Attachment S-4 Manpower Performance Data Sheet.xlsx

XLSX spreadsheet 577 KB Posted

Attached to
USS BOXER (LHD 4) FY25 Selected Restricted Availability
Solicitation number
N0002424R4425
Issued by

About this file

This document is an attachment titled "Attachment S-4 Manpower Performance Data Sheet.xlsx" related to a federal contract opportunity for the USS BOXER (LHD 4) FY25 Selected Restricted Availability. The attachment requires offerors to provide monthly EV project-level data, including ACWP, ETC, BCWP, and BCWS, for all projects ongoing or completed between October 2022 and August 2026. The attachment provides detailed instructions on how to fill out the data sheet, including definitions of key earned value management terms. Offerors are required to provide this data to demonstrate their capabilities in accordance with Factor 2, Subfactor A of the solicitation. The related federal contract opportunity is solicitation N00024-24-R-4425 issued by the Naval Sea Systems Command for the USS BOXER (LHD 4) FY25 Selected Restricted Availability, which includes maintenance, modernization, and repair work. The government anticipates making a single award on or around December 2024, with the work beginning in April 2025 and completing in August 2026.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Monthly EV

Project level data IAW Factor 2, Subfactor A (Section L, Para V.B.2.a.): OFFERORS MUST PROVIDE DATA, FROM PROJECT START TO PROJECT COMPLETE, FOR ALL PROJECTS ONGOING OR COMPLETED BETWEEN THE WEEK COMMENCING 10/01/2022 & CONCLUDING 8/06/2026.FYFY 2023FY 2024FY 2025FY 2026
MonthOct-22Nov-22Dec-22Jan-23Feb-23Mar-23Apr-23May-23Jun-23Jul-23Aug-23Sep-23Oct-23Nov-23Dec-23Jan-24Feb-24Mar-24Apr-24May-24Jun-24Jul-24Aug-24Sep-24Oct-24Nov-24Dec-24Jan-25Feb-25Mar-25Apr-25May-25Jun-25Jul-25Aug-25Sep-25Oct-25Nov-25Dec-25Jan-26Feb-26Mar-26Apr-26May-26Jun-26Jul-26Aug-26Sep-26
Month Start

Simei: Change as required to match EVM reporting timeframe.

To include the full availability duration for all projects not yet completed that fall before the first month identified in Attachment S-4 (Oct 2022), type the 1st of the month for the corresponding FY. Subsequent dates will adjust accordingly.10/1/2211/1/2212/1/221/1/232/1/233/1/234/1/235/1/236/1/237/1/238/1/239/1/2310/1/2311/1/2312/1/231/1/242/1/243/1/244/1/245/1/246/1/247/1/248/1/249/1/2410/1/2411/1/2412/1/241/1/252/1/253/1/254/1/255/1/256/1/257/1/258/1/259/1/2510/1/2511/1/2512/1/251/1/262/1/263/1/264/1/265/1/266/1/267/1/268/1/269/1/2610/1/26
Month End

Simei: Change as required to match EVM reporting timeframe.

The defualt end is the last day of the month.10/31/2211/30/2212/31/221/31/232/28/233/31/234/30/235/31/236/30/237/31/238/31/239/30/2310/31/2311/30/2312/31/231/31/242/29/243/31/244/30/245/31/246/30/247/31/248/31/249/30/2410/31/2411/30/2412/31/241/31/252/28/253/31/254/30/255/31/256/30/257/31/258/31/259/30/2510/31/2511/30/2512/31/251/31/262/28/263/31/264/30/265/31/266/30/267/31/268/31/269/30/2610/31/26
Cumulative HoursWorking Days (Calculated) ->
Simei: Calculates the the # of working days for given month using provided Month Start/End and Holidays dates.21

Simei: Formula: Calculate Net Work days in month and subtracts Holidays

=NETWORKDAYS(F3,F4,'Holiday Calendar'!$A:$A)22222220232023222123212222212321212223202322212321222320212222212321222320232220222221222321222221
-
Project 1Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 1Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 1Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 1Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 1Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 2Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 2Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 2Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 2Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 2Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 3Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 3Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 3Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 3Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 3Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 4Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 4Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 4Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 4Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 4Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 5Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 5Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 5Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 5Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 5Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 6Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 6Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 6Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 6Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 6Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 7Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 7Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 7Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 7Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 7Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 8Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 8Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 8Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 8Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 8Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 9Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 9Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 9Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 9Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 9Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 10Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 10Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 10Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 10Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 10Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 11Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 11Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 11Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 11Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 11Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 12Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 12Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 12Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 12Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 12Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 13Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 13Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 13Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 13Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 13Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 14Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 14Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 14Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 14Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 14Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 15Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 15Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 15Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 15Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 15Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 16Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 16Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 16Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 16Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 16Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 17Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 17Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 17Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 17Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 17Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 18Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 18Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 18Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 18Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 18Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 19Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 19Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 19Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 19Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 19Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 20Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 20Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 20Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 20Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 20Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 21Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 21Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 21Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 21Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 21Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 22Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 22Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 22Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 22Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 22Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 23Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 23Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 23Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 23Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 23Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 24Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 24Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 24Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 24Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 24Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 25Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 25Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 25Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 25Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 25Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 26Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 26Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 26Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 26Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 26Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 27Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 27Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 27Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 27Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 27Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 28Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 28Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 28Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 28Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 28Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 29Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 29Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 29Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 29Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 29Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Project 30Project Name (Replace)ACWP from Actual / Forecast Start Date to Time-Now (Fill in current Period Hours) ->0ACWP
Project 30Project Name (Replace)ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0ETC
Project 30Project Name (Replace)Remaining Growth ETC to Actual / Forecast Completion Date (Fill in current Period Hours) - >0GROWTH ETC
Project 30Project Name (Replace)BCWP from Contract Start Date to Time-Now (Fill in current Period Hours) ->0BCWP
Project 30Project Name (Replace)BCWS from Contract Start Date to Contract Completion Date (Fill in current Period Hours) ->0BCWS
-
Offeror may add or delete project fields, as necessary. Directions to add project fields: Step 1: Select rows 179-184-> Step 2: Copy-> Step 3: Right Click Row 185-> Step 4: Insert Copied Cells. Repeat Steps 1-4 as necessary (increase row reference by 6 each time).
*Note: The Navy understand that Growth Options are not authorized work. Growth Options are not yet exercised.

Cumulative EV

*Provide cumulative EVM in production hours. **Offeror may add or reduce project and/or growth fields, as required. ***Note: The Navy understand that Growth Options and New Work are not authorized work. Growth Options are not yet exercised and New Work reflect estimates.*Contract Start of Project*Contract Completion of Project*Actual or Scheduled Start of Project*Actual or Scheduled Completion of Project*The status of the project, either: Completed, In-Progress, Awarded, Proposed or Anticipated.*Budget At Complete (BAC). The total production budget. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Estimate at Complete (EAC). The total estimated production hours spent at completion. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Budget Cost of Work Scheduled (BCWS). The total production budget scheduled up until "time-now". This value must align to the sum of the Timephased BCWS during the historical range prior to "time-now".*Budget Cost of Work Performed (BCWP). The total production budget earned. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Budget To Complete (BTC). The total production budget remaining. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Actual Cost of Work Performed (ACWP). The total production hours spent. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Estimate to Complete (ETC). The total estimated production hours remaining. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Estimate to Complete (ETC) the Remaining Growth Options. **Verify the cumulative hour values calculated align with internal earned value information. If the cumulative calculation does not align with the internal earned value information, then enter the value manually and “Insert Comment” to the manually adjusted cell that describes the discrepancy.*Cost Performance Index (CPI). CPI = BCWP/ACWP*To-Complete Cost Performance Index (TCPI). TCPI = BTC/ETC*Schedule Performance Index (CPI). SPI = BCWS/ACWS*Performance Based ETC is auto-calculated by applying the CPI to the BTC. Perfmance Based ETC = BTC/CPI
Project #Project NameContract Start DateContract Completion DateActual / Forecast Start DateActual / Forecast Completion DateProject StatusBACEACBCWSBCWPBTCACWPETCGROWTH ETCCPITCPISPIPerformance Based ETC
Project 1Project Name (Replace)[Enter Date][Enter Date][Enter Date][Enter Date][Enter Project Status]00[Enter BCWS at Time-now]00000----
Project 2Project Name (Replace)0000000----
Project 3Project Name (Replace)0000000----
Project 4Project Name (Replace)0000000----
Project 5Project Name (Replace)0000000----
Project 6Project Name (Replace)0000000----
Project 7Project Name (Replace)0000000----
Project 8Project Name (Replace)0000000----
Project 9Project Name (Replace)0000000----
Project 10Project Name (Replace)0000000----
Project 11Project Name (Replace)0000000----
Project 12Project Name (Replace)0000000----
Project 13Project Name (Replace)0000000----
Project 14Project Name (Replace)0000000----
Project 15Project Name (Replace)0000000----
Project 16Project Name (Replace)0000000----
Project 17Project Name (Replace)0000000----
Project 18Project Name (Replace)0000000----
Project 19Project Name (Replace)0000000----
Project 20Project Name (Replace)0000000----
Project 21Project Name (Replace)0000000----
Project 22Project Name (Replace)0000000----
Project 23Project Name (Replace)0000000----
Project 24Project Name (Replace)0000000----
Project 25Project Name (Replace)0000000----
Project 26Project Name (Replace)0000000----
Project 27Project Name (Replace)0000000----
Project 28Project Name (Replace)0000000----
Project 29Project Name (Replace)0000000----
Project 30Project Name (Replace)0000000----
YardYard Wide00000000----
Offeror may add or delete project fields, as necessary. Directions to add project fields: Step 1: Select row 32-> Step 2: Copy-> Step 3: Right Click Row 33-> Step 4: Insert Copied Cells. Repeat Steps 1-4 as necessary (increase row reference by 1 each time).
*Note: The Navy understand that Growth Options are not authorized work. Growth Options are not yet exercised.

Holiday Calendar List holidays (within the specified time range) in the cells in column A

Definitions

Remaining Growth Options – The number of unused and unexercised growth hours, time phased over usage rates prescribed in Section B Note F.
New Work – The number of unused New Work hours, time phased over usage rates using the same phasing as assumed for growth from Section B Note F.
Prime Contractor Labor – Laborers hired by the prime contractor to perform as an agent of the prime without a specific employment end date.
Overtime Labor – Labor provided by employees covered by the Fair Labor Standards Act in excess of 40 hours in a work week
Subcontractor Labor – Subcontractors are labor provided by a company contracted by the prime contractor to perform as an independent contractor and not as an agent of the prime to deliver a product or service by a specified deadline.
Temporary Labor –Laborers contracted by the prime contractor to perform as an agent of the prime to work for one year or less with a specific end date. The prime contractor may directly hire temporary labor or through a third-party employment agency.
Full Time Equivalents (FTE) – A normalized representation of full-time workers based on the number of hours spent/scheduled during a finite period of time. An FTE unit assumes an 8-hour work day and a 5-day work week (Monday-Friday) except when accounting for holidays. For example, if the hours spent or scheduled during a week with one holiday was 160 hours, then the FTE value representing that week would be equal to 5 FTE (160 hours divided by 8-hour days divided by 4 works days equals 5 FTE).
Time-now – The latest date within a dataset containing historical values such as actuals or earnings (ACWP & BCWP). Time-now must be no earlier than the date of RFP release.
Cumulative Earned Value – the cumulative earned values as of Time-now
Time-phased Earned Value – periodic allocations of earned values representing work scheduled/earned/spent/or estimated during a given period of time
Contract Start Date – The contractually agreed start of contractor project execution.
Contract Completion Date - The contractually agreed contractor completion date
Actual / Forecast Start Date – The date the project started (if the project started prior to the last date identified in Attachment S-4) or the contractor’s estimated start date (if expected to occur after the last date identified in Attachment S-4)
Actual / Forecast Completion Date - The date the project completed (if project completed prior to last date identified in Attachment S-4) or the contractor’s currently estimated completion date.
Project Status – The status of a project either: completed, in-progress, awarded, proposed, or anticipated.
Budget at Complete (BAC) – The total budgeted production hours earned at completion of the project. The BAC equals the cumulative BCWP plus the cumulative BTC.
Estimate at Complete (EAC) – The total estimated production hours spent at completion of the project. The EAC equals the cumulative ACWP plus the cumulative ETC.
Budgeted Cost of Work Scheduled (BCWS) – The scheduled completion of budgeted weekly production work. The sum of the weekly BCWS values equals the BAC.
Budgeted Cost of Work Performed (BCWP) - The measurement of the budgeted weekly production work completed, BCWP is the value of work performed, or “earned,” by both prime and subcontractor within a week.
Budget to Complete (BTC) - The budgeted total production hours remaining to complete the project.
Actual Cost of Work Performed (ACWP) – The production hours actually incurred and recorded, prime and subcontractor. The offeror may estimate actual subcontracting hours based on prime contractor outlays.
Estimate to Complete (ETC) – The estimated total production hours remaining to complete the project.
Cost Performance Index (CPI) - An index representing the cumulative production labor efficiency realized for the earned budget of a project. The CPI equals the BCWP divided by the ACWP.
To-Complete Cost Performance Index (TCPI) – An index representing the production labor efficiency required of the remaining budget to achieve the project’s EAC. The TCPI the BTC divided by the ETC.
Schedule Performance Index (SPI) – An index representing the cumulative schedule adherence for a project. The SPI equals the BCWP divided by the BCWS.

Manpower Charts Format

Requirements for all 4 Manpower Charts required in:
(Section L, Factor 2 - Resource Capacity & Schedule, Emphasis Area A - Manpower, Manpower Charts)
1. A Time-now line must be included that separates Historical FTE (ACWP) from Forecasted FTE (ETC)
a) ACWP FTE values are charted to the left of Time-now
b) ETC FTE values are charted to the right of Time-now
2. The chart must align with the data provided in Attachment S-4
3. Offerors shall clearly delineate prime and subcontractor FTE, even though this is not a requirement of Attachment S-4.
4. Growth Work options shall be totaled for each set of project curves required and displayed as a single curve within each chart.
5. Sand chart layers representing Subcontracting must all be same color of light gray
6. Sand chart layers representing Growth Work Options must all be same color of dark gray
7. Two additional FTE lines representing ACWP / ETC values must be plotted for:
a) Prime labor (FTE)
b) Prime labor + Subcontractor labor (FTE)
c) Prime labor + Subcontractor labor + Temp labor FTE
1. The top of the sand chart layers must align with the “Prime labor + Subcontractor labor + Temp labor (FTE)”

image1.png

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .