N00024-21-R-4478_A0003_BQ 102-108.pdf

PDF 226 KB Posted

Attached to
USS PINCKNEY (DDG-91) FY22 Depot Modernization Period (DMP) Amendment A0005
Solicitation number
N00024-21-R-4478
Issued by

View the file

Other files

File Type Posted
USS PINCKNEY N0002421R4478_A0005.pdf PDF
USS PINCKNEY N0002421R4478_A0005_CONFORMED.pdf PDF
USS PINCKNEY N0002421R4478_A0004_CONFORMED.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 20.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 19.pdf PDF
USS PINCKNEY N0002421R4478_A0004.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 18.pdf PDF
Attachment J-8 Government Furnished Material (GFM) List (Rev 2).xlsx XLSX spreadsheet
N00024-21-R-4478_A0004_BQ 109-122.pdf PDF
USS PINCKNEY N0002421R4478_A0003_CONFORMED.pdf PDF
USS PINCKNEY N0002421R4478_A0003.pdf PDF
USS PINCKNEY N0002421R4478_A0002.pdf PDF
N00024-21-R-4478_A0002_BQ 60-101.pdf PDF
USS PINCKNEY N0002421R4478_A0002_CONFORMED.pdf PDF
Attachment J-10 (Open-Inspect Milestone Reports Due) (Rev1).xlsx XLSX spreadsheet
USS PINCKNEY N0002421R4478_A0001 CONFORMED.docx DOCX document
Attachment J-8 (GFM List) (Rev1).xlsx XLSX spreadsheet
N00024-21-R-4478_A0001_BQ 1-59.pdf PDF
USS PINCKNEY N0002421R4478_A0001.docx DOCX document
Attachment J-5 (QASP).pdf PDF
Attachment S-7 (Proposal Assessment).xlsx XLSX spreadsheet
CDRL Exhibit C.pdf PDF
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment S-3 (PPI Form).xlsx XLSX spreadsheet
Attachment J-10 (Open and Inspect).xlsx XLSX spreadsheet
Attachment J-7 (Schedule Model Review).pdf PDF
N0024-21-R-4478.pdf PDF
CDRL A016 Enc (1) End of Avail Report.xlsx XLSX spreadsheet
CDRL Exhibit A.pdf PDF
CDRL A017 Encl (1) Monthly Manning Report.xlsx XLSX spreadsheet
CDRL Exhibit B.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: N00024-21-R-4478 USS PICNKEY (DDG-91) FY22 DMP NAVSEA POC: Lee Hutchinson, diana.l.hutchinson@navy.mil, (571) 970-8390

Danene Henry, danene.henry@navy.mil, (202) 781-1445

Master # Question Area Section / Para # Contractor Question Government Response

102 J-1 (Work Spec Package) 438-90-002

Several material line items of ref 2.3 438-8848560 REV A have been quoted to KTR with lead times upwards of 65 to 87 weeks by multiple suppliers. KTR is requesting the following pc No.s be provided as GFM; PC CA107, CA108, CA109, CA111, CA113

The parts identified by the KTR (PC CA107, CA108, CA109, CA111, CA113) are included in the kitted material specified in para 5.3. of the work item.

103 J-1 (Work Spec Package) 635-11-001 E5

There is no universal size for cases of Flat K-Flex 36" x 48" (1/2 IN and 3/4 IN respectively).

Please provide specific case size or total square footage of insulation needed.

Total square footage is 1920 Square Feet each.

104 J-1 (Work Spec Package) 523-80-001

Reference has not been received. Please provide:

2.12 A005-690, CDRL, SFGD PRESSURIZATION OF DLS SPR -

ShipAlt 51-75309 for DDG 91 Only

Missing reference(s) will be available upon request.

Please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.mil respectively.

105 J-1 (Work Spec Package) 542-21-001

Reference has not been received. Please provide:

2.2 0947-LP-246-5010, Change 2, Helicopter Defueling Pump BXL

1-1/4 NFDM

Missing reference(s) will be available upon request.

Please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.mil respectively.

106 J-2 (References) 471-90-001

Work Item 471-90-001 "ShipAlt DDG51-79521K, AN/SLQ-32(V)7 Hardware; accomplish (OPTION ITEM)" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.35, and 2.57 through 2.79, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3." (E15)

• Paragraph 2.70 identifies, "RLAR 79521/DDG91/1197901 , Adds a Parking Plate in Each Sponson for Bridge Wing Camera Maintenance (E14)"

• Paragraph 2.72 identifies, "RLAR 79521/DDG91/1198023, Deletes Detail for New Radar 1 Overhead Fans Resilient Mounts Because They Will Be Supplied With GFM (E14)"

• Paragraph 2.73 identifies, "RLAR 79521/DDG91/1198058, Adds Missing Bolts/Washers/Nuts for ASEA Cabinet Isolators (E14)"

• Paragraph 2.76 identifies, "RLAR 79521-DDG91-1198250, LCU Waterflo mtr 8 gpm Scale (E15)"

On 04/01/21, the contractor requested that all references associated with Errata's 14 thru 16 specification changes be provided IAW the directions on the beta.SAM website for Amendment 0001 to the USS Pinckney (DDG-91) FY22 DMP solicitation. The contractor subsequently received (2 EA) DoD SAFE drops with references, but the four references listed above were not +F42:F44

Missing reference(s) will be available upon request.

Please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.mil respectively.

107 J-2 (References) 411-90-002

Work Item 411-90-002 "ShipAlt DDG51-89804K, AWS:

ACB16/TI16 OA Computing Plant; accomplish" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.21, 2.29 through 2.33, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3." (E15)

• Paragraph 2.31 identifies, "RLAR 89804/DDG89/1197318, Modify ECW Piping in AUX NO 1." (E15)

On 04/01/21, the contractor requested that all references associated with Errata's 14 thru 16 specification changes be provided IAW the directions on the beta.SAM website for Amendment 0001 to the USS Pinckney (DDG-91) FY22 DMP solicitation. The contractor subsequently received (2 EA) DoD SAFE drops with references, but the reference 2.31 listed above was not included.

Bidder's Questions:

1) Please provide the missing reference 2.31 identified above.

Missing reference(s) will be available upon request.

Please contact the Southwestern Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is Sonia Moran, at sonia.moran@navy.mil, (619-556-3458). On all communications regarding requests for missing references Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.mil respectively.

108 RFP

III. GENERAL INFORMATION

A. Ship Checks:

1. The USS PINCKNEY (DDG 91) will be available for ship check prior to the proposal submission due date in San Diego, CA, from 22 February 2021 to 28 February 2021.

2. To schedule a ship check, Offerors shall email a "Request for Ship Check" to Diana L Hutchinson and Jackie Black at diana.l.hutchinson@navy.mil and jacqueline.black@navy.mil, respectively. Due to the ship location, additional information will be provided upon request.

3. Participants will be subject to security, safety, and other applicable regulations established by Southwest Regional Maintenance Center (SWRMC) and ship’s Commanding Officers.

Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:

a) http://www.navsea.navy.mil/Home/RMC/swrmc/Visitor- Information/ b) https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_s an_diego/om/force_protection/pass_and_decal.html

On 02/23/21 (Tue) @ 0720 the USS Pinckney RFP, J-5, J-7, J-8, J-10, S-3, S-7, and CDRLs were received from the bet.SAM website; on 02/23/21 (Tue) @ 1405 controlled documents J-3, J-4, J-9, S-5, and S-5 Encl (1) were received from the beta.SAM website; on 02/23/21 (Tue) @ 1417 the J-1 Basic specification package (with

Another shipcheck window is not possible at this time.