USS BOXER A0003.pdf
PDF 2 MB Posted
- Solicitation number
- N0002424R4425
About this file
This document is a solicitation from the Naval Sea Systems Command (NAVSEA) for the execution of the USS BOXER (LHD 4) FY25 Selected Restricted Availability. The availability includes maintenance, modernization, and repair work, and will require a highly capable contractor with substantial facilities and resources to complete the work. The solicitation is issued on a coast-wide basis on the West Coast, and a single contract is expected to be awarded to one contractor. The contract will begin in April 2025 with an expected completion in August 2026. The solicitation does not contain a small business set-aside, as market research indicates there are not two or more small businesses capable of competing for this requirement. Key details include:
- Solicitation Number: N0002424R4425
- Opportunity Type: Solicitation
- Place of Performance: West Coast, USA
- Anticipated Award: On or around December 2024
- Period of Performance: April 2025 to August 2026
- The contractor shall provide material, support, and facilities to prepare and accomplish the required repairs and alterations to the USS BOXER (LHD 4). The work will be completed in accordance with the provided work item specifications, drawings, and other references.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 166 - 180
181 - 208 X H 209 - 220 jourdan.e.jenkins.mil@us.navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO 1 220
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00024 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JOURDAN E JENKINS (202)781-1139
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 80
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
81 - 120 121 - 122
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
123 - 127 128 - 134
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 135 - 144 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 145 - 146 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
147 - 164
PART II - CONTRACT CLAUSES
NAVAL SEA SYSTEMS COMMAND (HQ)
1333 ISAAC HULL AVE SE
WASHINGTON NAVY YARD DC 20376-2030
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N0002420FR62083
5. DATE ISSUED
08 Jul 2024
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0002425R4425
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Lot
RESERVED
FFP
FOB: Destination
PURCHASE REQUEST NUMBER: N0002420FR62083
PSC CD: J999
NET AMT
RESERVED
FFP
FOB: Destination
CDRLs
FFP
Contracts Data Requirements Lists (CDRLs) FOB: Destination
TYCOM Base
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
TYCOM Alts
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
TYCOM - Habitability
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
Prorates
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
NAVSEA OPN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
NAVSEA OMN
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F FOB: Destination
OPTION Bargelant
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION Fuel Assistance & Tow
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 80156K, AN/SLQ-32(V)6 Hardware Upgd
FFP
ShipAlt LHD1-80156K, AN/SLQ-32(V)6 Hardware Upgrade; accomplish
(OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 95520K & 95532K, CASS RF-A & RF-B Ins
FFP
ShipAlt 95520K and 95532K, Consolidated Automated Support System (CASS) RF-A and RF-B Installation, Alteration Installation Team (AIT) Support Service;
provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 96483K, CAC2S Afloat Hardware, AIT
FFP
ShipAlt 96483K, CAC2S Afloat Hardware, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 88635K, CIWS Blk 1B Overhaul, AIT
FFP
ShipAlt 88635K, Close In Weapons System (CIWS) Block 1B Overhaul, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 86222K, NFG Backfit Phase I, AIT
FFP
ShipAlt LHD4-86222K, Next Generation Fathometer (NGF) Backfit Phase I, Alteration Installation Team AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93698K, EPLRS Tri-Band Antenna Mod
FFP
ShipAlt LHD4-93698K, EPLRS Tri-Band Antenna Modification, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 94058K, EMUT MUOS Rep Ant, AIT
FFP
ShipAlt LHD4-94058K, Enhanced Manpack UHF Terminal (EMUT) Mobile User Objective System (MUOS) Replacement Antenna, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93584K, AIS V1 Cyber Hardening, AIT
FFP
ShipAlt LHD4-93584K, AIS V1 Cyber Hardening, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93526K, GPNTS(V)8 Alteration, AIT
FFP
ShipAlt LHD4-93526K, GPNTS(V)8 Alteration, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 99094K, Navy Cash 2.0, Hardware, AIT
FFP
ShipAlt LHD1-99094K, Navy Cash 2.0, Hardware, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 95037K, NFSA Hardware Refresh, AIT
FFP
ShipAlt LHD1-95037K, NAVAIR Fleet System Array (NFSA) HARDWARE REFRESH, Alteration Installation Team (AIT) Support Service; provide (OPTION
ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93785K, SWD 93786, Upgd to SYY-1 HW
FFP
ShipAlt LHD4-93785K, SWD 93786, Upgrade to SYY-1 HW, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93868K, I-STALKER HW, AIT Spt Svc
FFP
ShipAlt 93868K, I-STALKER HW, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 94282K, RAM MK 31 Mod 5, AIT Spt Svc
FFP
ShipAlt LHD1-94282K, RAM MK 31 Mod 5, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 95267K, Moriah AAS AIT Spt Svc
FFP
ShipAlt LHD1-95267K, Moriah Aviation Land and Launch Enclave (AAS), Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA FC81023, URN-32 Shipboard TACAN, AIT
FFP
ShipAlt LHD1-FC81023, URN-32 Shipboard TACAN, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 97962K, ShipAlt Title, AIT Spt Svc
FFP
ShipAlt 97962K, ShipAlt Title, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 92525K, MF-TDMA MODEM SUPPOR, AIT
FFP
ShipAlt 92525K, MF-TDMA MODEM SUPPOR, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 93699K, IRIDIUM ANTENNA, AIT
FFP
ShipAlt 93699K, IRIDIUM ANTENNA, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 92881K, NMT MODEM SPIRAL ONE, AIT
FFP
ShipAlt 92881K, NMT MODEM SPIRAL ONE, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SAs 96363K & 96363K AIT Spts Svc
FFP
ShipAlt LHD1-96363K, Electric Plant Control and Monitoring System Installation;
accomplish & ShipAlt LHD1-96363K, EP PMP Installation, Alteration Installation Team (AIT) Support Service; provide
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION SA 96362K, Circuit Breaker Upgrade, AIT
FFP
ShipAlt LHD1-96362K, Circuit Breaker Upgrade, Alteration Installation Team (AIT) Support Service; provide
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION TYCOM Option
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0004
FFP
Growth Reservation Associated with CLIN 0004. See attachment J-4.
See Notes A - F FOB: Destination
FFP
Growth Reservation Associated with CLIN 0004. See attachment J-4.
See Notes A - F FOB: Destination
FFP
Growth Reservation Associated with CLIN 0004. See attachment J-4.
See Notes A - F FOB: Destination
Growth Reservation for CLIN 0004
FFP
Growth Reservation Associated with CLIN 0004. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0004
FFP
Growth Reservation Associated with CLIN 0004. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0005
FFP
Growth Reservation Associated with CLIN 0005. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0005
FFP
Growth Reservation Associated with CLIN 0005. See attachment J-4.
See Notes A, B and D - F FOB: Destination
OPTION Growth Reservation for CLIN 0005
FFP
Growth Reservation Associated with CLIN 0005. See attachment J-4.
See Notes A - F FOB: Destination
Growth Reservation for CLIN 0006
FFP
Growth Reservation Associated with CLIN 0006. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0007
FFP
Growth Reservation Associated with CLIN 0007. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0008
FFP
Growth Reservation Associated with CLIN 0008. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Growth Reservation for CLIN 0009
FFP
Growth Reservation Associated with CLIN 0009. See attachment J-4.
See Notes A, B and D - F FOB: Destination
OPTION Growth Reservation for CLIN 0010
FFP
Growth Reservation Associated with CLIN 0010. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0011
FFP
Growth Reservation Associated with CLIN 0011. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0012
FFP
Growth Reservation Associated with CLIN 0012. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0013
FFP
Growth Reservation Associated with CLIN 0013. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0014
FFP
Growth Reservation Associated with CLIN 0014. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0015
FFP
Growth Reservation Associated with CLIN 0015. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0016
FFP
Growth Reservation Associated with CLIN 0016. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0017
FFP
Growth Reservation Associated with CLIN 0017. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0018
FFP
Growth Reservation Associated with CLIN 0018. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0019
FFP
Growth Reservation Associated with CLIN 0019. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0020
FFP
Growth Reservation Associated with CLIN 0020. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0021
FFP
Growth Reservation Associated with CLIN 0021. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0022
FFP
Growth Reservation Associated with CLIN 0022. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0023
FFP
Growth Reservation Associated with CLIN 0023. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0024
FFP
Growth Reservation Associated with CLIN 0024. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0025
FFP
Growth Reservation Associated with CLIN 0025. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0026
FFP
Growth Reservation Associated with CLIN 0026. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0027
FFP
Growth Reservation Associated with CLIN 0027. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0028
FFP
Growth Reservation Associated with CLIN 0028. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0029
FFP
Growth Reservation Associated with CLIN 0029. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0030
FFP
Growth Reservation Associated with CLIN 0030. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0031
FFP
Growth Reservation Associated with CLIN 0031. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0032
FFP
Growth Reservation Associated with CLIN 0032. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0033
FFP
Growth Reservation Associated with CLIN 0033. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Growth Reservation for CLIN 0034
FFP
Growth Reservation Associated with CLIN 0034. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Incentive Reservation for CLIN 0035
FFP
Incentive Reservation Associated with CLIN 0035. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Incentive Reservation for CLIN 0036
FFP
Incentive Reservation Associated with CLIN 0036. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Incentive Reservation for CLIN 0037
FFP
Incentive Reservation Associated with CLIN 0037. See attachment J-4.
See Notes A - F FOB: Destination
Incentive Reservation for CLIN 0038
FFP
Incentive Reservation Associated with CLIN 0038. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Incentive Reservation for CLIN 0039
FFP
Incentive Reservation Associated with CLIN 0039. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Incentive Reservation for CLIN 0040
FFP
Incentive Reservation Associated with CLIN 0040. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Incentive Reservation for CLIN 0041
FFP
Incentive Reservation Associated with CLIN 0041. See attachment J-4.
See Notes A, B and D - F FOB: Destination
OPTION Incentive Reservation for CLIN 0042
FFP
Incentive Reservation Associated with CLIN 0042. See attachment J-4.
See Notes A - F FOB: Destination
Incentive Reservation for CLIN 0043
FFP
Incentive Reservation Associated with CLIN 0043. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Incentive Reservation for CLIN 0045
FFP
Incentive Reservation Associated with CLIN 0045. See attachment J-4.
See Notes A, B and D - F FOB: Destination
Incentive Reservation for CLIN 0046
FFP
Incentive Reservation Associated with CLIN 0046. See attachment J-4.
See Notes A, B and D - F FOB: Destination
OPTION Incentive Reservation for CLIN 0048
FFP
Incentive Reservation Associated with CLIN 0048. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Incentive Reservation for CLIN 0069
FFP
Incentive Reservation Associated with CLIN 0069. See attachment J-4.
See Notes A - F FOB: Destination
OPTION Incentive Reservation for CLIN 0071
FFP
Incentive Reservation Associated with CLIN 0071. See attachment J-4.
See Notes A - F FOB: Destination
OPTION SA 85154k, Int Ship Control Install
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F
FOB: Destination
OPTION Growth Reservation for CLIN 0086
FFP
Growth Reservation Associated with CLIN 0086. See attachment J-4.
See Notes A, B, & D-F
OPTION Incentive Reservation for CLIN 0087
FFP
Incentive Reservation Associated with CLIN 0087. See attachment J-4.
See Notes A, B, & D-F
OPTION SA 85154K, LHD SCS Mod, AIT Spt Svc
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A-F
OPTION Growth Reservation for CLIN 0089
FFP
Growth Reservation Associated with CLIN 0086. See attachment J-4.
See Notes A-F
TYCOM Rudder Work
FFP
PREPARE FOR AND ACCOMPLISH REPAIR AND ALTERATIONS
ONBOARD USS BOXER (LHD 4) DURING FY25 SELECTED RESTRICTED
AVAILABILITY (SRA) (Non-prorated WIs – See attachment J-4 for list)
The Contractor shall prepare for and accomplish repair and alterations during the Selected Restricted Availability (SRA) onboard USS Boxer (LHD 4) as specified in the statement of work provided herein and in accordance with standard items, work item specification package drawings, test procedures, and other detailed data as included in Attachments J-1 and J-2.
See Notes A, B, & D-F
Growth Reservation for CLIN 0091
FFP
Growth Reservation Associated with CLIN 0091. See attachment J-4.
See Notes A, B, & D-F
OPTION Growth Reservation for CLIN 0091
FFP
Growth Reservation Associated with CLIN 0091. See attachment J-4.
See Notes A-F
Incentive Reservation for CLIN 0092
FFP
Incentive Reservation Associated with CLIN 0092. See attachment J-4.
See Notes A,B, D-F
OPTION Delivery Incentive
FFP
The amount of any incentive payable to the contractor, pursuant to the Section B Special Incentive clause, shall be evaluated and determined in accordance with the procedures set forth in Tables 1 & 2. The total maximum amount available pursuant to this incentive is $15,000,000.
See Notes A-F
A. General The USS BOXER’s (LHD 4) maintenance and modernization is required at prescribed intervals within its life cycle to sustain its safety and tactical integrity for extended periods of deployment. The goal of this availability is to complete the work required within the USS BOXER’s FY25 Selected Restricted Availability on time and return the ship back to the Fleet as scheduled so that the vessel can perform assigned missions and continue to be an operating asset to the Navy.
The ability to maintain the USS BOXER FY25 Selected Restricted Availability within its solicited schedule is paramount to maintaining the Navy’s operating fleet. In order to attain this goal, it is in the Government’s best interest to incentivize contractor performance, and to reward contractor efforts that substantially contribute to obtaining superior performance and overcoming execution delays and challenges within schedule. Therefore, the Government is interested in incentivizing the completion of the availability in a manner reasonably expected to lead to this outcome.
The delivery of USS BOXER on or before 5 August 2026 is of paramount importance to the Navy. In order to attain this goal, it is in the Navy’s best interest to incentivize Contractor delivery, as follows, by rewarding the Contractor, under CLIN 0004-0034, 0086, 0089 & 0091 for achieving the following milestones:
Table 1: Incentive Earned Calculation
CLIN/
SLIN
Event #
Milestone Event/ Achievement
Milestone Date
Maximum Incentive Available
Schedule Adjustment Factor
Incentive Earned
0004- 0034/0086 /0089/
Complete Availability
5 August 2026
$15,000,000 xSchedule Adjustment Factor
TBD
Total Maximum Incentive Available $15,000,000 TBD
B. Incentive Available The amount of any incentive payable to the Contractor, pursuant to this clause, shall be determined in accordance with Table 2. The total maximum incentive available pursuant to this note is $15,000,000.
C. Incentive Evaluation To be eligible for any incentive herein, the Contractor shall deliver the USS BOXER on or before 5 August 2026.
The incentive available will not change as a result of growth and new work.
Table 2: Schedule Adjustment Factor MILESTONE: Complete Availability SCHEDULE ADJUSTMENT FACTOR
Achieve Milestone Schedule Date 100% 1 to 7 day delay (within 1 weeks) 90%
8 to 14 day delay (between 1 and 2 weeks) 80% 15 to 21 day delay (between 2 and 3 weeks) 70% 22 to 28 day delay (between 3 and 4 weeks) 60% 29 to 35 day delay (between 4 and 5 weeks) 50% 36 to 42 day delay (between 5 and 6 weeks) 40%
43 and 49 day delay (between 6 and 7 weeks) 30% 50 to 56 day delay (between 7 and 8 weeks) 20%
57 to 63 delay (between 8 and 9 weeks) 10% Greater than a 67 day delay (greater than 9 weeks) 0%
D. Finality Determination of the Performance Incentive The determination of the amount of the Performance Incentive, if any, to be paid to the Contractor is a unilateral decision made solely at the discretion of the PCO.
E. Changes to the DETERMINATION OF SPECIAL INCENTIVE language Any changes to the language, terms or conditions associated with this incentive shall only be authorized by the PCO.
NOTE A: LEVEL OF EFFORT TO COMPLETION –SHIP REPAIR
1. The Contractor agrees to provide the level of effort to completion (LOE to Completion) in the performance of growth CLINs in the execution of the USS BOXER FY25 SRA:
a. 140,89149,007 direct labor hours (labor hours) and $5,237,858 ($TBD fully burdened) materials to complete expected, within scope growth work on the USS BOXER FY25 SRA work package under CLINs 0035 – 0071, 0087, 0090, 0092 & 0093.
2. The total LOE to Completion for the performance of the above growth CLINs shall be comprised of labor hours and the associated material required to support the expected, within scope growth. The mix of labor hours and material may be adjusted. Adjustments to the labor hour and material mix will be documented via weekly Technical Direction Letter (TDL) and subsequently unilaterally adjusted via contract modification. The Government reserves the right to reconcile the weekly TDLs via unilateral modification at the Administrative Contracting Officer’s (ACO) discretion.
3. LOE to Completion obligations specified above shall only include effort performed in direct support of this contract and shall not include time and effort expended on such things as local travel to and from an employee's usual work location, uncompensated effort while on travel status, truncated lunch periods, work (actual or inferred) at an employee's residence or other non-work locations.
4. LOE to Completion labor hours and material are within the scope and pricing of this contract and are not subject to an equitable adjustment under FAR 52.243-1 ‘Changes – Fixed Price’. The utilization of LOE to Completion is at the discretion of the Contracting Officer and subject to the schedule phasing identified in Note F.
5. If, in the opinion of the Contractor, any effort directed in the Growth Management Request Form (GMR) calls for effort outside the scope of the contract, the Contractor shall notify the Administrative Contracting Officer (ACO) in writing within two (2) working days after the receipt of any such direction. In the event of a cost dispute, the ACO may unilaterally authorize hours and material against LOE work. The Contractor shall not proceed with the work directed by the GMR unless and until the Contractor is notified by the ACO to proceed with the directed work. The Contractor is required to proceed with the directed work as directed by the ACO.
Thereafter, any remaining disagreement shall be addressed in accordance with FAR 52.233-1(Alt. 1) ‘Disputes.’
Additionally, if the cost of performing the disputed direction exceeds $100,000, the Contractor is required to comply with FAR 52.243-6 ‘Change Order Accounting.’
6. The labor hours and material requirements listed in Section B, Note A, paragraph 1 above are part of this contract. Prime contractor efforts shall be deducted from the labor hours allocated. Subcontractor efforts and materials shall be deducted from the materials allocated. The balance of labor hours and materials remaining in the LOE to Completion CLINs will be recouped by the Government via final contract modification at the end of the availability.
7. Only authorized direct production labor hours shall be deducted from the LOE to Completion direct labor hour ceiling set forth in Section B, Note A, paragraph 1 above. Per Note B paragraph 2 below, all non-production labor shall be included in the Contractor’s fully burdened labor rate. Non-production hours shall not be included in pricing submitted in support of growth issued under the LOE to Completion CLINs. Additionally, Contractor LOE to Completion pricing shall not include any allowance for technical representatives or for any other Government directed source unless specifically directed by the Contracting Officer.
8. Only authorized material dollars shall be deducted from LOE to Completion material reservation set forth in
Section B, Note A, paragraph 1 above. This material reservation consists of the total cost of materials and subcontractor efforts proposed. All subcontractor quotes shall be included in the Change Order Price Analysis (COPA) as per Section C, paragraph 1.13. Material dollars may include freight or duties if specifically itemized on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the settled cost of materials deducted from the material reservation.
9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price.
This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials. Each directed work shall receive approval by the SUPERVISOR and the ACO. “SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.
NOTE B: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND
NEW WORK
SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)
1. The Contractor’s fully burdened ship repair labor rate will be used for negotiating growth; and new work to be performed under this contract. The contractor agrees that the number of hours included in its price proposal submitted in response to Requests for Contract Changes (RCCs), Growth Management Requests (GMRs) and Reservation Task Requests (RTRs) shall include only direct production hours. For these purposes, direct production hours are for skilled labor at the journeyman level expended in direct production including but not limited to the following functions:
Abrasive cleaning/blasting Fire Watch
Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Rigging General Labor Staging/Scaffolding Diesel Mechanics
2. The fully burdened ship repair labor rate proposed by the contractor listed in paragraph 7 below shall include all costs associated with support functions (whether charged directly or indirectly by the offeror’s accounting systems) provided in support of the direct production functions listed in paragraph 1 above. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production hours. Labor hours for the below support functions shall not be separately proposed, including in support of subcontractors. Support functions include, and are not limited to, those types listed below:
Testing Quality Assurance Execution Planning Cleaning (except tank cleaning) Supervision (all types, including, but not limited to supervision of trades, support personnel and subcontractors) Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Handling & Warehousing Safety/Environmental Program Management
3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, (i.e. straight time, overtime, shift differential, holiday time, etc.), overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc., that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened ship repair labor rate and not separately priced.
5. Physical materials are goods that become incorporated into the repaired vessel in the course of the repair, such as replacement steel, pipes, paint, and fasteners. The material burden rate applies to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material. Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.
6. For growth and new work contract changes involving subcontractors, subcontractor quotes will be treated as
Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor (competitive quotes if required by the ACO) quotes must be submitted with the contractor’s COPA in response to RCCs, GMRs and RTRs issued by the Contracting Officer. For new work only, these subcontractor quotes must be competitively acquired. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs), Government directed subcontractors, and/or Government authorized vendors. RCCs and RTRs that are subcontracted for material only (no associated labor required within the RCC) shall not be subject to the Material Burden Rate. Any material burden rate applied to new work shall be approved by the ACO, upon receipt of supporting documentation in accordance with FAR 15.404-3, Subcontract Pricing Considerations.
7. The contract fixed fully burdened ship repair labor rate and material burden rate are shown below. These fixed rates shall be used for negotiating growth, and new work during the availability and up to three (3) months after the Attachment J-3 ‘Contract Complete’ date:
USS BOXER FY25 SRA
Fully Burdened Ship Repair Labor Rate TBD Material Burden Rate TBD
8. In the event of a one-bid or directed availability, the Contracting Officer may negotiate the Fully Burdened
Ship Repair Labor Rate and Material Burden Rate (not to exceed the ceiling rate(s) identified above) with the offeror in accordance with FAR 15.4, Contract Pricing. The rates herein are not considered a Forward Pricing Rate Agreement (FPRA) and are identified solely for the purpose of establishing a ceiling.
9. In the event of an extension due to excusable delay to the delivery date for the USS BOXER FY25 SRA, the Contractor’s fully burdened ship repair labor rate shall be escalated by 0.41 % commencing 3 months after the Attachment J-3 “Contract Complete” date.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .