N00024-20-R-4467 BATAAN PPI Tracker_Q 18-28.xlsx

XLSX spreadsheet 502 KB Posted

Attached to
USS BATAAN (LHD 5) FY20 Selected Restricted Availability (SRA)
Solicitation number
N00024-20-R-4467
Issued by

About this file

This document provides details on a federal contract solicitation for maintenance and repair services on the USS BATAAN (LHD 5). The Naval Sea Systems Command seeks a contractor to execute the FY20 Selected Restricted Availability for the USS BATAAN, including maintenance, modernization, and repair work. The availability is expected to require a highly capable contractor with substantial facilities, including a USS WASP class capable pier, as well as personnel resources to complete, coordinate, and integrate multiple areas of ship maintenance, repair, and modernization. Interested parties must register in the System for Award Management and monitor the beta.SAM.gov site for solicitation N00024-20-R-4467 and any amendments. While the solicitation and most attachments will be posted to beta.SAM.gov, some attachments detailing specifications, work items, milestones and pricing will be available only by written request. The agency anticipates a single award by June 2020 for work with an availability start date of September 2020 and delivery date for the USS BATAAN of no later than December 2021.

View the file

Other files

File Type Posted
N00024-20-R-4467_A0006 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 48.xlsx XLSX spreadsheet
N00024-20-R-4467 BATAAN PPI Tracker_Q 29-47.xlsx XLSX spreadsheet
N00024-20-R-4467_A0005 USS BATAAN.pdf PDF
N00024-20-R-4467_A0003 USS BATAAN.pdf PDF
N00024-20-R-4467 BATAAN PPI Tracker_Q 10-17.xlsx XLSX spreadsheet
N00024-20-R-4467 A0003 USS BATAAN.pdf PDF
N00024-20-R-4467 A0002 USS BATAAN PPI Tracker_Q 6-9.xlsx XLSX spreadsheet
N00024-20-R-4467_A0002 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-19.pdf PDF
N00024-20-R-4467_A0001 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-12-17.pdf PDF
N00024-20-R-4467 A0001 USS BATAAN PPI Tracker_Q 1-5.xlsx XLSX spreadsheet
S-3 PPI Form USS BATAAN.docx DOCX document
CDRL B001 LMI PPL - N00024-20-R-4467.pdf PDF
CDRL B005 LMI Interim Support Data - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - N00024-20-R-4467.pdf PDF
CDRL A002 Condition Found Rpt - N00024-20-R-4467.pdf PDF
CDRL A006 QA Program Plan QMS - N00024-20-R-4467.pdf PDF
CDRL A007 QA Program Plan Fire Prevention-Housekeeping - N00024-20-R-4467.pdf PDF
CDRL C002 Tech Manual Rqmts - N00024-20-R-4467.pdf PDF
CDRL A011 Status of GFE - N00024-20-R-4467.pdf PDF
S-4 Manpower Plan to Actual Data Sheet.xlsx XLSX spreadsheet
S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL A008 QA Program Plan PCP - N00024-20-R-4467.pdf PDF
J-7 Schedule Model Review.pdf PDF
CDRL A009 Technical Report - Welding, Fab, Insp - N00024-20-R-4467.pdf PDF
CDRL B007 Provisioning Tech Docs - N00024-20-R-4467.pdf PDF
CDRL B004 LMI ISIL - N00024-20-R-4467.pdf PDF
CDRL B002 LMI Data Provisioning - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Enclosure 1 (BLK 16).pdf PDF
S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
S-9 Past Performance Questionnaire _USS BATAAN.docx DOCX document
CDRL B006 LMI Component Ident Data - N00024-20-R-4467.pdf PDF
CDRL A012 Key Event Schedule - N00024-20-R-4467.pdf PDF
CDRL A003 RCC Report - N00024-20-R-4467.pdf PDF
S-2 PP CPARS Reference List_USS BATAAN.docx DOCX document
S-5 Eligibility Criteria Data Sheet_USS BATAAN.docx DOCX document
CDRL C001 COTS Equipment Manual Suprt - N00024-20-R-4467.pdf PDF
CDRL A015 Performance Report - Attachment (1).xlsx XLSX spreadsheet
J-5 QASP_USS BATAAN FY20 SRA.pdf PDF
CDRL A005 Purchase Order - N00024-20-R-4467.pdf PDF
CDRL B008 Logistics Product Data - N00024-20-R-4467.pdf PDF
S-7 Proposal Assessment_USS BATAAN.xlsx XLSX spreadsheet
N00024-20-R-4467 USS BATAAN (LHD 5) FY20 SRA Soliciation_2019-11-26.pdf PDF
CDRL A001 Small Business Subcontract Rpt- N00024-20-R-4467.pdf PDF
CDRL B009 LMI Demand Only Trans Rpt - N00024-20-R-4467.pdf PDF
CDRL A014 Weight and Stability Report - N00024-20-R-4467.pdf PDF
S-6 Value Adjusted Total Evaluated Price_USS BATAAN_112219.pdf PDF
CDRL B003 LMI Design Change Notice - N00024-20-R-4467.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&As ver.1

Solicitation #:N00024-20-R-4467 USS BATAAN (LHD 5) SRA
NAVSEA POC:Melissa Donnelly, melissa.donnelly@navy.mil, (202) 781-5449
Jackie Black, jacqueline.black@navy.mil, (202) 781-1088
Master #Question AreaPara #Contractor QuestionGovernment Response
18J-1, WI No. 612-21-0011.3, 3.2, 3.3Because of the quantity of safety net frames (24) called out in 1.3, will the Government provide locations for the new replacement frames in 3.2? Please clarify requirements of 3.3, for the intent of preservation. Are the new safety nets to be painted and the disturbed being the damage after install and weight testing? Please clarify paragraph 3.3.1 calling for SSPC-SP-11 for each fixed frame. Will the locations be provided or is every fixed frame the intent for preservation? Will the safety nets removed from the fixed frames be considered interference in accordance with 009-23 or will the Government add a paragraph to the item providing direction?Replacement of frames will be based on results of visual inspection and report submitted in paragraph 3.1 AND 3.1.2. In errata 5 Paragraph 3.3 removed "new and disturbed", paragraph 3.3.1 removed SSPC-SP-11. Every fixed frame will be preserved. Safety nets will be considered interference.
19J-1, WI No. 980-11-0043.12Paragraph 3.12 reads, “Main Machinery Room access cuts accomplished by other work items must be completed by 08/21/20.” What items have the Contracting completing access cuts 25 days prior to start of avail?In errata 5 revised paragraph 3.12 to 11/21/2020, intent of paragraph is to ensure access cuts in Main machinery room #1 6-65-0-E and Main Machinery Room #2 6-81-0-E are cut by this date.
20J-1, WI No. 980-11-0043.12Paragraph 3.12 reads, “Main Machinery Room access cuts accomplished by other work items must be completed by 08/21/20.” Is the meaning of “completed” in this paragraph to have the access cut but not welded up?In errata 5 changed pargraph 3.12 to 11/21/2020, intent of paragraph is ensure access cuts in Main machinery room 6-65-0-E and Main Machinery Room #2 6-81-0-E are cut by this date. The plate requires welding. Please refer to work items which have 009-05 (access cuts) invoked (255-51-001, 255-52-001 and 256-22-001).
21J-1, WI No. 980-11-0043.11Paragraph 3.11.1 reads, “NNSY will provide test criteria.” When will the test criteria be provided?In errata 5, 3.11, revised to read "for a total of 850" added 3.11.1 For bidding purposes provide 250 Paint, 250 Lagging and 350 refractory samples; 3.11.2 added Submit one legible copy, in hard copy or electronic media, of a report listing testing criteria to the SUPERVISOR, 3 days prior to conducting test; Added 3.11.3 NSSY will aprrove test criteria".
22J-1, WI No. 980-11-0043.11Paragraph 3.11 reads, “provide paint, lagging and refractory sampling analysis for 850 samples.” Is it the intent of this paragraph to provide a total of 850 samples? If so, for estimating purposes please provide a breakdown of how many of each type will be needed to total 850.In errata 5 revised 3.11 to read "for a total of 850 samples". For bidding purposes; 250 Paint, 250 Lagging and 350 refractroy samples.
23J-1, WI No. 521-11-0051.3.3, 3.3, 3.4Para 3.2 states to remove the equipment in 1.3. 1.3 list 3 different size gate valves. Para 3.3 states to accomplish 009-47 for each valve listed in 1.3.1 and 1.3.2. Then para 3.4 states to disassemble each motor operator. Please confirm, the contractors are to accomplish 009-47 for the valves listed in 1.3.1 & 1.3.2, and disassemble the motor operator for the valve listed in 1.3.3.In errata 5 revised 3.4 to read "motor operator for the valves". Contractor will be required to accomplish 009-47.
24J-1, WI No. 980-80-0082.3, 3.2The following were added to the work item via Errata 4 but were not provided. Please provide. 2.2 521-8716967 Rev A, Conv T/D FP7&8-Disch Pp Temp Rmvl; 2.3 101-8695988 Rev A, Repl T/D Fire Pump Shipping Access Machinery Room No. 1 & 2.The drawings will be distributed with Amendment 0004.
25J-1, WI No. 262-42-0013.4Paragraph 3.4 disassembles the motor listed in 1.3.2 but the motor isn’t repaired in the item (009-17 or 009-33) or reassembled. Please identify what repairs are to be performed.Repairs for motor is an open and inspect and repairs will be accomplished based on report submitted in paragraph 3.4.7.
26J-1, WI No. 120-11-0043.2Paragraph 3.2 requires the replacement of two strainers. Referenced details and drawing do not identify a size. Please provide dimensional information for material pricingOnly valves are being installed in paragraph 3.2.
27J-1, WI No. 521-11-0051.3.3Firemain valve in paragraph 1.3.3 is identified as being motor operated. Drawing 803-2177717 and the APL number list the valve as being hand wheeled operated. If the valve is motor operated, please provide manufacturer’s information.Actuator APL 61A040244 MFR: TRI TECH (APL listed as lower assembly on APL listed in 1.3.3.
28J-1, WI No. 663-90-0012.108The Government’s response (question 8) is “work item 663-90-001 does not have reference 2.108 listed in the work item.” Paragraph 2.108, drawing 804-8773932 was added to the work item via Errata 2. Please provide reference 2.108, drawing 804-8773932 Rev A, Insulation for Ducts, Acoustic and Thermal, Installation Details.DWG number changed 804-5773932 in Errata 4. Drawing will be distributed with Amendment 0004.

PPI FORM

USS BATAAN (LHD 5) SRA N00024-20-R-4467Section F
Attachment S-3 Pre-Proposal Information (PPI) Form
Contractor Name:Section G
Contractor POC & Phone:Section H
Section I
Question #Date of Request:SectionWork Items/CSWT #Para. #Page #:Attach. #Contractor QuestionSection J

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .