J-7 Schedule Model Review.pdf

PDF 17 KB Posted

Attached to
USS BATAAN (LHD 5) FY20 Selected Restricted Availability (SRA)
Solicitation number
N00024-20-R-4467
Issued by

About this file

This document contains a solicitation and schedule model review agenda for the USS BATAAN (LHD 5) FY20 Selected Restricted Availability (SRA). The Naval Sea Systems Command issues solicitation N00024-20-R-4467 seeking a contractor to execute maintenance, modernization, and repair of the USS BATAAN from September 2020 through December 2021. The availability requires facilities including a capable pier, resources to complete ship maintenance and repair, and experience with USS WASP-class ships. Interested parties must register in the System for Award Management and monitor beta.SAM.gov for proposal details. The schedule model review agenda outlines an expected 5-7 day meeting for the integrated production schedule with attendees from the government, lead maintenance activity, subcontractors, and ship's force to validate integration and de-conflict activities. Deliverables include updated schedules and plans for early start candidates, work authorization forms, pier layout, fire drills, and process control procedures.

View the file

Other files

File Type Posted
N00024-20-R-4467_A0006 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 48.xlsx XLSX spreadsheet
N00024-20-R-4467 BATAAN PPI Tracker_Q 29-47.xlsx XLSX spreadsheet
N00024-20-R-4467_A0005 USS BATAAN.pdf PDF
N00024-20-R-4467_A0003 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 18-28.xlsx XLSX spreadsheet
N00024-20-R-4467 BATAAN PPI Tracker_Q 10-17.xlsx XLSX spreadsheet
N00024-20-R-4467 A0003 USS BATAAN.pdf PDF
N00024-20-R-4467 A0002 USS BATAAN PPI Tracker_Q 6-9.xlsx XLSX spreadsheet
N00024-20-R-4467_A0002 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-19.pdf PDF
N00024-20-R-4467_A0001 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-17.pdf PDF
N00024-20-R-4467 A0001 USS BATAAN PPI Tracker_Q 1-5.xlsx XLSX spreadsheet
S-3 PPI Form USS BATAAN.docx DOCX document
CDRL B001 LMI PPL - N00024-20-R-4467.pdf PDF
CDRL B005 LMI Interim Support Data - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - N00024-20-R-4467.pdf PDF
CDRL A002 Condition Found Rpt - N00024-20-R-4467.pdf PDF
CDRL A006 QA Program Plan QMS - N00024-20-R-4467.pdf PDF
CDRL A007 QA Program Plan Fire Prevention-Housekeeping - N00024-20-R-4467.pdf PDF
CDRL C002 Tech Manual Rqmts - N00024-20-R-4467.pdf PDF
CDRL A011 Status of GFE - N00024-20-R-4467.pdf PDF
S-4 Manpower Plan to Actual Data Sheet.xlsx XLSX spreadsheet
S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL A008 QA Program Plan PCP - N00024-20-R-4467.pdf PDF
CDRL A009 Technical Report - Welding, Fab, Insp - N00024-20-R-4467.pdf PDF
CDRL B007 Provisioning Tech Docs - N00024-20-R-4467.pdf PDF
CDRL B004 LMI ISIL - N00024-20-R-4467.pdf PDF
CDRL B002 LMI Data Provisioning - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Enclosure 1 (BLK 16).pdf PDF
S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
S-9 Past Performance Questionnaire _USS BATAAN.docx DOCX document
CDRL B006 LMI Component Ident Data - N00024-20-R-4467.pdf PDF
CDRL A012 Key Event Schedule - N00024-20-R-4467.pdf PDF
CDRL A003 RCC Report - N00024-20-R-4467.pdf PDF
S-2 PP CPARS Reference List_USS BATAAN.docx DOCX document
S-5 Eligibility Criteria Data Sheet_USS BATAAN.docx DOCX document
CDRL C001 COTS Equipment Manual Suprt - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Attachment (1).xlsx XLSX spreadsheet
J-5 QASP_USS BATAAN FY20 SRA.pdf PDF
CDRL A005 Purchase Order - N00024-20-R-4467.pdf PDF
CDRL B008 Logistics Product Data - N00024-20-R-4467.pdf PDF
S-7 Proposal Assessment_USS BATAAN.xlsx XLSX spreadsheet
N00024-20-R-4467 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-11-26.pdf PDF
CDRL A001 Small Business Subcontract Rpt- N00024-20-R-4467.pdf PDF
CDRL B009 LMI Demand Only Trans Rpt - N00024-20-R-4467.pdf PDF
CDRL A014 Weight and Stability Report - N00024-20-R-4467.pdf PDF
S-6 Value Adjusted Total Evaluated Price_USS BATAAN_112219.pdf PDF
CDRL B003 LMI Design Change Notice - N00024-20-R-4467.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00024-20-R-4467 Attachment J-7 Schedule Model Review

USS BATAAN (LHD 5)

Purpose: At A-30 the LMA shall lead a Schedule Model Review of the Integrated Production Schedule (IPS) with all parties to validate integration requirements. The Schedule Model Review is intended to be a detailed review of all work items to ensure adequate integration into the master schedule and to de-conflict any overlapping activities. The anticipated duration of this meeting is 5-7 days. Hours for Day 1 is 0800-1600 and for Day2 and following is 0800-1130.

1. Required Attendees:

a. LMA management team

b. Government Project Management Team (NSA)

c. Turnkey Subcontractors

d. AIT On Site Installation Coordinators (OSIC)

e. Intermediate Maintenance Facility (IMF) Ship’s Superintendent, if applicable

f. Ship’s Force (one representative from each department, Ship’s Maintenance Officer)

2. Agenda:

Day 1 WPER (Government Facilitated)

a. Early Start Candidates (LMA)

b. WAF/Tag Out coordination (LMA)

c. Pier Laydown Plan (LMA)

d. First 100 Hour Plan (NSA)

e. Communications Plan (NSA)

f. Process Control Procedures (PCP) (LMA)

g. Access Cuts (LMA)

h. Fire Prevention and Fire Drill (8010) requirements (NSA)

i. Memorandum of Agreement (MOA) – AIT’s only (NSA)

Day 2 - 7

j. LMA to Present the IPS for review. The IPS shall include (but not limited to) all work associated with the

Lead Maintenance Activity (LMA), subcontractors, Alteration Installation Teams (AIT), Ship’s Force, and Intermediate Maintenance Activity (IMA).

3. Deliverables:

a. Updated IPS with all maintenance activities fully integrated. (LMA)

b. Early start candidates submitted and approved by the NSA. (LMA)

c. WAF/Tag Out coordination plan established. (LMA)

d. First 100 Hour Plan established. (NSA)

e. Set schedule for all required meetings. (NSA)

f. Pier Laydown Plan submitted for approval by Naval Station Everett. (LMA)

g. List of Process Control Procedures with projected due dates. (LMA)

h. List of access cuts (if required). (LMA)

i. Fire drill execution date set. (NSA)

j. Detailed review of critical path and top three controlling path items. (LMA)