This document is an amendment to a Request for Proposals (RFP) issued by the Naval Sea Systems Command (NAVSEA) for the USS BOXER (LHD 4) FY25 Selected Restricted Availability. The purpose of the amendment is to update various attachments, extend the due date for proposals from September 18, 2024 to September 25, 2024, and provide additional instructions to offerors.
The RFP is for a single Firm-Fixed-Price contract to complete maintenance, modernization, and repair work on the USS BOXER. Offerors must submit proposals via the Procurement Integrated Enterprise Environment (PIEE) by the September 25, 2024 deadline. The Government anticipates making an award on or around December 2024, with the availability beginning in April 2025 and completing in August 2026. The RFP provides detailed instructions for proposal format and content, including requirements related to pricing, past performance, manpower, schedule, and small business participation. NAVSEA will evaluate proposals using a best value trade-off source selection process.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0002420FR62083
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0004 is to make the follow ing changes: 1. Update Section J, Attachment J-1 to incorporate Erratas 2-4. 2.
Update Section J Attachments J-3, J-8 and J-10. 3. Extend due date for proposals from 18 Sep 2024 to 25 Sep 2024.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0002425R4425
X 9B. DATED (SEE ITEM 11)
08-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2024
CODE
NAVAL SEA SYSTEMS COMMAND
CONTRACTS (SEA024)
1333 ISAAC HULL AVE, S.E.
WASHINGTON NAVY YARD DC 20376-2020
N00024 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0002425R4425
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
DOCUMENTS/EXHIBITS/ATTACHMENTS
The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:
No. Document
Attachment S-1 RESERVED
Attachment S-2 Past Performance Contractor Performance Assessment Reporting System (CPARS)
References
Attachment S-3 Pre-Proposal Information (PPI) Form
Attachment S-4 Manpower Plan to Actual Data Sheet
Attachment S-5 Eligibility Criteria Data Sheet
Attachment S-6 RESERVED
Attachment S-7 Proposal Assessment
Attachment S-8 Pier and Dry-dock Graphical Representation Template
Attachment S-9 Past Performance Questionnaire (PPQ)
The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:
Attachment J-1 Specification Package TPPC-LHD4-SWRMC25-CN01-( Amendment 4)
Attachment J-2 Work Item Plans, Drawings and Other References (Amendment 3)
Attachment J-3 Execution Milestones and Key Event Dates, as proposed (Amendment 4)
Attachment J-4 Pricing Workbook, as proposed (Amendment 3)
Attachment J-5 Quality Assurance Surveillance Plan
Attachment J-6 Subcontracting Plan, as proposed (to be incorporated upon award)
Attachment J-7 Schedule Model Review
Attachment J-8 Government Furnished Material (GFM) List (Amendment 4)
Attachment J-9 Compartment Closeout List (NSI 009-81) (Amendment 3)
Attachment J-10 Open & Inspect List, as proposed (Amendment 4)
Attachment J-11 Small Business Participation Commitment Document (SBPCD), as proposed
Attachment J-12 NBSD Facilities and Services
Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003, A005-A009, A011, A014, A016-
A017)
(Does not include A004, A0010, A012-A0013, or A015)
Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009
Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
I. INTRODUCTION
A. This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm-Fixed-Price contract to complete the USS BOXER (LHD 4) AVAILABILITY.
B. The Government intends to award a single Fixed-Price contract to the Offeror whose proposal represents the Best Value to the Government, utilizing trade off source selection procedures in accordance with FAR
15.101-1 and Section M of this solicitation.
C. ALL INQUIRIES shall be made in writing and directed to Brian Romano, Contracting Officer, and LT
Jourdan Jenkins, Contract Specialist, at brian.c.romano.civ@us.navy.mil, and jourdan.e.jenkins.mil@us.navy.mil, respectively. To ensure the Government is able to adequately address and respond to Offeror pre-proposal information (PPI) via amendments, it is requested Offerors submit no more than four sets of controlled questions, outlined in the table below, before 11:59 pm, local time, Washington, DC.
Each set of questions shall be submitted together in one attachment via email properly titled, “Contractor
Name - Submission No. X (1, 2, 3, or 4) as of date XX/XX/XXXX.” Solicitation questions should reference the solicitation and/or specification page and paragraph number and be submitted on the Pre-
Proposal Information (PPI) form (Attachment S-3) provided with this solicitation. Proposal due date shall not be extended solely on the basis of more than one request, extensive questioning, or requests received after this date and time.
Controlled Set of Bidders Questions Due Date
Set 1 15 Jul 2024
Set 2 22 Jul 2024
Set 3 29 Jul 2024
Set 4 5 Aug 2024
Set 5 12 Aug 2024
Offerors SHALL NOT submit comments, questions, or inquiries to any Government representative other than the Contracting Officer and Contract Specialist identified herein.
Information contained in the Government’s responses to bidder’s question shall not supersede any information contained in the solicitation (including amendments). In the event of a discrepancy between a response to a bidder’s question and the content of the solicitation, the solicitation shall take precedence.
The Government reserves the right to not answer any more than four sets of PPI requests per contractor, in accordance with the deadlines identified herein.
D. Estimated Award Date: The Government anticipates making an award in or before December 2024.
E. Potential Prime Offeror’s Negative Response: The Government requests a negative response from any potential Prime Offeror who, after reviewing this solicitation, does not intend on submitting a proposal.
Negative response are to be delivered to the Contracting Officer and Contract Specialist listed above NLT seven (7) business dates after solicitation release.
II. INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
A. Proposal Due Date:
1. All copies of proposals (Volumes I & II) shall be received by the Government via PIEE no later than 25 September 2024 at 2:00 PM, local time, Washington DC. Offerors are instructed to submit mailto:brian.c.romano.civ@us.navy.mil mailto:jourdan.e.jenkins.mil@us.navy.mil their proposal electronically via the Procurement Integrated Enterprise Environment (PIEE) application located at https://piee.eb.mil. Late proposals WILL NOT be considered. Partial proposals or attachments WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.
a) Offerors must provide a proposal valid for at least 140 calendar days (12 February 2025) from the proposal due date (25 September 2024). (Complete block 12 of the Standard Form (SF-33).
B. Directions for Electronic Submission of Proposals:
1. Offerors are instructed to submit proposals electronically via the Procurement Integrated Enterprise
Environment (PIEE) located at https://piee.eb.mil/. Offerors are strongly encouraged to submit early and to confirm receipt of the proposal materials with the PCO and Contract Specialist..
2. Offerors wishing to submit a proposal in response to this notification shall ensure a representative of their organization registers at the PIEE website within seven (7) working days of solicitation release, and that the Proposal Manager role in the Solicitation Module is approved for the Offeror’s representative. A vendor registration guide for obtaining access to the PIEE Solicitation Module is posted to the Defense Pricing and Contracting website at: https://dodprocurementtoolbox.com/site-pages/solicitation-module.
3. Proposals sent through proprietary or third-party File Transfer Protocol (FTP) sites will not be accepted.
4. For instructions on how to post an offer, please refer to the Posting Offer demo:
https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.
5. Upon proposal submission, the offeror should receive a system notification of successful proposal submission from PIEE. Offerors’ proposals submitted via the PIEE Solicitation Module shall not contain CLASSIFIED INFORMATION..
6. Offerors shall address their package with the RFP number and Offeror’s company name. The Offeror is responsible for ensuring that it drops off its proposals and generates a drop-off time prior to the proposal submission date and time. In the event of a dispute of proposal time submission, the submittal date and time documented in PIEE shall serve as the official time that the proposal was submitted to the Government. Late proposal submissions will be handled in accordance with FAR 52.215-1.
7. Proposal Format – Each file should be labeled so that it is known what volume the document belongs
to. All Volume 1 Price Volume files should begin with “Vol 1” in the file name and and all Volume 2
Non-Price (Technical) Volume files should begin with “Vol 2 –“ in the file name.
8. All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current
Microsoft Office Suite or Adobe Acrobat. The proposal shall have separate files. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious and traceable. No fields or documents shall be password protected. If files are compressed, the necessary decompression program must be included.
9. Proposal volumes shall be structured as follows:
Proposal Volume Title
USS BOXER BOX-1 USS BOXER Price Volume
BOX-2 USS BOXER Technical Volume
III. GENERAL INFORMATION
A. Ship Checks:
1. The USS BOXER (LHD 4) will not be available for ship check prior to the proposal submission due date. Potential Offerors may inspect the USS ESSEX (LHD 2) in San Diego, CA, from 9 July 2024 to
5 August 2024.
2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to Brian C. Romano and
LT Jourdan Jenkins at brian.c.romano.civ@us.navy.mil and jourdan.e.jenkins.mil@us.navy.mil, respectively. Due to the ship location, additional information will be provided upon request.
3. Participants will be subject to security, safety, and other applicable regulations established by
Southwest Regional Maintenance Center (SWRMC) and ship’s Commanding Officers. Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:
a) http://www.navsea.navy.mil/Home/RMC/swrmc/Visitor-Information/
b) https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_protection/pa ss_and_decal.html
B. Specifications and Associated Reference Documentation:
1. Offerors may request solicitation attachments by submitting a request to:
a) Brian Romano at brian.c.romano.civ@us.navy.mil, and
b) LT Jourdan Jenkins at jourdan.e.jenkins.mil@us.navy.mil
2. Upon request, the Government will provide the Specification Package Work Items and Work Item
References.
3. Additional work item references not already in the possession of the Offerors, commercially available, listed under FAR 52.211-2, are available through the following websites:
a) https://jedmics.net/
b) https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx
c) https://nsedr.nnsy.navy.mil//
4. In order to receive access to Attachment J-2 (Work Item Plans, Drawings and Other References), provide a written request to Ms. Jacqueline Black, at jacqueline.r.black.civ@us.navy.mil with a copy to the Contract Specialist, LT Jourdan Jenkins, at jourdan.e.jenkins.mil@us.navy.mil, and the
Contracting Officer, Brian Romano, at brian.c.romano.civ@us.navy.mil.
C. Alteration of Solicitation
1. Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.
D. Proposal Information
1. Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, Offerors are advised conclusory statements regarding an Offeror’s experience such as: “the Offeror understands”, “the Offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors shall provide specific and concise information to validate all assertions.
E. Amendments mailto:jourdan.e.jenkins.mil@us.navy.mil http://www.navsea.navy.mil/Home/RMC/swrmc/Visitor-Information/ https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_protection/pass_and_decal.html https://www.cnic.navy.mil/regions/cnrsm/installations/navbase_san_diego/om/force_protection/pass_and_decal.html mailto:brian.c.romano.civ@us.navy.mil mailto:jourdan.e.jenkins.mil@us.navy.mil https://jedmics.net/ https://mfom.sscno.nmci.navy.mil/MFOM/DoDStatement.aspx https://nsedr.nnsy.navy.mil/ mailto:jacqueline.r.black.civ@us.navy.mil
1. The Government may revise the solicitation at any time by means of an Amendment. It is an Offeror’s responsibility to ensure it is accessing the SAM.gov website to view potential amendments and procurement notifications for this solicitation.
F. Teaming Arrangements
1. Proposals must be submitted by one (1) Prime Contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a Prime Contractor with a unique
Commercial and Government Entity (CAGE) code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), Offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.
G. One-bid Situation
1. If the Government receives only one bid for solicitation N0002425R4428, the Government reserves the right to require certified cost or pricing data in accordance with DFARS 252.215-7008, Only One
Offer. As identified by the Contracting Officer, additional cost or pricing data will be required in order to determine whether proposed pricing is fair and reasonable or to comply with the statutory requirements of certified cost or pricing data in accordance with 10 USC 2306a and FAR 15.403-4.
The Offeror agrees to provide current, thorough, complete and accurate cost and pricing data and any additional data requested within 30 calendar days after receipt of the Contracting Officer’s request or sooner. The data package shall be submitted in an electronic format and shall be valid for a minimum period of six (6) months from the date of submittal. The proposal and submission of cost or pricing data shall conform to the requirements outlined in FAR 15.408 Table 15-2, Instructions for Submitting
Cost/Price Proposals When Certified Cost or Pricing Data Are Required, and DFARS 252.215-7009, Proposal Adequacy Checklist, as well as any additional detailed requirements specified by the
Contracting Officer. Additionally, the data package shall include:
(1) A computational spreadsheet (cost model) in Microsoft Excel-compatible format containing any cost calculations (i.e. formulas) associated with the proposed costs. The spreadsheet must segregate the proposed direct labor hours, direct labor costs, direct material costs, other direct costs, subcontract costs, profit and any indirect costs (e.g., overhead, fringe benefits, G&A, and
FCCOM, including visibility into the specific pricing rates applied and the methodology by which rates are applied to applicable cost bases), as applicable, by calendar year, work item and
CLIN, or as specified by the Contracting Officer. The elements of cost in the spreadsheet must be traceable to the supporting rationale provided in the Basis of Estimate (BOE) information.
(2) A completed Proposal Adequacy Checklist, pursuant to DFARS 252.215-7009, Proposal
Adequacy Checklist.
(3) Five years of historical end of year actuals of direct labor rates, indirect pools, and indirect basis.
(4) Five years of historical end of year actuals of direct labor hours, direct material, and subcontractor costs (labor hours and material).
(5) Five years of historical end of year actuals of daily extension rates.
(6) Certified cost or pricing data for subcontracts that are the lower of either (i) $15M or more; or
(ii) both more than the pertinent certified cost or pricing data threshold and more than 10 percent of the prime contractor’s proposed price (as per FAR 15.404-3 Subcontract Pricing
Considerations).
All elements of the electronic package and computational spreadsheet shall be capable of being searched, reproduced, manipulated and cross-referenced to the supporting cost or pricing data (i.e.
Excel file with formulas vice hard entry/PDF). Each Basis of Estimate (BOE) in prime and subcontractor proposals must address four critical questions:
What is the estimate?
What is the estimate based on?
How was the estimate derived?
Why is the estimate reasonable?
In accordance with FAR 15.406-2, Certificate of Current Cost or Pricing Data, when certified cost or pricing data are required, a Certificate of Current Cost or Pricing Data will be required immediately after agreement on cost/price is reached.
All data provided by the Offeror will be safeguarded and protected in accordance with FAR 3.104-4, Disclosure, protection, and marking of contractor bid or proposal information and source selection information, FAR 15.207, Handling proposals and information, and the Procurement Integrity Act, 41
U.S.C. Sections 2101-2107.
H. Notification of Use of Navy Support Contractors for Official Contract Files
1. NAVSEA currently utilizes support contractors from Serco-IPS Corporation, DELTA Resources, Inc.
(a wholly owned subsidiary of VT Group Holdings, Inc.), and Herren Associates Inc. to manage official contract files, including the official file supporting this procurement. NAVSEA may, without further notice, enter into contracts with other contractors for file management services as describe in
NAVSEA Standard Text L-204-H003. Please refer to NAVSEA Standard Text L-204-H003 for further details.
IV. PROPOSAL FORMAT
A. To facilitate efficiency and consistency in proposal evaluation the following is mandatory. PROPOSALS
WHICH DO NOT FOLLOW THIS DIRECTION MAY BE REJECTED AS NON-RESPONSIVE
AND THUS INELIGIBLE FOR AWARD. NON-RESPONSIVE PROPOSALS WILL NOT BE
EVALUATED.
B. Electronic Proposals: Electronic Proposals: All proposals shall be submitted via PIEE as outlined above.
Pages shall be formatted to 8.5 x 11 inch paper with one inch margins or 11 x 17 inch paper with one inch margins. The text used shall be Times New Roman with a minimum of 12 point font. Any revisions to
Offerors’ proposals (if required) shall be submitted in two (2) forms: (1) a final clean revised document;
and (2) a redlined document outlining the Offeror’s changes. The Contracting Officer reserves the right to provide any additional instructions regarding revisions to Offerors’ proposals via letter. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section L, paragraph V where required.
C. Page Limits:
1. Volume I (BOX-1)
a) Factor 1 – Price: No page limitation with the exception of the cover letter which shall not exceed three (3) pages.
2. Volume II (BOX-2)
a) Non-price Factor 1 - Technical Eligibility & Physical Resource Capacity: No page limitation with the exception of the narrative which shall not exceed 10 pages
b) Non-price Factor 2 – Manpower & Small Business Participation:
a. Subfactor A (Manpower): No page limitation, with the exception of the narrative which shall not exceed 20 pages
b. Subfactor B (Small Business Participation): No page limitation, with the exception of the narrative which shall not exceed 10 pages
c) Non-price Factor 3 - Schedule & Execution Approach: No page limitation, with the exception of the narrative which shall not exceed 30 pages
(1) Emphasis Area A (Open and Inspect (O&I) Reports Plan): No page limitation, with the exception of the narrative which shall not exceed 15 pages
(2) Emphasis Area B (High Level Schedule Substantiation ): No page limitation, with the exception of the narrative which shall not exceed 15 pages
d) Non-price Factor 4 – Past Performance: No page limitation
V. PROPOSAL CONTENT
A. VOLUME I
Price Proposal: The price proposal shall not contain non-price factor information.
1. Factor 1: Price: The price proposal shall be comprised of the following documentation:
a) Cover Letter,
b) Signed SF 33 with all amendments acknowledged,
c) Small Business Subcontracting plan per FAR Part 19 (large businesses only),
d) Any Joint Venture / teaming agreements (if applicable),
e) NSI 009-72 Narrative and Supporting Documentation (if applicable),
f) Completed Attachment J-4 and Solicitation Section B carrying forward information from Attachment
J-4, as applicable, containing:
(1) Work Item Pricing for all Base and Option Items,
(2) Daily Extension Rates,
(3) Inter-port Differential (IPD),
(4) Fully Burdened Ship Repair Labor & Material Burden Rate, New Work & Growth Reservation,
(5) NSI 009-72 Deduction (if applicable),
(6) Government Provided Pier Differential (if applicable), and
g) Completed Execution Milestones and Key Event Dates (Attachment J-3).
h) Completed Proposal Assessment (Attachment S-7).
2. Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the
Offeror shall include the following in the cover letter:
a) Identification of all enclosures included with the proposal,
b) CAGE and SAM Unique Entity Identifier (UEI) numbers for the Prime contractor,
c) Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).
d) As outlined in FAR 15.404-3(c)(1), name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at the lower of either:
(1) $15 million or more, or
(2) more than 10 percent of the prime contractor’s proposed price.
e) For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook
(Attachment J-4) provide an explanation as to why. In addition, if applicable:
(1) For any WI with a total value of zero labor hours proposed (prime and subcontractor combined)
(although material is proposed), provide an explanation as to why.
(2) For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.
3. Standard Form 33 (SF-33): As part of the price proposal package, the Offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL APPLICABLE CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.
4. Small Business Subcontracting Plan (SBSP):
a. An Offeror shall submit a SBSP outlining its strategy for maintaining compliance with FAR
52.219-9 ALT II for the duration of the USS BOXER (LHD 4) FY25 SRA availability, which includes:
i. A subcontracting goal of 25 percent of an Offeror’s total subcontracting dollars utilizing small disadvantaged businesses, women-owned small businesses, veteran-owned small businesses, service-disabled veteran-owned small businesses, and HUB-Zone small businesses. Note, the
25 percent goal is inclusive of the congressionally mandated five percent (5%) goal for small disadvantaged business concerns.
ii. A statement of the total dollars planned to be subcontracted and a statement of the total dollars planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business (including ANCs and
Indian tribes) and women-owned small business concerns, as a percentage of total subcontract dollars as well as total contract dollars.
iii. Offerors must provide rationale for any proposed plan which does not meet the following thresholds (as applied to total contract dollars):
(1) 25 percent of prime contracts for small businesses;
(2) Five percent of prime and subcontracts for women-owned small businesses;
(3) Five percent of prime contracts and subcontracts for small disadvantaged businesses;
(4) Three percent of prime contracts and subcontracts for HUBZone small businesses;
and
(5) Three percent of prime and subcontracts for service-disabled veteran-owned small businesses.
iv. In addition, Offerors must provide explanation for any SBSP which fails to address all requirements outlined in FAR 52.219-9 ALT II.
v. A SBSP is NOT REQUIRED from a small business concern.
5. Completed Solicitation Section B and Pricing Workbook (Attachment J-4):
a) Offerors must propose on all contract line items (CLINs) including all base and option CLINs, complete Section B “NOTE B: SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR
RATE (FULLY BURDENED),” complete Section B “NOTE D: SCHEDULE OF DAILY
RATES FOR PIERSIDE AND DRY DOCKING (FULLY BURDENED) FOR PURPOSES OF
A COMPENSABLE EXTENSION TO THE DRY-DOCKING OR DELIVERY DATE,” and complete all tabs of Pricing Workbook (Attachment J-4) to be considered responsive.
b) The Offeror shall submit prices using the Pricing Workbook (Attachment J-4) for all Tabs, including:
Work Item Pricing, Daily Extension Rates, Fully Burdened Ship Repair Labor Rate & Material
Burden Rates and Total Evaluated Pricing in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern.
The Pricing Workbook (Attachment J-4) Fully Burdened Ship Repair Labor Rate and Material
Burden Rate must match the rates provided in the Section B “NOTE B: SCHEDULE OF PRICES /
RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED).” If there is a discrepancy between the two, the Section B Fully Burdened Ship Repair Labor Rate and Material Burden
Rate shall govern.
c) Offerors shall insert pricing in all yellow shaded fields in the pricing workbook (Attachment J-4).
6. Inter-port Differential (IPD)
a) The IPD applicable to the USS BOXER (LHD 4) FY25 SRA must be included in all offers and reflects the costs incurred by the Navy to accomplish an availability at a port other than the homeport. The following chart provides the values to be included in all Offerors’ price proposals to determine the
Offeror’s total evaluated price.
Location Differential
San Diego, CA $222,436
Vallejo, CA $3,057,738
Seattle, WA $3,229,393
Portland, OR $8,274,201
b) An Offeror whose location is not listed in the above Government provided port differential tables shall submit a bidder’s question requesting a Government provided port differential be calculated for the
Offeror’s proposed location for the USS BOXER (LHD 4) FY25 SRA.
7. NSI 009-72 Reduction (if applicable)
a) Offeror must provide a narrative as well as other than certified cost or pricing data in accordance with
FAR 15.403-3, supporting the impact of SI 009-72 Security Measures for Surface Combatants and
Amphibious ships use of a water barrier, numbered Fleet Commander-approved barge or other physical barrier approved by the numbered Fleet Commander.
8. Government Provided Pier Differential (if applicable)
a) The Government provided pier differential must be included in all offers proposing to use a
Government provided pier in lieu of a contractor owned pier and is calculated using average electricity and water consumption, as well as sewage and oily waste disposal. The following chart provides the values to be included in offerors’ price proposals, as applicable, to determine the offeror’s total evaluated price:
Location Differential
San Diego, CA $7,423,686
b) Any awardee proposing to use Government-provided pier space shall be responsible to provide temporary services to satisfy Work Specification 992-11-009 required to complete USS BOXER (LHD
4) FY25 SRA at Naval Base San Diego, including but not limited to the requirements of S0570-AC-
CCM- 010/8010 Rev 3/A, Industrial Ship Safety Manual for Fire Prevention and Response, Specification package J-1 TPPC-LHD4-SWRMC25-CNO1, and J-12 NBSD Facilities and Services .
B. VOLUME II
Non-Price Proposal: Do not include cost or price information in this volume. The non-price proposal shall be comprised of four (4) factors, as follows:
1. Non-Price Factor 1 – Technical Eligibility & Physical Resource Capacity: Offerors must provide the following to demonstrate eligibility for Award and ability to provide the physical resources necessary to successfully complete the solicited availability. (Narrative shall not exceed 10 pages):
a) Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific pier intended to be used for the proposed availability and indicates that the pier meets the minimum characteristics identified in Attachment S-5.
b) Provide a completed Execution Milestones & Key Event Dates (Attachment J-3) in Microsoft Excel format and a signed letter identifying and confirming ownership of a pier available to berth the vessel from the ‘Availability Start’ through ‘Contract Complete’ milestones as outlined in the Execution
Milestones & Key Event Dates (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the Offeror is utilizing a subcontractor for physical resources (pier), a letter signed by the subcontractor identifying and confirming committed access to the proposed pier from the ‘Availability Start’ through ‘Contract Complete’ milestone as outlined in the Execution Milestones & Key Events (Attachment J-3) is required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed pier, whether owned by the Offeror or subcontractor, must be accessible by the USS BOXER
(LHD 4) without any modification to the vessel.
c) Complete the Pier and Dry Dock Graphical Representation Template (Attachment S-8) to demonstrate the Offeror has the pier and dry dock available to complete the requirements of the proposed availability. Attachment S-8 must show:
a. The piers and dry docks expected to be in working capacity by month from proposal submission through the Contract Completion Date in Attachment J-3 and
b. The awarded and outstanding projects and work using those resources by month. The
Attachment S-8 must include:
(1) The piers and dry-docks required to complete work the Offeror currently has under contract based on current contract schedules.
(2) The piers and dry-docks required to complete all outstanding proposals, including this proposal, per proposed schedules.
(3) The piers and dry-docks required to complete any other anticipated requirements, including but not limited to Non-Navy work, pier and dry-dock upgrades, maintenance or dredging.
d) Provide a narrative not to exceed 10 pages to support the Attachment S-8 and address:
i. If the Offeror proposes a subcontracted pier or dry dock, explain the resource requirements that the prime contractor will provide and the pier and dry dock that the subcontractor will provide.
ii. The Offeror's plan to resolve pier and dry dock resource conflicts as a result of proposed and awarded projects. Piers and dry docks must not be committed to multiple ships during the same time period without explanation.
iii. If the Offeror proposes an interval of less than seven days between the unberthing or undocking date of another requirement and the proposed berthing or docking date of this availability or a proposed docking date within the first seven days of this availability, then detail the necessary steps to accomplish this effort.
2. Non-Price Factor 2 – Manpower and Small Business Participation:
Subfactor A- Manpower: To assess the Offeror’s ability to provide efficient manpower to successfully complete the solicited availability, the Government requires the Offeror to provide specified workload data that contains historical workload performance and forecasted workload estimates. (Narrative shall not exceed 20 pages):
a) Manpower Performance Data Sheet (Attachment S-4): Provide a completed Manpower Performance
Data Sheet, (Attachment S-4) in Microsoft Excel in the format provided in this solicitation. Include all projects, defined as Navy or Non-Navy Ship Repair and New Construction Projects, for which the
Offeror is the prime or a major subcontractor (performing 30% or more of a CNO availability or comparable portion of a Non-Navy project) which were active (on-going or completed) or planned
(awarded or proposed) (including the proposal for this solicitation) during the first month identified in
Attachment S-4 and the Contract Complete Date of this solicitation. All projects, which are yet to complete (on-going or planned), require monthly data throughout the full duration. In the case that an on-going project began prior to the date range provided within the S-4, this will require the Offeror to modify the S-4 so that the provided data captures the project’s full duration. The Attachment S-4 must capture all work performed by the Offeror within the shipyard and at the local Naval Station, if the
Offeror’s shipyard is within the homeport fleet concentration area. The Offeror may estimate performance information for subcontractors based on prime contractor budgets and the prime contractor’s actual outlays to subcontractors. Enter remaining growth work options in the distinguished column/row, using the phasing assumptions provided in Section B Note F.
The “Definitions” tab within Attachment S-4 defines the following terms: Contract / Actual / Forecast
Start and Completion Date, Project Status, Time-now, Cumulative Earned Value, Time-phased Earned
Value, Full Time Equivalents (FTE), Budget at Complete (BAC), Estimate at Complete (EAC), Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Budget to
Complete (BTC), Actual Cost of Work Performed (ACWP), Estimate to Complete (ETC), Cost
Performance Index (CPI), To-Complete Cost Performance Index (TCPI), Schedule Performance Index
(SPI), Remaining Growth Options, New Work, Prime Contractor Labor, Overtime Labor, Subcontractor Labor, and Temporary Labor.
i. For each project, provide the Earned Value (hours) data on a time phased, month-by-month basis (month-ending) over each project’s duration, from the Actual / Forecast Start Dates to the Actual / Forecast Completion Dates.
ii. For each project, verify the cumulative hour values calculated within the S-4 in the
“Cumulative EV” tab align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.
Provide the additional project related information requested in the “Cumulative EV” tab (all cells that are green).
iii. Provide a list of holiday dates in the “Holiday Calendar” tab. If the monthly reporting dates associated with the monthly earned value data are not aligned to the calendar month, then provide the appropriate values for the “Month Start” and “Month End” in the “Monthly EV” tab (rows 3 and 4). This date information is necessary to convert the monthly hours data into monthly FTE as described in Attachment S-4.
b) Manpower Charts: Provide manpower charts reflecting the data in Attachment S-4. The manpower charts must represent each project’s ACWP and ETC within the Actual / Forecast Start Date and
Actual / Forecast Completion Date for each project provided in Attachment S-4. The manpower charts must show separate stacked areas for each project in the chart. The manpower charts must meet all format requirements stated in “Manpower Charts Format” tab within Attachment S-4. The “Manpower
Charts Format” tab within Attachment S-4 includes an example manpower chart formatted to requirements. Provide the following manpower charts:
(1) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s remaining outstanding proposals, as provided in Attachment S-4.
(2) Manpower chart showing the total FTE resources required for all projects completed, on-going, awarded, the solicited availability and the Offeror’s executable award scenario from the
Offeror’s remaining outstanding proposals accounting for all un-mitigatable resource conflicts, as provided in Attachment S-4. This manpower chart is not required if it produces the same chart required in Section L, paragraph V.B.2b)(1) above.
c) Manpower Narrative: Provide a narrative to characterize the workload information from the manpower charts required in Section L, paragraph V.B.2b)(1)-(2), by describing and quantifying the: historical yard-wide FTE levels, forecasted yard-wide FTE levels, and the composition of historical/forecasted
FTE values for: prime straight, prime overtime, subcontracted, and temporary labor. The narrative must explain how and when the Offeror plans to adjust or maintain the current workforce to achieve the proposed forecasted FTE levels and whether the adjustment occurs via additional hiring, use of subcontractors, use of temporary labor, or overtime. Provide supporting data and historical evidence to the maximum extent possible. The narrative should not exceed 20 pages. Address the following possibilities:
i. Any existing constraints between outstanding proposals that would prohibit the Offeror from executing one or more outstanding proposals.
ii. Should the Offeror propose to hire additional personnel for the solicited availability, the narrative must quantify the proposed number of hires and describe the plan to hire and manage the additional personnel from Time-now through Contract Completion Date.
iii. Should the Offeror propose overtime for the solicited availability, the narrative must include:
the historical overtime rate, the forecasted overtime rate, and the plan to manage and provide the overtime from Time-now through Contract Completion Date.
iv. Should the Offeror propose temporary labor for the solicited availability, the narrative must include: the historical temporary labor FTE, the forecasted temporary labor FTE, and the plan to manage and provide the temporary labor from Time-now through Contract Completion
Date.
v. Should the Offeror propose subcontracted resources for the solicited availability, the Offeror must explain which requirements the prime contractor will complete and which work the subcontractor will complete, including the work item, trade, and duration of each subcontracted requirement. The Government considers the use of subcontractors in excess of
45% of production labor to increase the risk of unsuccessful contract performance. The
Offeror must include in its narrative a plan to manage the subcontractor manning levels included from Time-now through Contract Completion Date.
vi. The Offeror must explain any atypical circumstances that caused or contributed to poor historical earned value performance. The Offeror must address how its proposed approach for the evaluated project reflects resiliency to atypical causes of risk (e.g. government furnished material delays or foreseeable trade labor demand).
Subfactor B- Small Business Participation: To assess the Offeror’s commitment to small business participation, the Government requires the Offeror to provide a completed Small Business Participation
Commitment Document (SBPCD), Attachment J-11. The Government will use the submitted SBPCD to evaluate the contractor’s commitment to small business participation for this subfactor. This evaluation is separate from the FAR requirement for the review and acceptance of an Offeror’s Small Business
Subcontracting Plan. All offerors (both other than small businesses and small businesses) will be evaluated on this subfactor. (Narrative shall not exceed 10 pages):
a) The Offeror shall provide a narrative that is sufficiently complete as to clearly describe the Offeror’s understanding of the Small Business requirements and its planned approach to meet its stated goals, such as the type of commitment (e.g. joint venture, teaming arrangement, subcontractor, etc.);
complexity and variety of the work small businesses are to perform; and participation of small businesses in terms of the total acquisition expressed both in dollars and percentage. The narrative shall not exceed 10 pages.
The small business participation percentage shall be calculated in terms of total contract value:
Participation percentage = Total Small Business Dollars*
Total Contract Value
* The Total Small Business Dollars is inclusive of the work to be performed directly by a Small
Business Prime Offeror.
b) The Government’s Small Business Participation Minimum Quantitative Requirement (MQR) for this contract is: 3%. The offeror is encouraged to propose a Small Business Participation objective percentage as high as is practicable, as long as the percentage is supported by the related SBPCD and the written narrative. The Offeror’s proposed Small Business Participation percentage for this contract shall be incorporated into the contract upon award via the SBCPD (Attachment J-11).
3. Non-Price Factor 3 –Schedule & Execution Approach: The Offeror shall provide an Open and Inspect
(O&I) Reports Plan and a High Level Schedule Substantiation. (Narrative shall not exceed 15 pages for
Emphasis Area A and 15 pages for Emphasis Area B):
a) Emphasis Area A - Open and Inspect (O&I) Reports Plan – Attachment J-10 may not include all
O&I reports required by Attachment J-1. Offerors are still required to plan for/schedule for the remaining reports within their proposals and schedules. Offerors shall provide a completed Attachment
J-10 (20% O&I Reports Due) and an O&I Reports Plan as follows:
(1) Attachment J-10 (20% O&I Reports Due):
i. Offerors shall enter a proposed milestone for 20% Open/Inspect (Early). The 20%
Open/Inspect (Early) milestone is the Offeror’s proposed milestone for submission of O&I
Reports prior to the 20% Milestone. The proposed date shall be entered into both Attachment
J-3 and an “X” in the appropriate column in the J-10.
ii. Offerors shall enter a proposed milestone for 20% Open/Inspect (Exception). The 20%
Open/Inspect (Exception) milestone is the Offeror’s proposed milestone for submission of
O&I Reports after the 20% Milestone. The proposed date shall be entered into both
Attachment J-3 and J-10. An “X” shall be entered in the appropriate column in the J-10..
iii. Offerors shall enter a proposed milestone for 20% Open/Inspect (All). The 20% Open/Insect
(All) milestone is set forth on Attachment J-3. For any milestone that is not Early or
Exception related, the auto-calculated date shall be entered into Attachment J-10. An “X” shall be entered in the appropriate column in the J-10.
(2) O&I Reports Plan:
The Offeror’s O&I Reports Plan shall:
i. Explain the rationale supporting the selection of the date for the 20% Open/Inspect (Early) milestone.
ii. Explain the overall logic and rationale supporting the Offeror’s selection of O&I Reports work items for the 20% Open/Inspect (Early) milestone. The explanation shall:
(1) Substantiate the Offeror’s ability to provide the O&I Reports by the 20%
Open/Inspect (Early) milestone.
(2) Substantiate how the Offeror’s sequencing and prioritization improves the
Offeror’s ability to provide on-time delivery of the availability.
(3) Explain the rationale supporting the selection of the date for the 20%
Open/Inspect (Exception) milestone, demonstrating that the date is feasible and supports on-time delivery of the Availability.
iii. Explain the overall logic and rationale supporting the Offeror’s selection of O&I Reports for the 20% Open/Inspect (Exception) milestone. For each exception the Offeror shall:
(1) Explain why the Offeror requires an exception to provide the O&I Reports by the
20% Open/Inspect (Exception) milestone (examples for the rationale include, but are not limited to, sequencing conflicts, stability concerns, and work integration.)
(2) Identify and explain the risks to an on-time delivery of the availability created by the delayed provision of the Reports.
(3) Identify and substantiate the reasonableness of the Offeror’s risk mitigations to ensure the delay does not undermine the Offeror’s ability to provide on-time delivery of the availability.
iv. No additional justification is required for on time reports.
b) Emphasis Area B - High Level Schedule Substantiation: Provide a narrative explanation of the
Offeror’s plan to complete the Availability’s major phases, seen as the work completed between the following key events / milestones :
Avail Start to PCD
(1) The Offeror shall accomplish the following for each phase:
i. Develop an overarching schedule at the system level or above, identify and explain the phase’s major components / processes and identify the components / processes that will comprise the phase’s critical path.
ii. An estimate of the number of days the Offeror will require to complete each component / process within each phase The Offeror must substantiate their estimates with data informed schedule estimating relationships. Examples of substantiation may include (but are not limited to):
A. Analogies to historically completed projects
B. Historical or engineering informed parametric estimates
iii. Identify and explain the most likely major risks the Offeror sees in their ability to complete each phase’s scope within the phase’s proposed duration.
iv. Identify and quantify contingencies available to the Offeror to mitigate those risks.
Examples of substantiation may include (but are not limited to):
A. Schedule float
B. Capacity for additional shifts
C. Capacity to incorporate additional personnel
v. Substantiate the estimated effectiveness of each potential risk mitigation contingency.
Substantiation must include schedule estimating relationships to demonstrate mitigation effectiveness. Examples of substantiation may include (but are not limited to):
A. Analogies to historically completed projects
B. Historical or engineering informed parametric estimates
4. Non-Price Factor 4 – Past Performance:
Offerors may provide past performance information for up to five (5) previous contracts. If the Offeror has not completed any contracts as a prime contractor, within three (3) years of the date of the initial solicitation’s posting to SAM.gov, information regarding the Offeror’s performance with regard to subcontracts and/or commercial contracts may be submitted. Offerors shall complete Attachment S-2 Past
Performance Contractor Performance Assessment Reporting System (CPARS) References for each of the contracts provided where CPARS contract data is available. If CPARS data is not available for a contract, Offerors shall provide Attachment S-9 Past Performance Questionnaire (PPQ).
Where the Offeror does not have recent or relevant past performance information, the Offeror shall affirmatively state that it does not have recent and relevant past performance information for the
Government to consider.
If the Offeror does not have CPARS and is…