N0002419R5519-002 SEWIP Block 3 Production Conformed 12.10.2019.docx

DOCX document 365 KB Posted

Attached to
SEWIP BLOCK 3 EA SUBSYSTEM PRODUCTION AND AN/SLQ-32(V)7 INTEGRATION
Solicitation number
N0002419R5519
Issued by

About this file

This is a solicitation notice for the Surface Electronic Warfare Improvement Program (SEWIP) Block 3 Electronic Attack (EA) Subsystem production and integrated AN/SLQ-32(V)7 system requirement N00024-19-R-5519. Offerors are notified that the Request for Proposal has been posted seeking the production of the SEWIP Block 3 EA Subsystem in both the Hemisphere and Quadrant configurations, as well as the integration of the EA Subsystems with components of AN/SLQ-32(V)6 to deliver complete AN/SLQ-32(V)7 systems. Interested parties must have a SECRET facility clearance and be a U.S. company to receive classified attachments and Government Furnished Information, which will be provided through a restricted access online library and by mail. Responses are due in accordance with the instructions in Section L. Supplemental documentation is available in the online library, and offerors should monitor for periodic updates.

View the file

Other files

File Type Posted
N0002419R5519-003 SEWIP Block 3 Production 12.20.2019.pdf PDF
N0002419R5519-004 SEWIP Block 3 Production Conformed 1.06.2020.pdf PDF
19R5519 Questions Responses 1.6.2020.pdf PDF
N0002419R5519-004 SEWIP Block 3 Production 1.06.2020.pdf PDF
N0002419R5519-002 SEWIP Block 3 Production 12.10.2019.docx DOCX document
19R5519 _ J-3 GFP List 12182019.pdf PDF
19R5519 _ J-2 GFI List 12192019.pdf PDF
N0002419R5519-003 SEWIP Block 3 Production 12.20.2019.pdf PDF
19R5519 Bidder Questions Responses 12.20.2019.pdf PDF
N0002419R5519-003 SEWIP Block 3 Production Conformed 12.20.2019.pdf PDF
N0002419R5519-002 SEWIP Block 3 Production 12.10.2019.docx DOCX document
19R5519 Bidder Questions Responses 12.10.2019.pdf PDF
N00024-19-R-5519 Exh A - CDRLs.pdf PDF
N0002419R5519-001 SEWIP Block 3 Production Conformed.pdf PDF
N0002419R5519-001 SEWIP Block 3 Production Amendment 001.pdf PDF
J-6 Production Readiness Review (PRR) Checklist.pdf PDF
J-4 CDRL Glossary 10232019.docx DOCX document
J-14 Resource Distribution Table Example.xls XLS spreadsheet
J-S6 - Classified Material Request Form.docx DOCX document
J-2 GFI List 11082019.pdf PDF
J-S5 - N00024-19-R-5519 Unclassified Terms of Use Agreement.pdf PDF
N0002419R5519 SEWIP Block 3 Production.pdf PDF
J-5_CSDR_20191007_NSEA-19-E-C1_Approved.pdf PDF
J-S4 - N00024-19-R-5519 Classified Terms of Use Agreement.pdf PDF
J-S3 - Bidder Library Access Instructions - SEWIP Block 3.docx DOCX document
Responses to Draft RFP Questions.pdf PDF
J-S2 - Question Submittal Form.xlsx XLSX spreadsheet
A001 Integrated Program Management Report (IPMR)_Signed.pdf PDF
J-3 GFP List 11082019.pdf PDF
SEA 0255-076 SEWIP Block 3 quotes 11.19.2019.pdf PDF
J-13 Quantity Data Report format Template.xlsx XLSX spreadsheet
J-1 DD254 N0002419R5519.pdf PDF
J-S1 - Contractor Award Information.docx DOCX document
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002419R5519

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2000

Each

BLOCK 3 EA SUBSYSTEM HEMISPHERE

FPI

Includes FAQT for first unit. See Note A FOB: Origin (Shipping Point)

PURCHASE REQUEST NUMBER: N0002419NR42027

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER PRICING

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 5
2000
1.00
2.00
3.00
5.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2040

1
Each
OPTION
QUADRANT ENGINEERING MOD

FPI

SEWIP BLOCK 3 EA SUBSYSTEM QUADRANT ENGINEERING MODIFICATION. See Note B

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2100

Each

OPTION
BLOCK 3 EA SUBSYSTEM - HEMISPHERE

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 5
2100
1.00
2.00
3.00
5.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2150

Each

OPTION
BLOCK 3 EA SUBSYSTEM - QUADRANT

FPI

Includes FAQT for first unit. See Notes A and C

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
2150
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2200

Each

OPTION
BLOCK 3 EA SUBSYSTEM - HEMISPHERE

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 6
2200
1.00
2.00
3.00
4.00
5.00
6.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2250

Each

OPTION
BLOCK 3 EA SUBSYSTEM - QUADRANT

FFP

This item may only be exercised in the event that CLIN 2150 is previously exercised. If this CLIN is exercised, CLIN 2251 will become reserved. See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
2250
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2251

