Attachment S-7 (Proposal Assessment).xlsx

XLSX spreadsheet 14 KB Posted

Attached to
USS PINCKNEY (DDG-91) FY22 Depot Modernization Period (DMP) Amendment A0005
Solicitation number
N00024-21-R-4478
Issued by

View the file

Other files

File Type Posted
USS PINCKNEY N0002421R4478_A0005.pdf PDF
USS PINCKNEY N0002421R4478_A0005_CONFORMED.pdf PDF
USS PINCKNEY N0002421R4478_A0004_CONFORMED.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 20.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 19.pdf PDF
USS PINCKNEY N0002421R4478_A0004.pdf PDF
TPPC-DDG91-SWRMC22-CN01 - ERRATA 18.pdf PDF
Attachment J-8 Government Furnished Material (GFM) List (Rev 2).xlsx XLSX spreadsheet
N00024-21-R-4478_A0004_BQ 109-122.pdf PDF
N00024-21-R-4478_A0003_BQ 102-108.pdf PDF
USS PINCKNEY N0002421R4478_A0003_CONFORMED.pdf PDF
USS PINCKNEY N0002421R4478_A0003.pdf PDF
USS PINCKNEY N0002421R4478_A0002.pdf PDF
N00024-21-R-4478_A0002_BQ 60-101.pdf PDF
USS PINCKNEY N0002421R4478_A0002_CONFORMED.pdf PDF
Attachment J-10 (Open-Inspect Milestone Reports Due) (Rev1).xlsx XLSX spreadsheet
USS PINCKNEY N0002421R4478_A0001 CONFORMED.docx DOCX document
Attachment J-8 (GFM List) (Rev1).xlsx XLSX spreadsheet
N00024-21-R-4478_A0001_BQ 1-59.pdf PDF
USS PINCKNEY N0002421R4478_A0001.docx DOCX document
Attachment J-5 (QASP).pdf PDF
CDRL Exhibit C.pdf PDF
Attachment J-8 (GFM List).xlsx XLSX spreadsheet
Attachment S-3 (PPI Form).xlsx XLSX spreadsheet
Attachment J-10 (Open and Inspect).xlsx XLSX spreadsheet
Attachment J-7 (Schedule Model Review).pdf PDF
N0024-21-R-4478.pdf PDF
CDRL A016 Enc (1) End of Avail Report.xlsx XLSX spreadsheet
CDRL Exhibit A.pdf PDF
CDRL A017 Encl (1) Monthly Manning Report.xlsx XLSX spreadsheet
CDRL Exhibit B.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L & M Requirements

USS PINCKNEY (DDG 91) FY22 DMPOfferor: [Insert Offeror Name]
SECTION L, IIYes, No
Electronic Submission - Price & Non-Price Proposal- Offerors are instructed to submit proposals electronically via the DoD SAFE application located at https://safe.apps.mil.

- Submitted as one .zip file per ship/proposal, formatted so that each Volume 1 Price Volume and each Volume 2 Technical Volume are submitted in separate file folders clearly marked. Each Volume shall be formatted with separate files submitted for each Factor and Emphasis Area.

- All files uploaded must be scanned to ensure that there are no computer viruses within the file. The files shall be in a format that is compatible with and capable of being opened in the most current Microsoft Office Suite or Adobe Acrobat.

SECTION L, IVYes, No
Electronic Proposal(s) FormatFormatted to 8.5 x 11 inch paper with a one-inch margins.

Text: 12-point Times New Roman font.

SECTION L, V, AYes, No, N/A (if N/A why)
Cover LetterPage limit of 3
Identified all enclosures included with the proposal
CAGE and DUNS numbers, name address and contact information for the Prime contractor
Provided notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).
Provided Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.
Offerors shall affirmatively state whether or not the Offeror has ownership of or committed access to dry dock(s) and pier(s) capable of berthing the DDG 91. If yes, provide the name of dry dock(s) and pier(s) and affirmatively state whether the dry dock(s) and pier(s) are available to bid this solicitation. If the offeror states that a dry dock and pier are not available, provide the details of the awarded contract or dry dock and pier maintenance period that has made the dry dock and pier unavailable (Customer, Contract Number, Vessel (if applicable), Dry Dock and Pier Period of Performance, Scheduled Dry Dock and Pier Maintenance Period)
For any work item (WI) with a total dollar value of zero dollars proposed in the Pricing Workbook (Attachment J-4) provide an explanation as to why. In addition, if applicable:

- For any WI with a total value of zero labor hours proposed (prime and subcontractor combined) (although material is proposed), provide an explanation as to why.

- For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.
Signed SF 33Blocks 12 through 18 completed
All amendments acknowledged
Completed applicable “fill-ins”
Signed by representative authorized to contractually bind the company
Section B CLIN pricing must be completed for ALL APPLICABLE CLINs
Section K Representations, Certifications, and Other Statements provided and completed
Small Business Subcontracting plan per FAR Part 19, Large businesses onlyProvided rationale for any proposed goals that are lower than the statutory requirements outlined in Section L.
Addressed FAR 52.219-9 and all of the subparagraphs in FAR 52.219-9(d)
Joint Venture / teaming agreementsIf applicable
Locality Work Item Deduction NarrativeIf applicable
Completed Section B, Carrying forward information from applicable Pricing WorkbookProposed on all CLINs
Complete all Section B Note fill-ins
Pricing Workbook SpreadsheetWork Item Pricing
Matches Section B CLIN pricing and notes
Daily Extension Rates (For Evaluation Only)
Locality Deduction
IPD
Pricing for all Option Items
Fully Burdened Ship Repair Labor Rate & Material Burden Rate, New Work and Growth Reservation.
Execution Milestones and Key Event DatesApplicable Attachment J-3
Completed Attachment S-7To be responsive, offerors should rely on the solicitation Sections L and M as this may not be a comprehensive list.
SECTION L, V, B, 1SECTION M, III, B
Factor 1 (Eligibility) (Section L)Factor 1 Evaluation Criteria (Section M)Proposal Reference
Provide a completed Eligibility Criteria Data Sheet (Attachment S-5) that identifies the specific dry dock and pier intended to be used for the proposed availability and indicates that the dry dock and pier meet the minimum characteristics identified in Attachment S-5.Provide a completed Attachment S-5 that:

a) Identifies the specific pier(s) and dry-docks intended to be used for the proposed Availability, and

b) Indicates that those pier(s) and dry-docks meet the minimum characteristics of Table 1 on Attachment S-5.

b) Provide a signed letter identifying and confirming ownership of a dry dock and pier capable of berthing the vessel during the applicable period in accordance with the Execution Milestones & Key Events (Attachment J-3). The representative who signs the letter must be authorized to contractually bind the company. If the Offeror is utilizing a subcontractor for physical resources (dry dock and pier), a letter signed by the subcontractor identifying and confirming committed access to the proposed dry dock and pier are required. The subcontractor representative who signs the letter must be authorized to contractually bind the company. The proposed dry dock and pier facility, whether owned by the Offeror or subcontractor, must be accessible by the USS PINCKNEY without any modification to the vessel.

c) Provide a copy of the Offeror's current Master Ship Repair Agreement (MSRA), MSRA number, or proof of MSRA equivalency that meets the requirement of CNRMC instruction 4280 series. To be eligible for award, a prospective contractor must possess a MSRA as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV) or demonstrate organization and facilities equivalent to that reflected in a MSRA. Offerors meeting this eligibility requirement with documents and evidence outside of a MSRA must contact the PCO to schedule an on-site inspection. All requests for MSRA equivalency inspections must be received by 1:00 pm, local time, Washington DC on 19 February 2021. Requests shall be sent to diana.l.hutchinson@navy.mil and jacqueline.black@navy.mil respectively. Failure to request an inspection by the designated time may result in a negative determination of Offeror eligibility.

d) In accordance with the most current version of MIL-STD-1625D, provide a current dry-dock certification applicable to the dry-dock proposed for the Availability. Certifications shall demonstrate the dry-dock will remain certified throughout the entire proposed use of the dry-dock. If the proposed dry-dock is currently uncertified, or if the certification will expire prior to the end of the Offeror's proposed docking period, the Offeror shall provide a detailed plan and schedule to certify or re-certify the dry-dock in order to remain certified throughout the proposed docking period in the Execution Milestones & Key Events (Attachment J-3). 1. Assess whether the Offeror holds a Master Ship Repair Agreement (MSRA) or has demonstrated equivalency as outlined in Section L, subsection V.B.1 Factor 1 - Eligibility.

2. Assess whether the Offeror has ownership or committed access to a dry dock and pier capable of berthing the vessel, in accordance with Section L.