J-4 T-AGOS TDP Review Feedback Form 10 30 2019.doc

DOC document 205 KB Posted

Attached to
The Auxiliary General Ocean Surveillance Ship (T-AGOS (X)) Industry Studies
Solicitation number
N00024-20-R-2244
Issued by

About this file

This document provides a template for submitting feedback on a Technical Data Package for the Auxiliary General Ocean Surveillance Ship (T-AGOS(X)) program. The template requests information on the section or drawing being commented on, whether the feedback is reflected elsewhere, potential impacts to design, cost, logistics and schedule, and recommendations. Reviewers and individuals from the prime contractor are asked to provide contact information, assess the feedback, and recommend acceptance or note concerns. The Naval Sea Systems Command solicitation N00024-20-R-2244 seeks industry studies for the T-AGOS(X) program as detailed in the enclosed solicitation. Interested parties must request and sign a non-disclosure agreement to receive the Section J-1 attachments. Questions shall be submitted to the identified points of contact and posted to beta.sam.gov. Only U.S. companies may propose as prime contractors.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T-AGOS(X)Technical Data Package

Review Feedback Form

Tracking # : XXX Date Submitted : XX/XX/XX

Industry Review Input
Brief title of review feedback:

Document providing input on:

Section(s)/Paragraph(s)/Drawing Locator(s):

Is this input reflected in other attachments?

Yes: FORMCHECKBOX No: FORMCHECKBOX If yes, Specify:

POC:
Company Name:
Phone:
Email:

Feedback: (See Attached Is/Was Markup as applicable)

Rationale/Benefits:

Attachments (list of file names):

Design Impact:

None FORMCHECKBOX Minimal FORMCHECKBOX Moderate FORMCHECKBOX Significant FORMCHECKBOX

Description:

Cost Impact:(Provide details in proposed change ROM cost estimate worksheet)

Minimal FORMCHECKBOX

Logistics Impact:

Minimal FORMCHECKBOX

Schedule Impact:

Minimal FORMCHECKBOX

Assessment Summary:

REVIEWER
Name:

Phone:

Email:

Date:

Organization/Code:

Title:

Comments:

Recommendation:

Attachments (list of file names):

REVIEWER
Name:

Phone:

Email:

Date:

Comments:

Recommendation:

Attachments (list of file names):

REVIEWER
Name:

Phone:

Email:

Date:

Comments:

Recommendation:

Attachments (list of file names):

INTEGRATION REVIEW
Name:

Phone:

Email:

Date:

Comments:

Recommendation:

Attachments (list of file names):

DESIGN TEAM ACTOIN
Name:

Phone:

Email:

Date:

Comments:

Recommendation:

Concur: FORMCHECKBOX

Noted: FORMCHECKBOX

No Action: FORMCHECKBOX

Proposed Change ROM Cost Estimate

Attachment J-4

_1314638133.xls

LCS ROM FORM

Out of Sequence OUT OF SEQ. IN SEQUENCE

DDG 91 DDG 93 DDG 95 DDG 97 DDG 98 DDG 100 HULL # HULL # HULL # HULL # HULL # HULL # TOTAL

5291 5293 5295 5297 5298 5250

+ (XX%) $0 $0 $0 $0 $0 $0 ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) ($YY)(1.XX) (SUM(O5:T5))

Estimate $0 $0 $0 $0 $0 $0 $YY $YY $YY $YY $YY $YY $YY Plus/Minus 40% of 0 is 0

% of Total Price 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

- (XX)% $0 $0 $0 $0 $0 $0 ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) ($YY)(1.00-.XX) (SUM(O10:T10))

Cost by Category

Tech & Engineering $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$

Non-Production $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Data in blue highlighted cells must be provided for prime contractors

% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$

Production $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

% of Hull Price $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$ $$$$

Material $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

% of Hull Price 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Subcontractor Cost $0 $0 $0 $0 $0 $0 $0

Total:

Assumptions: 1. Engineering impact is based upon ___ drawing updates.

2. Work will be accomplished out-of-sequence on Hull ____ and in-sequence on Hull ___.

3. ROM parameters +/-:_______.

4. ROM price is valid until date:_______.

5. ROM is based on the following scope of work-

Description Add/Del/Rev Est Qty Remarks

Structure Foundations Add # lb

Foundations Delete # lb

Electrical Cabling Add # lf

Cabling Delete # lf

6. Planned Milestone Dates-

PCRB Design Proposal Pricing

Accept Package Submit Negotiation MOD Support Due dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr dd/mm/yr

&C&"Arial,Bold"&12LCS

ROUGH ORDER OF MAGNITUDE

(ROM) FORM&RChange Order Submit Date

XX/XX/05

&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)

Use the Design Package date here.

&C&"Arial,Bold"&12LCS

ROUGH ORDER OF MAGNITUDE

(ROM) FORM&RChange Order Submit Date

XX/XX/05

&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)

&C&"Arial,Bold"&12LCS

ROUGH ORDER OF MAGNITUDE

(ROM) FORM&RChange Order Submit Date

XX/XX/05

&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)

&C&"Arial,Bold"&12LCS

ROUGH ORDER OF MAGNITUDE

(ROM) FORM&RChange Order Submit Date

XX/XX/05

&C&"Arial,Bold"&12SHIPBUILDER&REnclosure (3)

File details come from the government source that posted it. Updated .