J-3 Sample Tasking T-AGOS(X) Industry Studies 01 14 2020.docx

DOCX document 22 KB Posted

Attached to
The Auxiliary General Ocean Surveillance Ship (T-AGOS (X)) Industry Studies
Solicitation number
N00024-20-R-2244
Issued by

About this file

This solicitation requests industry studies for the Auxiliary General Ocean Surveillance Ship (T-AGOS (X)). The Naval Sea Systems Command (NAVSEA) seeks proposals for three sample tasks including an ABS Notation Development report, a Mooring and Anchoring Arrangement Report, and a High Latitudes Features Report detailing features to limit topside icing impacts. Interested parties must submit a written request and sign a non-disclosure agreement to receive the full solicitation attachments. Only U.S. companies may propose as prime contractors. Questions must be submitted to the points of contact listed by the specified due date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT J-3

Auxiliary General Ocean Surveillance Ship, T-AGOS(X)

SAMPLE TASKS FOR CLIN 0003

INDUSTRY STUDIES CONTRACT

January 14, 2020

DISTRIBUTION Statement A: Approved for public release; distribution is unlimited. Other requests shall be referred to PEO Ships PMS325, Washington Navy Yard, 1333 Isaac Hull Ave. SE, Washington, DC 20376-2101

CONTRACT/PR NO.: N00024-20-R-2244

SAMPLE TASK 1

ABS Notation Development The Contractor/Propulsion SSV shall prepare an ABS Notation Report. The report shall document an approach for distributed navigation and machinery control to allow for reduced manning and remote operating stations and monitoring. This shall include access control, proposed locations for access, and interface design approach to prevent user error. The report shall evaluate ABS notations for applicability to the control system described in the Ship Control Report and recommend the ABS notations required to define/support the system.

SAMPLE TASK 2

Mooring and Anchoring Arrangement Development The Contractor shall prepare a Mooring and Anchoring Arrangement Report which considers anchor handling arrangement capable of clearing the hull structure, protection of appendages and the propeller, fendering or camel size, wind/ice loads, other environmental and fendering loads, astern refueling line handling, and mooring line arrangement, in accordance with ABS notations described in Attachment J-1. In particular, the Contractor shall propose design features to move the anchors further away from the canards than the arrangement depicted in associated Technical Instruction.

SAMPLE TASK 3

High Latitudes Features Development The Contractor shall prepare a High Latitudes Features Report that details features to limit topside icing impacts including ice accumulation, intake icing, and other Anti-Icing or De-Icing features. The Contractor shall also provide recommendations for machinery and auxiliary design considerations of severe cold weather operations.

File details come from the government source that posted it. Updated .