_RFP_Att2-CDRLS_09JUL2018.pdf PDF
Draft_RFP_Att5-QASP_09JUL2018.pdf PDF
Draft_RFP_Att4-Labor_Table_09JUL2018.pdf PDF
Section J - List of Attachments-09JUL2018.docx DOCX document
Draft_RFP_Att7-Gate_Review_Matrix09JUL2018.pdf PDF
RFP QUESTIONNAIRE FORM.xlsx XLSX spreadsheet
Draft_RFP_Att14-Prime_Ctr_and_Subctr_Cost_Sprshts_11JUL2018.xlsx XLSX spreadsheet
Draft_RFP_Sections_L&M_07112018.pdf PDF
Draft_RFP_Att9-Hull_POR_Summary_09JUL2018.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE

Factor 1.1: Multiple Ship Availability Planning

For illustration purposes only. Schedule does not reflect all work intended on the contract.

N00039-17-R-0043 Attachment 11

CVN

A/80

CVN

B/81

CVN

C/73

CVN

D/74

CVN

E/75

LHA

A/8

LHA

B/9

FY19

CMA

Q1FY27

Shipbuilder DD&C contract Awarded

Q1FY19

FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY29FY27 FY28

GFE RIYD

Aug ‘24

Delivery Sep ‘27

CMA

Q3FY30Shipbuilder DD&C contract Awarded

Q1FY19

GFE RIYD

Feb ‘28

OWLD

Aug ‘28

OWLD

Sep ‘22

Delivery Aug ‘21

JITD

Q4FY19

Delivery Jan ‘25

JITD

Q2FY22

Shipbuilder DD&C contract Awarded

Q4FY19

OWLD

Jan ‘29

Delivery Dec ‘27

JITD

Q4FY24

Shipbuilder DD&C contract Awarded

Q3FY22

PSA

OWLD

Feb ‘26

OWLD

Aug ‘25

CMA/

Delivery Jan ‘24

Shipbuilder DD&C contract Awarded

Feb ‘22

GFE RIYD

May ‘21

Space Turn-over Nov ‘22

BT

Aug ‘23

CMA/

Delivery Jan ‘29

GFE RIYD

May ‘26

Space Turn-over Nov ‘28

BT

Aug ‘28

PDA

Apr ‘24

IPDA

Feb ‘29

PDA

Apr ‘29

IPDA

Mar ‘24

RCOH

Start

Jan ‘21

ESW

Sep ‘20

RCOH

Start

Mar ‘24

ESW

Oct ‘23

ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE

Factor 1.1: Definitions

N00039-17-R-0043 Attachment 11

Definitions

1. Builder Trials (BT): Evaluation trials and inspections conducted underway by the builder to assure the builder and the Navy that the ship is, or will be, ready for Acceptance Trials.

2. Carrier Incremental Availability (CIA): Short availability period prior to or following RCOH.

3. Crew Move Aboard (CMA): Date when SHIPS FORCE Personnel transition onboard to work on the ship. It is critical they can conduct day-to-day operations, so certain C4I systems must be operational to support them.

4. Delivery: Date when the ship is delivered (or re-delivered in case of RCOH) to the Navy. This milestone is preceded by

Builders Trials (BT) and Acceptance Trials (AT).

5. Early Start Work (ESW): Period assigned for prepping for RCOH activities.

6. Government Furnished Equipment (GFE) Required In-Yard Date (RIYD): Date when all GFE must be delivered to ship. For

CVN A & B, these dates are specified in the DD&C contract so the shipbuilder can install for equipment on board.

7. Initial Post-Delivery Availability (IPDA):

8. Just in Time Delivery (JITD): Planned date when GFE is to be delivered to the shipyard.

9. Obligation Work Limiting Date (OWLD): Date when all SCN-funded work must be complete on the ship.

10. Post Shakedown Availability (PSA): For CVN A & B, this availability fixes all Trial Card issues. It is also the window where the CANES LAN Drops are completed (roughly 2,500 Drops).

11. Post-Delivery Availability (PDA): A variable-duration period assigned by the TYCOM for the conduct of selected trials and tests peculiar to the anti-air warfare, strike warfare, amphibious warfare, anti-surface warfare and antisubmarine warfare (ASW) systems.

12. Refueling and Complex Overhaul (RCOH) Start: Contractual start date for RCOH activities.

13. Shipbuilder DD&C contract Awarded: Planned date when NAVSEA (PMS 312, 377, or 379) will award the shipbuilding contract for the construction of the ship.

ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE��Factor 1.1: Multiple Ship Availability Planning
ATTACHMENT 11 – SHIP AVAILABILTY SCHEDULE��Factor 1.1: Definitions

File details come from the government source that posted it. Updated .