J-4 T-AGOS TDP Review Feedback Form 10 30 2019.doc
DOC document 205 KB Posted
- Solicitation number
- N00024-20-R-2244
About this file
This document provides a template for submitting feedback on a Technical Data Package for the Auxiliary General Ocean Surveillance Ship (T-AGOS(X)) program. The template requests information on the section or drawing being commented on, whether the feedback is reflected elsewhere, potential impacts to design, cost, logistics and schedule, and recommendations. Reviewers and individuals from the prime contractor are asked to provide contact information, assess the feedback, and recommend acceptance or note concerns. The Naval Sea Systems Command solicitation N00024-20-R-2244 seeks industry studies for the T-AGOS(X) program as detailed in the enclosed solicitation. Interested parties must request and sign a non-disclosure agreement to receive the Section J-1 attachments. Questions shall be submitted to the identified points of contact and posted to beta.sam.gov. Only U.S. companies may propose as prime contractors.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T-AGOS(X)Technical Data Package
Review Feedback Form
Tracking # : XXX Date Submitted : XX/XX/XX
| Industry Review Input |
| Brief title of review feedback: |
Document providing input on:
Section(s)/Paragraph(s)/Drawing Locator(s):
Is this input reflected in other attachments?
Yes: FORMCHECKBOX No: FORMCHECKBOX If yes, Specify:
| POC: |
| Company Name: |
| Phone: |
| Email: |
Feedback: (See Attached Is/Was Markup as applicable)
Rationale/Benefits:
Attachments (list of file names):
Design Impact:
None FORMCHECKBOX Minimal FORMCHECKBOX Moderate FORMCHECKBOX Significant FORMCHECKBOX
Description:
Cost Impact:(Provide details in proposed change ROM cost estimate worksheet)
Minimal FORMCHECKBOX
Logistics Impact:
Minimal FORMCHECKBOX
Schedule Impact:
Minimal FORMCHECKBOX
Assessment Summary:
| REVIEWER |
| Name: |
Phone:
Email:
Date:
Organization/Code:
Title:
Comments:
Recommendation:
Attachments (list of file names):
| REVIEWER |
| Name: |
Phone:
Email:
Date:
Comments:
Recommendation:
Attachments (list of file names):
| REVIEWER |
| Name: |
Phone:
Email:
Date:
Comments:
Recommendation:
Attachments (list of file names):
| INTEGRATION REVIEW |
| Name: |
Phone:
Email:
Date:
Comments:
Recommendation:
Attachments (list of file names):
| DESIGN TEAM ACTOIN |
| Name: |
Phone:
Email:
Date:
Comments:
Recommendation:
Concur: FORMCHECKBOX
Noted: FORMCHECKBOX
No Action: FORMCHECKBOX
Proposed Change ROM Cost Estimate
Attachment J-4
_1314638133.xls
LCS ROM FORM
Out of Sequence OUT OF SEQ. IN SEQUENCE
DDG 91 DDG 93 DDG 95 DDG 97 DDG 98 DDG 100 HULL # HULL # HULL # HULL # HULL # HULL # TOTAL
5291 5293 5295 5297 5298 5250
+ (XX%) $0 $0 $0 $0 $0 $0 ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) (SUM(O5:T5))
Estimate $0 $0 $0 $0 $0 $0 $YY $YY $YY $YY $YY $YY $YY Plus/Minus 40% of 0 is 0
% of Total Price 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
- (XX)% $0 $0 $0 $0 $0 $0 ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) (SUM(O10:T10))
Cost by Category
Tech & Engineering $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$
Non-Production $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Data in blue highlighted cells must be provided for prime contractors
% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$
Production $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$
Material $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
% of Hull Price 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Subcontractor Cost $0 $0 $0 $0 $0 $0 $0
Total:
Assumptions: 1. Engineering impact is based upon ___ drawing updates.
2. Work will be accomplished out-of-sequence on Hull ____ and in-sequence on Hull ___.
3. ROM parameters +/-:_______.
4. ROM price is valid until date:_______.
5. ROM is based on the following scope of work-
Description Add/Del/Rev Est Qty Remarks
Structure Foundations Add # lb
Foundations Delete # lb
Electrical Cabling Add # lf
Cabling Delete # lf
6. Planned Milestone Dates-
PCRB Design Proposal Pricing
Accept Package Submit Negotiation MOD Support Due dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr
&C&"Arial,Bold"&12LCS
ROUGH ORDER OF MAGNITUDE
(ROM) FORM&RChange Order Submit Date
XX/XX/05
&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)
Use the Design Package date here.
&C&"Arial,Bold"&12LCS
ROUGH ORDER OF MAGNITUDE
(ROM) FORM&RChange Order Submit Date
XX/XX/05
&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)
&C&"Arial,Bold"&12LCS
ROUGH ORDER OF MAGNITUDE
(ROM) FORM&RChange Order Submit Date
XX/XX/05
&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)
&C&"Arial,Bold"&12LCS
ROUGH ORDER OF MAGNITUDE
(ROM) FORM&RChange Order Submit Date
XX/XX/05
&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)
File details come from the government source that posted it. Updated .