N00024-20-R-4467 A0002 USS BATAAN PPI Tracker_Q 6-9.xlsx

XLSX spreadsheet 499 KB Posted

Attached to
USS BATAAN (LHD 5) FY20 Selected Restricted Availability (SRA)
Solicitation number
N00024-20-R-4467
Issued by

About this file

This document contains details of a federal contract solicitation for maintenance and repair of the USS BATAAN (LHD 5). The Naval Sea Systems Command seeks a contractor to execute the FY20 Selected Restricted Availability for the USS BATAAN, including maintenance, modernization, and repair work. The availability is expected to require a contractor with substantial facilities, including a capable pier and resources to complete, coordinate, and integrate multiple areas of ship maintenance and repair work. The solicitation will not be set aside for small businesses due to the complexity, magnitude and duration of the requirement. Interested offerors must register in the System for Award Management and monitor the beta.SAM.gov site for solicitation release and amendments. The Navy anticipates a single award by June 2020 for work starting in September 2020 and ship redelivery by December 2021. The place of performance is a contractor facility on the East or Gulf Coast of the United States.

View the file

Other files

File Type Posted
N00024-20-R-4467_A0006 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 48.xlsx XLSX spreadsheet
N00024-20-R-4467 BATAAN PPI Tracker_Q 29-47.xlsx XLSX spreadsheet
N00024-20-R-4467_A0005 USS BATAAN.pdf PDF
N00024-20-R-4467_A0003 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 18-28.xlsx XLSX spreadsheet
N00024-20-R-4467 BATAAN PPI Tracker_Q 10-17.xlsx XLSX spreadsheet
N00024-20-R-4467 A0003 USS BATAAN.pdf PDF
N00024-20-R-4467_A0002 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-19.pdf PDF
N00024-20-R-4467_A0001 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-17.pdf PDF
N00024-20-R-4467 A0001 USS BATAAN PPI Tracker_Q 1-5.xlsx XLSX spreadsheet
S-3 PPI Form USS BATAAN.docx DOCX document
CDRL B001 LMI PPL - N00024-20-R-4467.pdf PDF
CDRL B005 LMI Interim Support Data - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - N00024-20-R-4467.pdf PDF
CDRL A002 Condition Found Rpt - N00024-20-R-4467.pdf PDF
CDRL A006 QA Program Plan QMS - N00024-20-R-4467.pdf PDF
CDRL A007 QA Program Plan Fire Prevention-Housekeeping - N00024-20-R-4467.pdf PDF
CDRL C002 Tech Manual Rqmts - N00024-20-R-4467.pdf PDF
CDRL A011 Status of GFE - N00024-20-R-4467.pdf PDF
S-4 Manpower Plan to Actual Data Sheet.xlsx XLSX spreadsheet
S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL A008 QA Program Plan PCP - N00024-20-R-4467.pdf PDF
J-7 Schedule Model Review.pdf PDF
CDRL A009 Technical Report - Welding, Fab, Insp - N00024-20-R-4467.pdf PDF
CDRL B007 Provisioning Tech Docs - N00024-20-R-4467.pdf PDF
CDRL B004 LMI ISIL - N00024-20-R-4467.pdf PDF
CDRL B002 LMI Data Provisioning - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Enclosure 1 (BLK 16).pdf PDF
S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
S-9 Past Performance Questionnaire _USS BATAAN.docx DOCX document
CDRL B006 LMI Component Ident Data - N00024-20-R-4467.pdf PDF
CDRL A012 Key Event Schedule - N00024-20-R-4467.pdf PDF
CDRL A003 RCC Report - N00024-20-R-4467.pdf PDF
S-2 PP CPARS Reference List_USS BATAAN.docx DOCX document
S-5 Eligibility Criteria Data Sheet_USS BATAAN.docx DOCX document
CDRL C001 COTS Equipment Manual Suprt - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Attachment (1).xlsx XLSX spreadsheet
J-5 QASP_USS BATAAN FY20 SRA.pdf PDF
CDRL A005 Purchase Order - N00024-20-R-4467.pdf PDF
CDRL B008 Logistics Product Data - N00024-20-R-4467.pdf PDF
S-7 Proposal Assessment_USS BATAAN.xlsx XLSX spreadsheet
N00024-20-R-4467 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-11-26.pdf PDF
CDRL A001 Small Business Subcontract Rpt- N00024-20-R-4467.pdf PDF
CDRL B009 LMI Demand Only Trans Rpt - N00024-20-R-4467.pdf PDF
CDRL A014 Weight and Stability Report - N00024-20-R-4467.pdf PDF
S-6 Value Adjusted Total Evaluated Price_USS BATAAN_112219.pdf PDF
CDRL B003 LMI Design Change Notice - N00024-20-R-4467.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&As

Solicitation #:N00024-20-R-4467 USS BATAAN (LHD 5) SRA
NAVSEA POC:Melissa Donnelly, melissa.donnelly@navy.mil, (202) 781-5449
Jacqueline Black, jacqueline.black@navy.mil, (202) 781-1088
Question #Question AreaPara #Contractor QuestionGovernment Response
6Section L - Extension RequestN/ADue to the solicitation posting just before the holidays, and the delay in providing the work item specifications and initial set of references, we request an extension of the proposal due date.The Navy will change the proposal receipt date to February 5, 2020. The Navy will extend the bidder’s questions cut off date to January 7, 2020.
7J-1, WI No. 663-90-0012.1WI No. 663-90-001: When trying to open Ref 2.78, drawing, 8830705, a window pops up and says There is an error opening this document. The file is damaged and could not be repaired. Please provide this reference via email or CD.Drawing 8830705 will be distributed with Amendment 2
8J-1, WI No. 663-90-0012.108Please provide reference 2.108, drawing 804-8773932 Rev A, Insulation for Ducts, Acoustic and Thermal, Installation Details.Work Item 663-90-001 does not have reference 2.108 listed in the work item.
9J-1, WI No. 830-80-0032.5-2.13, 2.15The references list in 2.5 – 2.13 & 2.15 were not provided with this package. Please provide these references.Reference drawings 2.5-2.13 were provided with Errata #2.

Drawing 804-5773931 will be distributed with Amendment 2.

PPI FORM

USS BATAAN (LHD 5) SRA N00024-20-R-4467Section F
Attachment S-3 Pre-Proposal Information (PPI) Form
Contractor Name:Section G
Contractor POC & Phone:Section H
Section I
Question #Date of Request:SectionWork Items/CSWT #Para. #Page #:Attach. #Contractor QuestionSection J

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .