Solicitation #: N00024-21-R-4478 USS PICNKEY (DDG-91) FY22 DMP NAVSEA POC: Lee Hutchinson, diana.l.hutchinson@navy.mil, (571) 970-8390
Danene Henry, danene.henry@navy.mil, (202) 781-1445
Master # Question Area Section / Para # Contractor Question Government Response
Rev 1
J-2 (References) 523-80-001
Work Item 523-80-001 "ShipAlt DDG51-64245D Countermeasure Washdown Bulkhead Penetration Sleeve Installation; accomplish" Paragraph 2.12 identifies, "A005-690, CDRL, SFGD PRESSURIZATION OF DLS SPR - ShipAlt 51-75309 for DDG 91 Only"
This reference was not included on the provided reference disk nor via DoD SAFE drop, an e-mail request for the missing reference was transmitted on Fri 3/19/2021 9:36 AM and is being followed up with this PPI.
Bidder's Question:
1) Please provide ref 2.12 "A005-690, CDRL, SFGD PRESSURIZATION OF DLS SPR - ShipAlt 51-75309 for DDG 91 Only" for work item 523-80-001.
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 643-11-001
Work Item 523-80-001 "ShipAlt DDG51-64245D Countermeasure Washdown Bulkhead Penetration Sleeve Installation; accomplish" Paragraph 2.3 identifies, "331-8565749 Rev C, Habitability Improvement DDG 91 Electrical CPO & Crew Living Spaces Modifications” Paragraph 2.6 identifies, "331-8565753 Rev C, Habitability Improvement DDG 91 Electrical CPO & Crew Sanitary Spaces Modifications”
The wrong revision for these references, Revision B was included on the provided reference disk. An e-mail request for the correct reference revisions was transmitted on Fri 3/19/2021 10:00 AM and is being followed up with this
PPI.
Bidder's Question:
1) Please provide ref 2.3 "331-8565749 Rev C, Habitability Improvement DDG 91 Electrical CPO & Crew Living Spaces Modifications” and ref 2.6 "331-8565753 Rev C, Habitability Improvement DDG 91 Electrical CPO & Crew Sanitary Spaces Modifications”
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) Multiple
Reference 4720-DDG91-FY22, Ship Alteration Material Summary (4720/3) The contractor requests that the above identified reference be provided, it was not included on the reference CD nor in the DoD Safe downloads and this single document is referenced in the following (6 EA) work items. An e-mail request for the missing reference was transmitted on Fri 3/19/2021 11:17 AM and is being followed up with this PPI.
1) Work Item 437-90-001 (E11) “ShipAlt DDG51-77829K, Installation of Radar and Time Domain Reflectometer (TDR) Tank Level Indicator (TLI) for Diesel Fuel Marine (DFM), Jet Propellant-5 (JP-5) and Potable Water Tank; accomplish” as ref 2.8 “4720-DDG91-FY22-SA77829-A6, Ship Alteration Material Summary (4720/3)”.
2) Work Item 468-90-001 (E8) “ShipAlt DDG51-91580K, AN/SQQ-89A(V)15 Tech Refresh; accomplish (OPTION ITEM)” as ref 2.16 “4720-DDG91-FY22, Ship Alteration Material Summary (4720/3)”.
3) Work Item 526-80-001 “DDG51 Class AER 64270, 02 Level Aft Port Weatherdeck Drain; accomplish” as ref 2.5 “4720-DDG91-FY22, Ship Alteration Material Summary (4720/3)”.
4) Work Item 588-90-001 (E11) “DDG51-73212K, Helicopter Hangar Door Control System Upgrade; accomplish” as ref 2.9 “4720-DDG91-FY22, Ship Alteration Material Summary (4720/3)”.
5) Work Item 593-80-001 “DDG51 Class AER-90219, Replace Obsolete Control Panel on Pulper/Shredder, AER-90237, Replace Obsolete Control Panel on Metal/Glass Shredder, and AER-90249 Upgrade Metal/Glass Shredder to the MOD I Configuration; accomplish” as ref 2.6 “4720-DDG91-FY22, Ship Alteration Summary (4720/3) (TBD)” with note 4.1 that states, “4720 has not been issued as of 07July2020.”
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) Multiple
Reference 4720-DDG91-FY21, Ship Alteration Material Summary (4720/3) The contractor requests that the above identified reference be provided, it was not included on the reference CD nor in the DoD Safe downloads and this single document is referenced in the following (24 EA) work items. An e-mail request for the missing reference was transmitted on Fri 3/19/2021 10:47 AM and is being followed up with this PPI.
1) Work Item 262-90-001 (E11) “ShipAlt DDG51-76253K, Install Lube Oil Coalescing Filter; accomplish” as ref 2.11.
2) Work Item 411-90-001 (E11) “ShipAlt DDG51-89925K, AWS: ACB16/TI16 CIC Display Upgrade; accomplish” as ref 2.29.
3) Work Item 411-90-002 (E11) “ShipAlt DDG51-89804K, AWS: ACB16/TI16 OA Computing Plant; accomplish” as ref 2.28.
4) Work Item 438-90-001 (E11) “ShipAlt DDG51-71604K, DDG Mod MCS/DCS Upgrades, Single Central Control Station (CCS) Watchstander; accomplish” as ref 2.24.
5) Work Item 438-90-002 (E6) “ShipAlt DDG51-88260K, Enterprise Remote Monitor Hardware Installation; accomplish (OPTION ITEM)” as ref 2.10.
6) Work Item 438-90-003 (E11) “ShipAlt DDG51-84515K, Remove Remote Minehunting System (RMS); accomplish” as ref 2.21.
7) Work Item 438-90-004 (E11) “ShipAlt DDG51-71726K, DDG Mod Full IBS Upgrade, Single Bridge Watchstander; accomplish” as ref 2.13.
8) Work Item 456-90-001 (E11) “ShipAlt DDG51-89769K, AWS: ACB16/TI16 KAS WDRC Upgrade; accomplish” as ref 2.18.
9) Work Item 456-90-002 (E11) “ShipAlt DDG51-91754K, AWS ACB16/TI16 MMSP Upgrade; accomplish” as ref 2.22.
10) Work Item 471-90-001 (E10) “ShipAlt DDG51-79521K, AN/SLQ-32(V)7 arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) Multiple
Continued from above.
14) Work Item 512-90-002 (E11) “ShipAlt DDG51-74012K, VLS Magazine Ventilation Upgrade; accomplish” as ref 2.37.
15) Work Item 522-90-001 (E11) “ShipAlt DDG51-80255, Replace Magazine Fire Detection System; accomplish (OPTION ITEM)” as ref 2.14.
16) Work Item 541-90-001 (E11) “ShipAlt DDG51-70403K, Digital Fuel Control System Installation; accomplish” as ref 2.9.
17) Work Item 583-90-001 (E11) “ShipAlt DDG51-83894K, Navy Standard Slewing Arm Davit (SLAD) Installation; accomplish” as ref 2.24.
18) Work Item 593-90-001 (E11) “ShipAlt DDG51-73622, VCHT H2S Detector Installation; accomplish” as ref 2.11.
19) Work Item 643-90-001 (E13) “ShipAlt 86821K, Women at Sea Berthing 2, Crew Living Space; accomplish” as ref 2.22.
20) Work Item 651-90-001 (E11) “ShipAlt DDG51-71605K, DDGM Advanced Galley Modification; accomplish” as ref 2.35.
21) Work Item 672-80-001 “ShipAlt DDG51-64241D, Security Force Issue Room Stowage Space Modification; accomplish” as ref 2.9 (TBD) with note 4.1 that states, “4720 has not been issued as of 4 SEP 2020.”
22) Work Item 721-90-001 (E11) “ShipAlt DDG51-91735K, MK41 VLS BLVII DDG (Partial); accomplish” as ref 2.5.
23) Work Item 980-90-009 (E11) “ShipAlt 70403K, 71604K, 71615K, 71726K, 73091K, 77427K, 77829K and 84226K Hull, Mechanical, and Electrical (HM&E) Core ShipAlts, Alteration Installation Team (AIT) Support Service; provide” as ref 2.4.
24) Work Item 980-90-010 (E11) “ShipAlt DDG51-76829K, 76869K, 76974K, 80274K, 82635K, 87103K, 89769K, 89804K, 89925K, 91735K, 91754K, and arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 245-12-003
Contractor requests the following reference:
2.2 S9245-AM-MMA-010 Rev 10, Controllable Pitch Propeller System Model Number 156, Type S1/5, DDG-51 Class
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 251-30-002
Contractor requests the following reference:
2.3 S9234-GB-MMA-010 Rev 5, Moisture Separator/Blow-In Panel Set
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 256-71-001
Contractor requests the following reference:
2.3 S6226-LH-MMO-010 Rev 3, Pump, Titanium, 8 X 6 X 11, Commercial/Marine, Close-Coupled Drawing No. 803-6962398
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 261-21-002
Contractor requests the following reference:
2.2 S6226-DE-MMA-010 Rev 3, Fuel Service Pump Model BXL2 1/2NAFK-NHROVA P/N E-4556
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
Rev 1
J-2 (References) 343-11-001
Contractor requests the following reference:
2.2 S6226-DR-MMA-010, Change B, Model 9N, Ship Service Gas Turbine Generator (SSGTG) Sea Water Circulating Pump
This is a restricted reference. Please contact the MidAtlantic Regional Maintenance Center (MARMC) Southwest Regional Maintenance Center (SWRMC) technical librarian POC to arrange access. This POC is: Timothy Russell. Mr. Russell can be reached at timothy.russell1@navy.mil. Sonia Moran. Ms. Moran can be reached at sonia.moran@navy.mil, (619)-556-3458. On all communications regarding requests for missing restricted references, Offerors shall cc Acquisition Managers, Brad Smith and Jordan Nannah, at bradley.e.smith1@navy.mil, jordan.nannah@navy.mil, as well as Contracting Officer Diana L Hutchinson and Contract Specialist Danene Henry at diana.l.hutchinson@navy.mil and danene.henry@navy.com danene.henry@navy.mil respectively.
60 J-1 (Work Spec Package)
SECTION 3.1, WI NO. 562-
11-001 E1
Paragraph 3.1 states "Accomplish the requirements of 009-90…………….." etc.
Question; why is Tech Rep required for this work item?
Contractor believes this is a typo and that the intention was to call for 009-09
(PCP),
Please review & clarify.
Duplicate of Master PPI #6 - answer provided in Amendment A0001
61 J-1 (Work Spec Package)
243-11-003
243-12-002
Work Item 243-11-003 "Starboard Stern Tube Shaft Seal; overhaul" Paragraph 3.1 states, "Accomplish the requirements of 009-09 009-90 of 2.1 for removal, cleaning, repair, testing and installation of waterborne shafting and components including rigging plan." (E4)
Paragraph 4.1 states, "Known source for Technical Representative and parts:
Wartsila Defense Incorporated"
Work Item 243-12-002 "Port Stern Tube Shaft Seal; overhaul" Paragraph 3.1 states, "Accomplish the requirements of 009-09 009-90 of 2.1 for removal, cleaning, repair, testing and installation of waterborne shafting and components including rigging plan." (E4)
Paragraph 4.1 states, "Known source for Technical Representative and parts:
Wartsila Defense Incorporated"
The contractor suspects that the Errata 04 change of paragraph 3.1 on both 243- 11-003 and 243-12-002 should have been to the entire paragraphs scope of work, not just to delete the 009-09 "Process Control Procedure (PCP); provide and accomplish" and add the 009-90 "Technical Representative; provide" requirement clause without changing paragraphs work scope. The contractor notes that the historical work scope for the Shaft Seal work items the 009-90 paragraph states, "Accomplish the requirements of 009-90 of 2.1 for the services of a qualified technical representative to provide on-site technical assistance, each drawing, special tool and guidance for disassembly, inspection, repair, assembly, testing and adjustment of the equipment listed in 1.3.1 and located in 1.2.1."
Duplicate of Master PPI #62 - answer provided in Amendment A0001
62 RFP
Requesting an extension of the Question due date of 1 week to allow our vendors and subs to complete their review of the work package and submit any remaining questions.
Duplicate of Master BQ #39- answer provided in Amendment A0001
63 J-1 (Work Spec Package) 243-11-001 E.4 Please clarify that 009-09 vice 009-90 is required. Duplicate of Master BQ #62 - answered via Amendment A0001
64 J-1 (Work Spec Package) 243-12-001 E.4 Please clarify that 009-09 vice 009-90 is required. Duplicate of Master BQ #62 - answered via Amendment A0001
65 J-1 (Work Spec Package)
SECTION 3.1.-3.16, WI NO.
633-11-001
Is it the govt's intent to have ktr obtain the services of a technical representative to provide on-site technical assistance, parts, special tools, and guidance for disassembly, inspection, repair, assembly, testing and adjustment of the equipment listed in 1.3?
WI updated to include requirement for OEM technical support. See Errata 14.
66 J-1 (Work Spec Package) 259-10-002
In Para. 3.7.6 states "Remove each existing, provide new materials and install new each high temp lagging in the location listed in 1.2.2, for a total of 2500 square feet of high temp lagging."
What is the "high temp lagging" referenced in 3.7.6 of 259-10-002?
Please clarify.
Para. 3.7 calls out to accomplish NSI 009-11. NSI 009-11 in paragraph 3.1.4 calls out the High Temp Lagging requirements.
67 J-1 (Work Spec Package) 438-90-002
Several material line items of ref 2.3 438-8848560 REV A have been quoted to KTR with lead times upwards of 65 to 87 weeks by multiple suppliers. KTR is requesting the following pc No.s be provided as GFM; PC CA107, CA108, CA109, CA111, CA113
Do not concur. This material is Installing Activity Furnished (IAF) and will be provided by the installing activity.
68 J-1 (Work Spec Package) 583-90-001
(PINCKNEY) The following drawing 320-8826662 Rev B on work item 583-90-001 (E11) has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?
REF. 2.2 8826662, PC# M0109 (for assembly A0003), CA111 (for assembly A0011), CA110 (for assembly A0012), M0105 (for assembly A0012)
The 4720 reference in the WI is a fluid document and will be continually updated. Material identified as GFM on the drawing will be provided as GFM.
69 J-1 (Work Spec Package) 583-90-001
(PINCKNEY) The following drawing 583-8826664 Rev B on work item 583-90-001 (E11) has material indicated on the BOM source of GFM. This material is not listed in the GFM ship alt kit in paragraph 5 of the work item. Please confirm if this material is being provided as GFM?
REF. 2.5 8826664, PC# 236
The 4720 reference in the WI is a fluid document and will be continually updated. Material identified as GFM on the drawing will be provided as GFM.
70 J-1 (Work Spec Package) 541-80-002
Paragraph 3.2 requires contractor to accomplish 2.2 through 2.9. The RLAR references 2.3 through 2.9 made changes on material source from IAF to GFM.
Upon examining the 4720, there is a page for SA/WRK ITEM 80246 title D, which is the title of this work item. This page called out the same part X0001 in paragraph 5.1 as GFM. In addition, more dwg find numbers were listed. Please confirm DWG find number F0003, V0292, V0293 and their quantities are provided as GFM to accomplish reference 2.2 drawing 8504532 Rev A.
The 4720 reference in the WI is a fluid document and will be continually updated. Material identified as GFM on the drawing will be provided as GFM.
71 J-1 (Work Spec Package) 593-80-001
Paragraph 3.2 requires 2.2 through 2.5 using materials provided in 5.3.
References are entirely unclear what materials are sourced as GFM and, nothing is reported on the 4720 for AER 90219, 90237, and 90249. Kit for AER 90219, 90237, and 90249 are acknowledged as no materials are provided. Please confirm GFM for this work item.
The 4720 reference in the WI is a fluid document and will be continually updated. Material identified as GFM on the drawing will be provided as GFM.
72 J-1 (Work Spec Package) 110-11-001
Paragraph 3.8 requires to accomplish 009-12, Table 1, Column H, Lines One through 10. There is no Column H in Table 1 of 009-12, columns go from A to E.
Please advise
Please refer to page 13 of 30, in the FY22 009-12.
73 J-1 (Work Spec Package) 571-31-001
Paragraph 3.8.3 of Work Item 571-31-001 calls out for an “Ultrasonic Inspection”.
009-12 has not been invoked in to the basic works pec.
Please clarify what type of UT is required in paragraph 3.8.3.
Para 3.8.3 has been updated to include 009-12. See errata 17.
74 J-1 (Work Spec Package) 508-11-001 E7 Will scaffolding be needed to reach the locations where the insulation listed in 3.1 is to be installed? If so, please provide the specific locations in order to determine the scaffolding requirements.
No scaffolding is required.
75 J-1 (Work Spec Package) 508-12-001 E5
Will scaffolding be needed to reach the locations where the insulation listed in
3.1 is to be installed?
If so, please provide the specific locations in order to determine the scaffolding requirements.
No scaffolding is required.
76 J-1 (Work Spec Package) 631-41-001
Paragraph 3.7 requires to provide material, manufacture, fit and install deck scuppers removed as interference in 3.2.2. There is no paragraph 3.2.2.
For estimating purposes contractor will bid scuppers in accordance with 009-23.
Para 3.7 corrected to reflect para 1.2.2, see ERRATA 15.
77 J-1 (Work Spec Package) 635-11-001 E5
Will scaffolding be needed to reach the locations where the insulation listed in
3.1 is to be installed?
If so, please provide the specific locations in order to determine the scaffolding requirements.
No scaffolding is required.
78 J-1 (Work Spec Package) 122-20-001; 121-11-003;
121-11-004
Spec Item Paragraph 1.3.1 requires preservation of bilge spaces in Auxiliary Machinery Room Number One (4-126-0-E) and Engine Room No. One (4-174-0- E).
Specification Item 121-11-003 “Machinery Room Structural Repair and Preserve;
accomplish”, Paragraph 3.4 requires preservation of bilge space areas in Auxiliary Machinery Room Number One (4-126-0-E). Specification Item 121-11- 004 “Machinery Room Structural Repair and Preserve; accomplish”, Paragraphs
3.5 and 3.8 require preservation of bilge space areas in Engine Room No. One (4- 174-0-E).
It appears that bilge preservation requirements listed in subject Spec Item 122- 20-001 are already covered in Spec Items 121-11-003 and 121-11-004.
WI 122-20-001 is for repair. Wis 121-11-003 and 121-11-004 are for preservation after repair. The requirements are not redundant.
79 RFP
Section C
Section I
C-245-H006 ADDITIONAL REQUIREMENTS RELATING TO GOVERNMENT
PROPERTY (NAVSEA) (OCT 2018)
(a) For purposes of paragraph (h) of the clause entitled "Government Property" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel; (2) the equipment on the vessel; (3) movable stores; (4) cargo; and (5) other material on the vessel
(b) For purposes of paragraph (b) of the clause entitled "Government Property", notwithstanding any other requirement of this contract, the following shall not be considered Government Property:
(1) the vessel; (2) the equipment on the vessel; (3) movable stores; and (4) other material on the vessel
52.245-1 Alt I Government Property (JAN 2017) Alternate I APR 2012 As stated in FAR 52.245-1 Alt I (h)(1) The Contractor assumes the risk of, and shall be responsible for, any loss of Government property upon its delivery to the Contractor as Government-furnished property. However, the Contractor is not responsible for reasonable wear and tear to Government property or for Government property properly consumed in performing this contract.
C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)
(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:
As stated in DFARS 252.217-7012 Liability and Insurance:
Please refer to Section I - Contract Clauses, CLAUSES INCORPORATED BY REFERENCE, DFARS 252.217-7012 – Liability and Insurance. The contract must comply with DFARS 252.217-7012 in its entirety.
IAW Section C - Descriptions and Specifications, SCOPE OF WORK, 2. LOCATION:
which states, "The required place of performance for the Availabilities shall be the Contractor’s facility." Additionally, attachment J-3 Execution Milestones and Key Event Date document also identifies the first milestone as, "Avail Start at MSR Facility on Monday, October 4, 2021." These appear to be generalized statements prepared for a coast wide bid for out of homeport (San Diego) bidders.
Work Item 992-11-014 "Temporary Service; provide" Paragraph 3.30.4 states, "Provide ships force a dedicated crane and rigging services at Naval Station for 2 weeks (including weekends), 8 hours per day to support ships force moving off ship from anywhere on the ship. Provide pallets on board the ship for offloading materials."
The contractor has reviewed previously awarded contracts, both Coast wide and SDMAC, and notes that availabilities accomplished in the Port of San Diego start pierside at NAVSTA 32nd Street for the first 14 Calendar days. This allows the customer and ship's force time to prepare the ship to enter contractor’s facility as validated by paragraph 3.30.4 of work item 992-11-014 stated above.
Activities listed are not all inclusive: Ship's Force movement to Berthing Barge and Ship's Force off-load of stores, material, and portable equipment. This also allows the contractor an opportunity to set-up temporary services; installation of staging, drain, disposal, and dewatering of specific water systems; installation of the AN/SPY-1D Antenna Protective Covers and installation of deck protection prior to arrival in the contractor’s facility.
Bidder's Question:
1) Can bidder's assume that if the contract is awarded to a bidder for
If awarded in San Diego, the first 14 days of the avail will be preformed in NAVAL San Diego 32nd Street, then move to the contractors facility.
81 RFP Section C
IAW Section C - Descriptions and Specifications, SCOPE OF WORK, 5.4 PAINT ABATEMENT: which states, "Abatement work will be conducted in accordance with NSI 009-32. Paint abatement will be included as part of offerors proposed pricing and is not subject to additional growth."
Bidder's Questions:
1) Since the ship was last painted in a US Shipyard, has there been any paint applied outside of the United States?
2) If so, verify that all paint applied outside of the United States met NAVSEA Standard Item FY21 Change 0, 009-32, table 1 thru 8 requirements?
USS PINCKNEY has not been painted outside the United States.
82 RFP Section C
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
None
Bidder's Question:
It is the Contractors understanding that all required references listed in paragraph 2 of a zero-tier specification (work item) are "first tier" references.
However, when a zero-tier specification directs to use a first-tier reference as "guidance", bidders should not estimate the reference and only use it to aid in the development of an estimate of references that are to be accomplished.
1) Please concur or advise on this interpretation.
All zero-tier and first-tier references are mandatory for use in accordance with C-211-H016.
The contractor is responsible for ensuring compliance with mandatory references.
83 RFP Section B
NOTE E: SPECIAL AGREEMENT FOR GROWTH WITH A PRICE OF $25,000 OR LESS
1. To make administration of small dollar value growth more efficient and less costly, both parties (Government and Contractor) agree to a pre-priced value for individual growth items with an estimated price of $25,000 or less. The Contract will include a firm fixed price for growth valued at $25,000.00 or less. Zero-dollar changes and administrative contract changes (for example, drawing revision change where no additional work is required) shall not be executed using the Small Dollar Value Growth procedures, but will follow the change process.
Bidder’s Question:
1) In NOTE E, will the Government clearly identify changes in drawings when they have determined that "no additional work is required"?
A drawing revision change where no additional work is required is being provided as an example of an administrative change which will follow the change process. In the event a change requires growth (which has an estimated price of $25,000 or less), resolution will follow the Small Dollar Value Growth procedures. The Government will not respond to requests for blanket assertions regarding drawing revisions.
84 RFP Section B
NOTE A: LEVEL OF EFFORT TO COMPLETION – SHIP REPAIR
9. The information received in the consolidated final report required by Section C paragraph 6.6 will be used by the ACO in the issuance of one contract modification based on the information received in the final report identified in Section C below, which will be a final settlement for all LOE to Completion labor hours and material dollars. Once the number of labor hours and materials for directed work has been settled, neither party shall be entitled to an adjustment because the expended labor hours and materials differ from the settled price.
This shall not preclude an adjustment otherwise permitted by law and regulation; e.g. fraud, product substitution, defective workmanship or materials.
Each directed work shall receive approval by the SUPERVISOR and the ACO.
(“SUPERVISOR” as defined in NAVSEA Standard Item (NSI) 009-01, paragraph 4.3, refers to the local Government activity responsible for the execution and contract administration of Navy maintenance and modernization work.)
Bidder's Questions:
1) Are these approvals separate from the OQE required by the TIP's?
2) If yes, will the customer define the mechanism by which the ACO will approve
OQE?
3) If not, will the customer define the approvals sought by the Government, The criteria for such approvals, and the mechanism by which the will be approved by the SUPERVISOR and the ACO?
Please refer to the procedures outlined in Section C, para 6 regarding Accountability of LOE to Completion Growth. The SUPERVISOR AND ACO, after agreeing to scope, approve the GMR and the work is then authorized by the ACO. OQE required by TIPs is outlined in NSI 009-04. TIP submissions are made to the SUPERVISOR, not ACO. NSI 009-04 is a Category I NSI required by Section C paragraph 1.1. As such, compliance with 009-04 is base scope, and Section B Note A is not applicable to the base contract requirements to comply and satisfy all requirements of 009-04.
85 J-1 (Work Spec Package) 120-11-001
Work Item 120-11-001 paragraph 1.1 states, "Structural; repair and preserve".
The J-4 Pricing Workbook, USS PINCKNEY - WI Pricing TAB identifies Work Item 120-11-001, Item Description as "Structural Repair and Preservation;
accomplish". The contractor suspects that the item description for 120-11-001 was inadvertently copied from work item 120-11-002 which is correctly identified as "Structural Repair and Preservation; accomplish".
The contractor recommends that the J-4 Pricing Workbook, USS PINCKNEY - WI Pricing TAB be revised to correct the Item Description for Work Item 120-11-001, to state "Structural; repair and preserve" which will than match the J-1 specification title.
Bidder's Questions:
1) Does the customer concur with the contractors above assessment?
2) Will a revised J-4 Pricing Workbook be issued to correct the disparity on the USS PINCKNEY - WI Pricing TAB for the Item Description on Work Item 120-11- 001?
The WI title for WI 120-11-001 has been corrected on the updated J-4.
86 J-1 (Work Spec Package) 251-30-001
Work Item 251-30-001 "Air Intake and Exhaust Louver; preserve" Paragraph 3.6 states, "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 39, for fluidized bed application for each louver assembly."
The contractor has reviewed 009-32, Table 2, Line 39 and notes that it is for "ALUMINUM SURFACES on SURFACE SHIPS" for "EXTERIOR SURFACES ABOVE BOOTTOP, WITH EXCEPTION OF AREAS RECEIVING NONSKID" where as 009-32, Table 2, Line 31 is for "STEEL SURFACES on SURFACE SHIPS" for "EXTERIOR PORTABLE/BOLTED LOUVERS FOR INTAKES AND UPTAKES" which is normally referenced for louvers.
The contractor recommends that paragraph 3.6 of Work Item 251-30-001 be revised to state, "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 31, for fluidized bed application for each louver assembly."
Bidder's Questions:
1) Does the customer concur with the contractors above assessment?
2) Will an Errata be issued to correct the disparity on paragraph 3.6 of Work Item 251-30-001?
Do not concur. FY22 NSI shows line 36 and 39 for Louvers interior and exterior.
87 J-2 (References) 262-40-001
Work Item 262-40-001 "Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspect" Paragraph 3.8 states, "Accomplish the requirements of Paragraphs 505-11.1.3.2 through 505-11.1.3.4.2 of 2.6, for each equipment identified in 1.3.1."
The contractor has reviewed reference 2.6 identified in paragraph 3.8 and notes that the referenced paragraphs do NOT exist, but they are in reference 2.7.
The contractor recommends that paragraph 3.8 of Work Item 262-40-001 be revised to state, "Accomplish the requirements of Paragraphs 505-11.1.3.2 through 505-11.1.3.4.2 of 2.7, for each equipment identified in 1.3.1."
Bidder's Questions:
1) Does the customer concur with the contractors above assessment?
2) Will an Errata be issued to correct the disparity on paragraph 3.8 of Work Item 262-40-001?
Concur. Para 3.8 has been corrected. See errata 17.
88 J-2 (References) 593-80-001
Work Item 593-80-001 "DDG51 Class AER-90219, Replace Obsolete Control Panel on Pulper/Shredder, AER-90237, Replace Obsolete Control Panel on Metal/Glass Shredder, and AER-90249 Upgrade Metal/Glass Shredder to the MOD I Configuration; accomplish" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.5, including each General Note, Rip-out Note, Special Note and Test Note, using material provided in 5.3."
Paragraph 2.5 identifies, "593-8729171 Rev B, Mod 1 Solid Waste Shredder Mk III Electrical Enclosure Assembly & Details"
• Sheet-1, Zone-5A, Reference Drawings identifies Ref 2 "593-7556872 MOD.
1 - SOLID WASTE SHREDDER ELECTRICAL ENCLOSURE ASSEMBLY AND DETAILS".
• Sheet-2, Zone-9F, Parts List identifies Piece 66, "593-7556833, PC 91 - LABEL, SHREDDER FUSES".
To accomplish the requirements of 2.5 as directed by paragraph 3.2, the contractor requires 2nd tier reference drawings 593-7556872 and 593-7556833 as identified on Ref 2.5.
Bidder's Question:
1) Please provide 2nd tier reference drawings 593-7556872 and 593-7556833 as identified on Ref 2.5 for work item 593-80-001.
Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
89 J-1 (Work Spec Package) 411-90-001 E11
Paragraph 3.7 states; "Remove each existing, provide new NOMEX panels, fit and install new each NOMEX deck panel in each location listed in 1.2.1.1 and 1.2.1.2, in accordance with 2.23 and 2.24, using 2.25 for guidance".
Since ref 2.25 is a information only document ("False Deck Details....") Contractor believes the paragraph should read "...........in accordance with 2.24 and 2.25, using 2.23 for guidance."
Please review & concur.
Concur. Para 3.7 has been corrected. See errata 17.
90 J-1 (Work Spec Package) 665-11-001
Paragraph 3.3.1 states " Remove existing, provide new materials, fit and install new a total of 150 linear feet of steel plating to the existing equipment foundations."
Is it the Government's intent for the contractor to install 150 square feet of steel plating or 150 linear feet of angle bars?
Please advise.
Square feet is correct, not linear feet. WI para 3.3.1 has been corrected. See errata 17.
91 J-1 (Work Spec Package) 523-80-001
Reference has not been received. Please provide:
2.12 A005-690, CDRL, SFGD PRESSURIZATION OF DLS SPR - ShipAlt 51-75309 for DDG 91 Only
Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
92 J-1 (Work Spec Package) 542-21-001
Reference has not been received. Please provide:
2.2 0947-LP-246-5010, Change 2, Helicopter Defueling Pump BXL 1-1/4 NFDM
Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
93 J-1 (Work Spec Package) 123-11-008
Spec Item Paragraph 3.1 requires full SP-6 Blast of the following Compensated Fuel Oil Tanks:
1.2.4 Storage Tank (4-272-2-F)
1.2.5 Storage Tank (5-220-4-F)
1.2.11 Storage Tank (5-338-2-F)
Contractor cannot locate any Specification Item that completes final surface preparation and application of full coating system for these tanks.
See WIs 123-10-001, 123-11-008, and 123-11-006.
94 J-1 (Work Spec Package) 123-11-006
Spec Item Paragraph 3.2 requires spot blast and coat of the following Compensated Fuel Oil Tanks:
1.2.2 Fuel Rcvg Tank (5-220-4-F)
1.2.4 Fuel Oil Tank (4-272-2-F)
1.2.5 Fuel Rcvg Tank (5-338-2-F)
1.2.6 Fuel Expansion SW Overflow Tank GP-6 (4-370-4-F)
1.2.7 Fuel Tank (5-370-0-F)
Specification Items 123-11-001, 123-11-002 and 123-11-008 already require full blast of these listed tanks.
See WIs 123-10-001, 123-11-008, 123-11-006, and 541-90-001.
95 Attachment J-2 471-90-001
Work Item 471-90-001 "ShipAlt DDG51-79521K, AN/SLQ-32(V)7 Hardware;
accomplish (OPTION ITEM)" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.35, and
2.57 through 2.79, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3." (E15)
• Paragraph 2.70 identifies, "RLAR 79521/DDG91/1197901 , Adds a Parking Plate in Each Sponson for Bridge Wing Camera Maintenance (E14)"
• Paragraph 2.72 identifies, "RLAR 79521/DDG91/1198023, Deletes Detail for New Radar 1 Overhead Fans Resilient Mounts Because They Will Be Supplied With GFM (E14)"
• Paragraph 2.73 identifies, "RLAR 79521/DDG91/1198058, Adds Missing Bolts/Washers/Nuts for ASEA Cabinet Isolators (E14)"
• Paragraph 2.76 identifies, "RLAR 79521-DDG91-1198250, LCU Waterflo mtr 8 gpm Scale (E15)"
On 04/01/21, the contractor requested that all references associated with Errata's 14 thru 16 specification changes be provided IAW the directions on the beta.SAM website for Amendment 0001 to the USS Pinckney (DDG-91) FY22 DMP solicitation. The contractor subsequently received (2 EA) DoD SAFE drops with references, but the four references listed above were not +F42:F44
Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
96 J-2 (References) 411-90-002
Work Item 411-90-002 "ShipAlt DDG51-89804K, AWS: ACB16/TI16 OA Computing Plant; accomplish" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.21, 2.29 through 2.33, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3." (E15)
• Paragraph 2.31 identifies, "RLAR 89804/DDG89/1197318, Modify ECW Piping in AUX NO 1." (E15)
On 04/01/21, the contractor requested that all references associated with Errata's 14 thru 16 specification changes be provided IAW the directions on the beta.SAM website for Amendment 0001 to the USS Pinckney (DDG-91) FY22 DMP solicitation. The contractor subsequently received (2 EA) DoD SAFE drops with references, but the reference 2.31 listed above was not included.
Bidder's Questions:
1) Please provide the missing reference 2.31 identified above.
Missing reference(s) will be available upon request and sent via DoD SAFE. Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
97 J-2 (References) 471-90-001
Work Item 471-90-001 "ShipAlt DDG51-79521K, AN/SLQ-32(V)7 Hardware;
accomplish (OPTION ITEM)" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.35, and
2.57 through 2.79, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3." (E15)
• Paragraph 2.79 identifies, "RLAR 79521/DDG91/1191973 , Incorporate Verification Shipcheck" (E15)
On 04/01/21, the contractor requested that all references associated with Errata's 14 thru 16 specification changes be provided IAW the directions on the beta.SAM website for Amendment 0001 to the USS Pinckney (DDG-91) FY22 DMP solicitation. The contractor subsequently received (2 EA) DoD SAFE drops with references, but the reference 2.79 listed above was not included.
Bidder's Questions:
1) Please provide the missing reference 2.79 identified above.
DoD SAFE receipt shows this reference was included and is labeled as (Errata 15) 79521- DDG91-1191973.pdf. Please submit a follow up email if you no longer have access to the previous DoD SAFE link.
98 J-1 (Work Spec Package) 721-90-001
Work Item 721-90-001 "ShipAlt DDG51-91735K, MK41 VLS BLVII DDG (Partial);
accomplish"
Paragraph 2.6 identifies "RLAR 91735/DDG91/1198336, Correct Frame Callout (E15)" Paragraph 3.1 states, "Accomplish the requirements of 2.2 through 2.4, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3. (E15)"
The contractor suspects that during the implementation of the changes for Errata 15 to Paragraph 3.1 a typographical error developed resulting in the exclusion of references 2.5 thru 2.6 from accomplishment. The contractor thinks that the intent of the customer was that Paragraph 3.1 should state, "Accomplish the requirements of 2.2 through 2.6, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3. " (E15)
Bidder's Questions:
1) Does the customer concur with the contractors above assessment?
2) Will an Errata be issued to correct the statement in paragraph 3.1 of Work Item 721-90-001 to include reference 2.6 in the work scope?
Concur. WI para 3.1 has been updated to reflect references through 2.6. See errata 17.
99 J-1 (Work Spec Package) 251-30-001
Work Item 251-30-001 "Air Intake and Exhaust Louver; preserve" Paragraph 3.6 states, "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 39, for fluidized bed application for each louver assembly."
The contractor has reviewed 009-32, Table 2, Line 39 and notes that it is for "ALUMINUM SURFACES on SURFACE SHIPS" for "EXTERIOR SURFACES ABOVE BOOTTOP, WITH EXCEPTION OF AREAS RECEIVING NONSKID" where as 009-32, Table 2, Line 31 is for "STEEL SURFACES on SURFACE SHIPS" for "EXTERIOR PORTABLE/BOLTED LOUVERS FOR INTAKES AND UPTAKES" which is normally referenced for louvers.
The contractor recommends that paragraph 3.6 of Work Item 251-30-001 be revised to state, "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 31, for fluidized bed application for each louver assembly."
Bidder's Questions:
1) Does the customer concur with the contractors above assessment?
2) Will an Errata be issued to correct the disparity on paragraph 3.6 of Work Item 251-30-001?
Do not concur. FY22 NSI shows line 36 and 39 for Louvers interior and exterior.
100 Attachment J-2 471-90-001
Work Item 471-90-001 "ShipAlt DDG51-79521K, AN/SLQ-32(V)7 Hardware;
accomplish (OPTION ITEM)" Paragraph 3.2 states, "Accomplish the requirements of 2.2 through 2.35, and
2.57 through 2.67, including each General Note, Rip-out Note, Special Note and Test Note, in each location listed in 1.2, using material provided in 5.3."
Paragraph 2.62 identifies, "LAR 79521/DDG91/1194267, ELECTRICAL, WIRE
CONNECTION, CABLE ROUTING UPDATES FROM REVIEW COMMENTS (E1)"
Its noted that on ref 2.62, page 2 of 214, under the Question or Action Required section it states, "MATERIAL IMPACT: YES" and under the Answer or Action Taken section it states, "THERE IS NO MATERIAL IMPACT BY THIS LAR.
SUBSEQUENT RLAR'S HANDLE MATERIAL IMPACT". The contractor has reviewed ref 2.62 and found that the MATERIAL LIST on page 39 and 40 of 214 does indicate that some materials are GFM, but there are changes throughout the LAR which are not all captured on the noted MATERIAL LIST. For example, page 3 of 214 Zone 8-D, shows changes to the cables and subsequently changes connectors and back shells. On the basic they were all identified as GFM, but the LAR doesn’t specify material sourcing. Additionally, pages 198 thru 214 of 214 identify that RLAR's 1191972 and 1192303 will implement the changes of this LAR, but neither RLAR is identified in this work item or in any item in the specification package.
Bidder's Questions:
1) Are the "SUBSEQUENT RLAR'S HANDLE MATERIAL IMPACT" stated on Ref 2.62, page 2 of 214, the same RLARs identified on pages 198 thru 214 of 214 (RLAR's 1191972 and 1192303)?
1192303 is for the AIT only and not for use by the KTR. The 4720 is a active document that will provide GFM to specific spec. If no parts arrive and they are needed the work will be cancelled. Missing reference(s) will be available upon request and sent via DoD SAFE.
Requests for missing reference(s) shall be directed to Diana L Hutchinson, Contracting Officer and Danene Henry, Contract Specialist, at Diana.L.Hutchinson@navy.mil and Danene.Henry@navy.mil, respectively.
101 J-1 (Work Spec Package) 437-90-001
WI states "Accomplish the requirements of sh(s) 3-6 of 2.2., 2.3. through 2.6, and
2.9 through 2.13."
Ref 2.13. RLAR 79521/DDG91/1191973 instructs ktr to incorporate the PPE chill water flow alarm which is to be implemented in its entirety under RLAR
79521/DDG91/1191972.
Is it the Govt's intent to have ktr include pricing to accomplish the installation of the PPE chill water flow alarm under initial estimate for 437-90-001?
If so please provide required RLAR 79521/DDG91/1191972 and associated dwgs for estimating purposes.
1191973 is deleted.