Each

OPTION
BLOCK 3 EA SUBSYSTEM - QUAD w/ FAQT

FPI

Includes FAQT in first unit. This item is only to be exercised in the event that CLIN 2150 is NOT exercised. If this CLIN is exercised, CLIN 2250 will become reserved. See Notes A and C

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
2251
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2300

Each

OPTION
BLOCK 3 EA SUBSYSTEM - HEMISPHERE

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 9
2300
1.00
2.00
3.00
5.00
6.00
9.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2350

Each

OPTION
BLOCK 3 EA SUBSYSTEM - QUADRANT

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
2350
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2400

Each

OPTION
BLOCK 3 EA SUBSYSTEM - HEMISPHERE

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 7
2400
1.00
2.00
3.00
4.00
5.00
7.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 2450

Each

OPTION
BLOCK 3 EA SUBSYSTEM - QUADRANT

FFP

See Notes A and C

NET AMT

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
2450
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4200

Each

OPTION
AN/SLQ-32(V)7

FPI

Hemisphere System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 5
4200
1.00
2.00
3.00
5.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4300

Each

OPTION
AN/SLQ-32(V)7

FPI

Hemisphere System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 5
4300
1.00
2.00
3.00
5.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4350

Each

OPTION
AN/SLQ-32(V)7

FPI

Quadrant System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
4350
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4400

Each

OPTION
AN/SLQ-32(V)7

FPI

Hemisphere System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 6
4400
1.00
2.00
3.00
4.00
5.00
6.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4450

Each

OPTION
AN/SLQ-32(V)7

FPI

Quadrant System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
4450
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4500

Each

OPTION
AN/SLQ-32(V)7

FPI

Hemisphere System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 9
4500
1.00
2.00
3.00
5.00
6.00
9.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4550

Each

OPTION
AN/SLQ-32(V)7

FPI

Quadrant System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
4550
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4600

Each

OPTION
AN/SLQ-32(V)7

FPI

Hemisphere System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 7
4600
1.00
2.00
3.00
4.00
5.00
7.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 4650

Each

OPTION
AN/SLQ-32(V)7

FPI

Quadrant System Integration See Note A

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

STEPLADDER NAME
ITEM NO
FROM QUANTITY
TO QUANTITY
UNIT PRICE
MAX 4
4650
1.00
2.00
3.00
4.00
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 9800

1
Each

Provisioned Item Orders (PIO)

FFP

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLIN Number 9900

Lot

Data

Data in accordance with CDRLs NSP

NET AMT

SECTION B NOTES

NOTE A - Stepladder Pricing Stepladder pricing is utilized in this solicitation to provide offerors an opportunity to propose different pricing for separate and distinct quantity ranges within each CLIN. Pricing utilized at basic contract award and option exercise shall be based solely on the pricing proposed by the offeror in Section B of the submitted Standard Form (SF) 33. Notwithstanding the availability of the option to propose different pricing for different quantities, the offeror may propose the same price for multiple quantities.

At the time of award, the Government will determine the quantity of base CLIN 2000. As administrative placeholders, the Government will enter the minimum stepladder QTYs and the corresponding proposed unit prices for all stepladder Option CLINs. The Government reserves the right to unilaterally adjust the quantity and unit price of each stepladder Option CLIN in accordance with (IAW) this Note (Note A), if and to the extent said Option CLINs are exercised.

For all CLINs with stepladder pricing, the Government may unilaterally exercise a given line item more than once prior to the latest option exercise date identified in clause FAR 52.217-7 (see Section I, below) or, for base year CLINs, within 90 days of contract award. Option CLINs with stepladder pricing may be exercised until the total quantity purchased equals the maximum quantity listed for that option CLIN in Section B.

If any line item is exercised more than once within a 90-day period, the unit price shall be adjusted downward to reflect the appropriate stepladder unit price for the entire quantity purchased within that 90 day-period. The following hypothetical example illustrates how pricing will be adjusted for option CLIN 2100 if the line item is unilaterally exercised more than once within a 90-day period:

CLIN 2100

Step-ladder Quantity
Unit Price
100-200
$150
201-300
$120
301-400
$100

· At first option exercise, $22,500 is obligated to subline item (SLIN) 210001 to provide funds to acquire a quantity of 150 at a unit cost of $150.

150 * $150 = $22,500

· A second option exercise, $12,500 is obligated to SLIN 210002 to provide funds to acquire an additional 200 units for a total quantity of 350 at a unit cost of $100.

350 * $100 = $35,000

· In order to provide for a total extended price of $35,000 without altering the unit pricing of the prior option exercise, the unit cost for SLIN 210002 is adjusted downward to $62.50.

($35,000 - $22,500) / 200 = $62.50

· Following exercise of our first two options for CLIN 2100, our contract CLIN structure for CLIN 2100 is as follows:

CLIN
SLIN
QUANTITY
UNIT COST
EXTENDED PRICE
FUNDED AMOUNT
N/A
N/A
N/A
N/A
2100
01
150
$150.00
$22,500
$22,500
2100
02
200
$62.50
$12,500
$12,500

SUBTOTAL

350
$100.00
$35,000
$35,000

Note B – DETERMINATION OF SCHEDULE INCENTIVE FOR CLIN 2040

As part of the FPIF structure for CLIN 2040, the Contractor may earn a positive or negative Schedule Incentive. The Government's purpose for including a Schedule Incentive is to encourage and reward Contractor initiative toward achieving a cost less than the SEWIP Block 3 Engineering Modification Target Cost and completing CLIN 2040, Engineering Modification, ahead of schedule.

In the event the Contractor underruns the Target Cost and delivers an early completion of CLIN 2040, the Contractor may earn a greater share of the underrun based on the following:

30 – 59 calendar days early completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLIN under run share to 40/60, or

60 calendar days or earlier completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLINunder run share to 30/70.

Pursuit of the Schedule Incentive shall not come at the expense of the overall SEWIP Block 3 effort. In the event of an overrun, no positive schedule incentive may be earned.

The Contractor will bear the following penalties:

In the event the Contractor underruns the Target Cost and delivers a late completion of CLIN 2040, the Contractor may earn a lesser share of the underrun based on the following:

30 – 59 calendar days late completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLIN under run share to 60/40, or

60 calendar days or later completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLIN under run share to 70/30.

In the event the Contractor overruns the Target Cost and delivers a late completion of CLIN 2040, the Contractor will bear a greater share of the overrun based on the following:

30 – 59 calendar days late completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLIN over run share to 40/60, or

60 calendar days or later completion of CLIN 2040 from the delivery date specified in Section F will result in a unilateral modification to update Section I 52.216-16 and Section B applicable CLIN over run share to 30/70.

Schedule Incentive Determination Procedures. Upon early successful passing of exit criteria as detailed for Item 2040 in the SOW, the Contracting Officer will use data including but not limited to CPR data, invoices, and data from audited/approved business systems available in the accounting periods during performance and within a year following completion of CLIN 2040. Within 1 year of completion of CLIN 2040, the Contracting Officer will issue a unilateral modification revising the underrun shareline pursuant to the above incentive, if the criteria are determined to have been met.

The Government’s determination of Schedule Incentive earned is a unilateral decision made solely at the discretion of the Contracting Officer based on the reliability of data available.

NOTE C – PRODUCTION EFFICIECIES

The Contractor MAY assume quantity bundling efficiencies between the quadrant and hemisphere production CLINs in each Fiscal Year (indicated by the same 100 series CLIN number 21XX vs 22XX and so on). If exercised, production CLINs in the 23XX and 24XX series for both the Hemisphere configuration and Quadrant configuration will be exercised together (ex. 2300 & 2350). For the 21XX and 22XX series CLINs, exercising the Hemisphere configuration and Quadrant configuration system CLINs together is desirable, but not a guarantee. Exercising the 21XX and 22XX series CLINs separately will not be considered cause for renegotiating pricing.

TOTAL CONTRACT QUANTITIES

Notwithstanding the sum of the stepladder pricing quantity ranges included above, no more than 32 systems may be purchased under this contract in the following configurations:

Configuration
CLINs
Total Quantity
SEWIP BLOCK 3 EA SUBSYSTEM – HEMISPHERE
2000, 2100, 2200, 2300, 2400
25
SEWIP BLOCK 3 EA SUBSYSTEM - QUADRANT
2150, 2250, 2251, 2350, 2450
7

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor. Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid. If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

FOR SEWIP BLOCK 3 ELECTRONIC ATTACK (EA) SUBSYSTEM PRODUCTION

AND AN/SLQ-32(V)7 INTEGRATION

1.0 SCOPE

This Statement of Work (SOW) defines the effort required for the production of the Surface Electronic Warfare Improvement Program (SEWIP) Block 3 Electronic Attack (EA) Subsystem and ancillary equipment, heretofore referenced as the EA Subsystem. Additionally, this SOW defines the effort required for integration of each EA Subsystem with a Government furnished AN/SLQ-32(V)6 to form and deliver a complete AN/SLQ-32(V)7 system.

There are two configurations of the EA Subsystem, the Hemisphere configuration and the Quadrant configuration. The Hemisphere configuration is designated for installation on Arleigh Burke Class DDGs. The Hemisphere Configuration TDP is included as GFI in attachment J-2. The Quadrant configuration is designated for Nimitz and Ford Class Aircraft Carriers (CVN) and Wasp Class Landing Helicopter Deck (LHD) amphibious assault ships. In order to install on CVN and LHD, limited hardware design modifications are required for the Quadrant Configuration.

SEWIP Block 3 EA Subsystem

Hemisphere Configuration
Quadrant Configuration*
EA Subsystem Drawing Number
8706400**
TBD
QPA Subsystem Drawing Number
8766416/8766417
TBD
Power Fuse Assembly Drawing Number
8705361
TBD
Supply Manifold Drawing Number
8705328
TBD
Return Manifold Assembly Drawing Number NNumberNumber
8705399
TBD
Gasket for Mounting Quad Plate Drawing Number
8706765
TBD
RAM for Quad 1 and 3 Drawing Number
8706768
TBD
RAM for Quad 2 and 4 Drawing Number
8706768
TBD
Signal Distribution Box Drawing Number
8766435
TBD
Equalizers
8704432
TBD

*Part numbers for the Quadrant configuration will be provided in the event CLIN 2040 is exercised.

** Including all applicable TDP Addendum items and other items listed in this table.

This SOW defines the efforts required for:

· Production of the Hemisphere Configuration (CLINs 2000, 2100, 2200, 2300 and 2400)

· Hardware design modifications to establish the Quadrant Configuration (CLIN 2040) including delivery and Government approval of the associated updates to the TDP (CDRLs A032 – A037)

· Production of the Quadrant Configuration (CLINs 2150, 2250, 2251, 2350 and 2450) upon Government approval of the Quadrant Configuration TDP (CDRLs A032 – A037).

· Integration of the EA Subsystem with a Government furnished AN/SLQ-32(V)6 to deliver complete AN/SLQ-32(V)7 systems (CLINs 4200, 4300, 4350, 4400, 4450, 4500, 4550, 4600 and 4650).

· Provision Item Orders (CLIN 9800)

· Data Deliverables (CLIN 9900)

1.1 CLIN SPECIFIC REQUIREMENTS

1.1.1 HEMISPHERE PRODUCTION (CLINs 2000, 2100, 2200, 2300, and 2400) The contractor shall provide all of the personnel, facilities, equipment and fixtures to manufacture, assemble, test, and deliver the SEWIP Block 3 EA Subsystem Hemisphere configuration. All Hemisphere configuration production units presented for acceptance shall be manufactured and assembled in accordance with (IAW) the Technical Data Package (TDP) (provided as GFI in Attachment J-2) and other Government Furnished Information (GFI) incorporated herein (Attachment J-2). The Hemisphere configuration shall be tested in accordance with the Government approved test procedures (CDRLs A015, A019 and A021).

1.1.1.1 First Article Qualification Test (FAQT) (CLIN 2000)

FAQT is applicable to the first deliverable unit of the Hemisphere configuration production. The contractor shall conduct a FAQT on the first manufactured unit for each of the EA Subsystem configurations. The contractor shall develop and deliver Block 3 EA Subsystem level FAQT plans and procedures, CDRL A015, for the Hemisphere configurations. FAQT procedures at the component level are provided as GFI as a basis for developing the FAQT procedures at the Subsystem level. The Contractor shall document results of the FAQTs and deliver a FAQT report, CDRL A016. Government approval of the FAQT report shall be a prerequisite to acceptance of the first manufactured unit for each configuration. The Contractor shall own or have access to equipment and facilities capable of testing IAW the approved test procedure(s). The Contractor shall correct all deficiencies found as a result of FAQT.

1.1.1.2 Exit Criteria for CLINs 2000, 2100, 2200, 2300, and 2400 The contractor shall have completed this CLIN when:

1. All required material has been procured, manufactured and assembled.

2. The first unit of the Hemisphere configuration has successfully completed an IA Scan Assessment.

3. The first unit of the Hemisphere configuration has successfully completed FAQT.

4. The first unit of the Hemisphere configuration has successfully completed a Functional Configuration Audit.

5. The first unit of the Hemisphere configuration has successfully completed a Physical Configuration Audit (PCA).

6. Each unit has successfully completed Environmental Stress Screening (ESS).

7. Each unit has successfully completed Factory Acceptance Testing (FAT).

8. Each unit has successfully passed inspection at Origin.

9. Following CDRLs below have been received and approved by the Government, with all re-occurring CDRLs delivered as current/final having been approved by the Government:

a. IA Support Plan (CDRL A004) and IA Test Report (CDRL A005)

b. FAQT Procedure (CDRL A015) and FAQT Report (CDRL A016)

c. FCA Plan (CDRL A017) and FCA Report (CDRL A018)

d. PCA Plan (CDRL A017) and PCA Report (CDRL A018)

e. ESS Procedures (CDRL A019) and ESS Report (CDRL A020)

f. FAT Procedures (CDRL A021) and FAT Report (CDRL A022)

g. ABCL (CDRL A025)

1.1.2 LIMITED DESIGN MODIFICATION FOR QUADRANT CONFIGURATION (CLIN 2040)

The Contractor shall complete limited design modifications for a Quadrant Configuration compatible with LHD, CVN-68, and CVN-78 ship classes and in accordance with MIL-STD-777F, based on the current Hemisphere Configuration TDP and any additional supplemental information provided as GFI.

The Contractor shall develop, update, and deliver the following:

1. Product Drawings/Models and Associated Lists (CDRL A032)

2. Commercial Drawings/Models and Associated Lists (CDRL A033)

3. Special Inspection Equipment Drawings/Models and Associated Lists (CDRL A034)

4. Special Tooling Drawings/Models and Associated Lists (CDRL A035)

5. Detail Specifications (CDRL A036) IAW MIL-STD-961E for those items contained in the above TDP drawings/models to support performance, procurement, material, item, and process related specifications.

6. Special Packaging Instructions (CDRL A037)

1.1.2.1 Technical Interchange Meetings (TIMs)

For the limited engineering design modifications to establish the Quadrant Configuration, the Contractor shall host and participate in Technical Interchange Meetings (TIMs) leading up to each System Engineering Technical Review (SETR). The Contractor shall plan for at least three functional area TIMs leading up to each SETR event. The Contractor shall propose the schedule, location and security requirements for all TIMs, which are subject to Government approval. The contractor shall prepare and deliver an agenda, CDRL A002 for each TIM. Following each TIM, the Contractor shall prepare deliver Meeting Minutes, CDRL A003.

1.1.2.2 System Engineering Technical Review (SETR)

The Contractor shall conduct the following SETRs to capture requirement derivations and design updates from the Hemisphere Configuration to the Quadrant Configuration:

1. System Requirements Review (SRR)

2. Hardware Critical Design Review (CDR)

1.1.2.2.1 System Requirements Review (SRR)

The Contractor shall conduct a SRR. The Contractor shall prepare and deliver an agenda IAW CDRL A002. The SRR may be tailored, subject to Government approval, to focus only on the proposed modifications to update a Hemisphere configuration to a Quadrant configuration consistent with LHD, CVN-68, and CVN-78 ship classes. Following the SRR, the Contractor shall prepare deliver meeting minutes IAW CDRL A003 and the Design Review Information Package (DRIP) IAW CDRL A038. The Dynamic Object-Oriented Requirements System (DOORS) will be provided as GFI; the contractor shall update DOORS as required and deliver IAW CDRL A039.

1.1.2.2.2 Hardware Critical Design Review (CDR)

The Contractor shall conduct a Hardware CDR IAW the NAVSEA 05H Technical Review Manual (TRM). The Contractor shall prepare and deliver an agenda, CDRL A002. The CDR may be tailored, subject to Government approval, to focus only on the proposed modifications to update a Hemisphere configuration to a Quadrant configuration consistent with LHD, CVN-68, and CVN-78 ship classes. For the CDR, the Contractor shall specifically identify the updated test and modifications to the two phase cooling loop and demonstrate that any modifications provide sufficient cooling to the arrays. Following the CDR, the Contractor shall prepare and deliver meeting minutes, CDRL A003 and the Design Review Information Package (DRIP), CDRL A038.

1.1.2.3 Industrial Test Procedures

The Contractor shall develop and deliver Industrial Test Procedures for Non-Aegis, CDRL A040, IAW MIL-STD-2106.

1.1.2.4 Installation Control Drawings

The Contractor shall develop and deliver Installation Control Drawings (ICD) (CDRL A041) IAW MIL-D-23140, for each SEWIP Block 3 configuration, which shall define the mechanical mounting, cooling, and electrical power, and the HSI footprint around the SEWIP Block 3 equipment for both the operator and the maintainer. The ICD shall contain the 3D solid model drawings to include part models, subassemblies, assemblies, and 2D layouts delivered in native 3D/2D CAD formats. The Contractor shall establish control of all mechanical and electrical interface requirements for all SEWIP Block 3 equipment IAW MIL-D-23140. The Contractor shall provide signal and power interconnect diagrams for the EA subsystem and modified (V)6 to support integration into the overall AN/SLQ-32(V)7 ICD package. The Contractor shall identify any updates to facility requirements in support of end item training/trainer sites.

1.1.2.5 Design for Maintainer

Based on the Quadrant Configuration design modifications, the Contractor shall update and deliver the GFI provided EA subsystem Human Engineering Design Approach Document – Maintainer (HEDAD-M) (CDRL A042) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.6 Reliability

Based on the Quadrant Configuration design modifications, the Contractor shall update and deliver the GFI provided Reliability Block Diagram (RBD) and Mathematical Models Report (CDRL A043) based on modifications to update a Hemisphere configuration to a Quadrant configuration. The Contractor shall systematically manage the elimination of failures and failure modes through Failure Modes, Effects and Criticality Analysis (FMECA) Report (CDRL A044).

1.1.2.7 Life Cycle Cost (LCC)

Based on the Quadrant Configuration design modifications, the Contractor shall update and deliver the GFI provided Life Cycle Cost (LCC) and Independent Schedule Assessment (ISA) Report (CDRL A046)

1.1.2.8 Maintainability

Based on the Quadrant Configuration design modifications, the Contractor shall provide a comprehensive description of the Integrated Health Management System (IHMS) design of the system IAW CDRL A047. The IHMS shall provide detail pertaining to data architecture, design at the subsystem/system levels, testing, and any other detailed information critical to the full maturation of the IHMS including but not limited to all Built-in- Test (BIT) faults, mechanical diagnostics exceedances and other health management state parameters to assess the health of the system.

1.1.2.9 Logistics Product Data (LPD)

Based on the Quadrant Configuration design modifications, the Contractor shall update, maintain and deliver the GFI provided LPD (CDRL A048)

1.1.2.10 Reliability Growth

Based on the Quadrant Configuration design modifications, the Contractor shall update and deliver EA subsystem Reliability Development Growth Test Procedures (CDRL A049).

1.1.2.11 Human Systems Integration Program Plan (HSIPP)

The Contractor shall update and deliver a SEWIP Block 3 Human System Integration Plan (HSIPP) (CDRL A051) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.12 Human Engineering System Analysis

The Contractor shall update and deliver a Human Engineering System Analysis Report (HESAR) (CDRL A052) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.13 Subsystem Hazard Analysis Report

The Contractor shall update and deliver a Subsystem Hazard Analysis Report (SSHA) (CDRL A053) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.14 Operating and Support Hazard Analysis Report

The Contractor shall update and deliver an Operating and Support Hazard Analysis Report (O&SHA) (CDRL A054) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.15 Safety Assessment Report

The Contractor shall update and deliver a Safety Assessment Report (SAR) (CDRL A055) based on modifications to update a Hemisphere configuration to a Quadrant configuration.

1.1.2.16 Exit Criteria for CLIN 2040

The contractor shall have completed this CLIN when:

1. The contractor successfully completes SRR and CDR:

a. DRIP (CDRL A038)

b. DOORS (CDRL A039)

2. A complete TDP has been received and accepted by the Government including:

a. Product Drawings/Models and Associated Lists (CDRL A032)

b. Commercial Drawings/Models and Associated Lists (CDRL A033)

c. Special Inspection Equipment Drawings/Models and Associated Lists (CDRL A034)

d. Special Tooling Drawings/Models and Associated Lists (CDRL A035)

e. Detail Specifications (CDRL A036)

f. Special Packaging Instructions (CDRL A037)

3. All CDRLs below have been received and approved by the Government, with all re-occurring CDRLs delivered as current/final having been approved by the Government:

a. Industrial Test Procedures (CDRL A040)

b. ICDs (CDRL A041)

c. HEDAD-M (CDRL A042)

d. RBD and Mathematical Models Report (CDRL A043)

e. FMECA (CDRL A044)

f. LCC ISA Report (CDRL A046)

g. IHMS (CDRL A047)

h. LPD (CDRL A048)

i. Reliability development Growth Test (CDRL A049)

j. HSIPP (CDRL A051)

k. HESAR (A052)

l. SHAA (CDRL A053)

m. O&SHA (CDRL A054)

n. SAR (CDRL A055)

1.1.3 QUADRANT PRODUCTION (CLINs 2150, 2250, 2251, 2350, and 2450) The contractor shall provide all of the personnel, facilities, equipment and fixtures to manufacture, assemble, test, and deliver the SEWIP Block 3 EA Subsystem Quadrant Configuration. The Contractor shall manufacture the Quadrant Configuration IAW the Government approved TDP resulting from the limited design modification for a Quadrant Configuration, CLIN 2040 and approval of CDRLs A032 – A037.

All Quadrant configuration production units presented for acceptance shall be manufactured and assembled IAW the Government approved TDP resulting from the limited design modification for a Quadrant Configuration, CLIN 2040 and approval of CDRLs A032 – A037. The Quadrant configuration shall be tested in accordance with the Government approved test procedures (CDRLs A015, A019 and A021).

1.1.3.1 First Article Qualification Test (FAQT) (CLIN 2150 OR 2251) FAQT is applicable to the first deliverable unit of the Quadrant configuration production. The contractor shall conduct a FAQT on the first manufactured unit for each of the EA Subsystem configurations. The contractor shall develop and deliver Block 3 EA Subsystem level FAQT plans and procedures, CDRL A015, for the Quadrant configurations. FAQT procedures at the component level are provided as GFI as a basis for developing the FAQT procedures at the Subsystem level. The Contractor shall document results of the FAQTs and deliver a FAQT report, CDRL A016. Government approval of the FAQT report shall be a prerequisite to acceptance of the first manufactured unit for each configuration. The Contractor shall own or have access to equipment and facilities capable of testing IAW the approved test procedure(s). The Contractor shall correct all deficiencies found as a result of FAQT.

1.1.3.2 Exit Criteria for CLINs 2150, 2250, 2251, 2350, and 2450 The contractor shall have completed this CLIN when:

1. All required material has been procured, manufactured and assembled.

2. The first unit of the Quadrant configuration has successfully completed IA Scan Assessment.

3. The first unit of the Quadrant configuration has successfully completed FAQT.

4. The first unit of the Quadrant configuration has successfully completed a Physical Configuration Audit (PCA).

5. Each unit has successfully completed Environmental Stress Screening (ESS).

6. Each unit has successfully completed Factory Acceptance Testing (FAT).

7. Each unit has successfully passed inspection at Origin.

8. All CDRLs below have been received and approved by the Government, with all re-occurring CDRLs delivered as current/final having been approved by the Government:

a. IA Support Plan (CDRL A004) and IA Test Report (CDRL A005)

b. FAQT Procedure (CDRL A015) and FAQT Report (CDRL A016)

c. FCA Plan (CDRL A017) and FCA Report (CDRL A018)

d. PCA Plan (CDRL A017) and PCA Report (CDRLA018)

e. ESS Procedures (CDRL A019) and ESS Report (CDRL A020)

f. FAT Procedures (CDRL A021) and FAT Report (CDRL A022)

g. ABCL (CDRL A025)

1.1.4 (V)7 INTEGRATION (CLIN 4200, 4300, 4350, 4400, 4450, 4500, 4550, 4600, and 4650) The Contractor shall provide all of the personnel, facilities, equipment, and fixtures required to integrate and test the SEWIP Block 3 EA Subsystems previously delivered under the production CLINs with the specified components of AN/SLQ-32(V)6, detailed below and provided as GFM, to deliver a complete and fully integrated AN/SLQ-32(V)7 in both the Hemisphere and Quadrant configuration. The contract shall provide any additional required cables or ancillary equipment to deliver a complete and fully integrated AN/SLQ-32(V)7.

Hemisphere Configuration
Quadrant Configuration
Block 2 ES Subsystem Drawing Number
8493935G3
8493935G3 + 8493970G4*
Block 1B3 HGHS Subsystem Drawing Number
77C734560G1
77C734560G1
Block 1B2 SEI Subsystem Drawing Number
N/A – Not provided
N/A – Not provided
LCU Single Pump Drawing Number
7392144-01
7392144-01
Common Processing System (CPS) Drawing Number
TBD
TBD
Common Display System (CDS) Drawing Number
TBD
TBD
AN/SLA-10D Blanker Drawing Number
8579018
8579018

*Note: Quadrant configuration includes an extra set of Antenna Support Electronics Assembly (ASEA) Drawing 8493970G4 (1 set consists of qty 2 of drawing 8493970G4).

The Contractor shall develop and provide a System Integration and Test Plan and Procedures, CDRL A030 utilizing the (V)6 procedures, white paper provided as GFI, and the approved FAT procedures from 3.8.5 for both the Hemisphere and Quadrant Configurations. The integrated AN/SLQ-32(V)7 system inclusive of all items presented for acceptance shall be integrated, and tested in accordance with the approved System Integration Plan and Procedures (CDRL A030), GFI incorporated herein, and applicable clauses in this contract. The Contractor shall document and deliver the results of the AN/SLQ-32(V)7 integrated test in the Systems Integration Test, CDRL A031. The contractor shall integrate required software and hardware components, test, and deliver systems IAW the approved TDP for systems covered under this SOW. At a minimum, the Contractor shall test the integrated AN/SLQ-32(V)7 system to demonstrate the successful completion of built-in-test paths of the system. The methods and techniques used during integration and assembly shall ensure compliance with all requirements of the System/Subsystem Specification (SSS).

1.1.4.1 Exit Criteria for CLINs 4200, 4300, 4350, 4400, 4450, 4500, 4550, 4600, and 4650 The contractor shall have completed this CLIN when:

1. The Block 3 subsystem has been integrated with the (V)6 System.

2. The (V)7 System successfully completes System Integration Testing.

3. Each (V)7 System successfully passes inspection at origin.

4. All CDRLs below have been received and accepted by the Government, with all re-occurring CDRLs delivered as current/final having been accepted by the Government:

a. Systems Integration Test Plan (CDRL A030) and System Integration Report (CDRL A031)

1.1.5 PROVISIONED ITEM ORDERS (CLINs 9800)

See C-217-H001 PROVISIONED ITEMS ORDERS--BASIC (NAVSEA) (OCT 2018).

1.1.6 DATA (CLIN 9900)

The data to be furnished hereunder shall be prepared IAW CDRL, DD Form 1423.

1.1.6.1 Integrated Digital Data Environment (IDDE)

The Contractor shall use the Government-furnished IDDE to transmit unclassified CDRLs and documents. All Contractor source data published in the IDDE shall be in native format unless otherwise specified. The Government IDDE requires PKI/CAC credentials for access, and the contractor shall be responsible for obtaining/maintaining necessary access credentials. Access to the Government IDDE may be obtained from the Contracting Officer’s Representative.

2.0 APPLICABLE DOCUMENTS

Unless otherwise indicated, copies of federal and military specifications, standards, instructions and handbooks are available on the internet at the Department of Defense Single Stock Point (DODSSP) at http://dodssp.daps.dla.mil. Joint Chief of Staff, DoD Directives (DoDD), Instructions (DoDI) and Publications documents can be found on the Acquisition, Technology, and Logistics (AT&L) Acquisition Knowledge Sharing System (AKSS) at http://akss.dau.mil/jsp/default.jsp or at the DoD Directives, Instructions and Publications documents, as well as other services publications at DoD Issuances website at: http://www.dtic.mil/whs/directives/. Due to copyright laws, Non- Government documents will not be provided as GFI and should be obtained from the commercial sources.

2.1 MANDATORY DOCUMENTS

The following documents are required to be used and followed in the performance of this SOW except as described in Section 2.3:

Document NumberTitleEffective Date
SAE ANSI/EIA-649CConfiguration Management Standard07 FEB 2019
SAE ANSI/EIA-649-1Configuration Management Requirements For Defense Contracts20 NOV 2014
ANSI/EIA-748BEarned Value Management SystemsJUN 2007
ASME Y14.24Types and Applications of Engineering Drawings01 JAN 2012
ASME Y14.34Associated Lists01 JAN 2013
ASME Y14.100Engineering Drawing Practices14 NOV 2017
DoD 5000.4-MCost Analysis Guidance and Procedures
DoD 5000.04–M–1Cost and Software Data Reporting Manual.
DoD 5220.22-MNational Industrial Security Program Operating Manual (NISPOM)
DoDI 8500.01Cybersecurity14 MAR 2014
GEIA-STD-0007-ALogistics Product Data01 JUN 2010
GEIA-HB-0007-ALogistics Product Data01 FEB 2010
MIL-D-23140Military Specification: Drawings, Installation Control, for30 APR 1982

Electronic Equipment, MIL-DTL-24784C Detail Specification: Manuals, Technical: General Acquisition 03 NOV 2007 and Development Requirements, General Specification

MIL-STD-130N(1)Identification Marking of U.S. Military Property16 NOV 2012
MIL-STD-777FSchedule of Piping, Valves, Fittings, And Associated Piping30 MAR 2012

Components for Naval Surface Ships

MIL-STD-881DWork Breakdown Structures for Defense Material Items19 JUN 2018
MIL-STD-1285D(2)Marking of Electrical and Electronic Parts22 JUN 2018
MIL-STD-1472GDepartment of Defense Design Criteria Standard Human Engineering11 JAN 2012
MIL-STD-1686CElectrostatic Discharge Control Program for Protection of25 OCT 1995
Electrical and Electronic Parts, Assemblies and Equipment
MIL-STD-2073 1EDoD Standard Practice for Military Packaging07 JAN 2011

w/Change 1 MIL-STD-2106 DoD Standard Practice Development of Shipboard Industrial Test 04 JUN 2016 Procedures

MIL-STD-31000Technical Data Packages05 NOV 2009
NIST SP 800-171-REV1Naval Institute of Standards Special Publication 800-171 Revision 1DEC 2016
NAVSEA INST 9400.2Implementation of Naval Sea Systems Command (NAVSEA)20 SEP 2016

Afloat Information Assurance and Guidance

TA-HB-0007-01Handbook and Guide for Logistics Product Data Reports01 May 2013
NoneDoD AT Security Classification Guide17 MAR 2010
NoneNAVSEA Prohibited and Controlled Chemical List (PCCL),26 NOV 2008

SEA 04R letter Serial 03R/138 None NAVSEA 05H Technical Review Manual (TRM) Version 2.0 18 DEC 2009

2.2 GUIDANCE

The following publications will be used for Guidance only:

Document NumberTitleEffective Date
ANSI/EIA-632Processes for Engineering a System01 SEP 2003
ANSI/NISO Z39.18-Scientific and Technical Reports – Preparation, Presentation, and2010
2005 (R2010)Preservation
ASME Y14.35Revision of Engineering Drawings and Associated Documents29 AUG 2014
ASME Y14.38Abbreviations and Acronyms for Use on Drawings and01 JAN 2007

Related Documents

ASTM D 3951-18Standard Practice for Commercial Packaging2018
ASTM F1166-07Standard Practice for Human Engineering Design for Marine01 OCT 2013

Systems, Equipment, and Facilities ASTM F1337-10R15 Standard Practice for Human Engineering Program Requirements 2015 for Ships and Marine Systems, Equipment, and Facilities

DoD IUID GuideDoD Guide to Uniquely Identifying Items16 SEP 2015
DoD Manual 4245.7-MTransition from Development to Production13 FEB 1989
DoDI 5000.02Operation of the Defense Acquisition System10 AUG 2017
DoDI 5200.39Critical Program Information (CPI) Protection within the DoD16 JUL 2008
DoDI 8510.01Risk Management Framework (RMF) for DoD Information12 MAR 2014

Technology (IT) DoDI S-5230.28 Low Observable (LO) and Counter Low Observable (CLO) 26 MAY 2005 Programs (U) GEIA-STD-0009 Reliability Program Standard for System Design, Development and 01 AUG 2008 Manufacturing

IEEE/EIA 12207.0Standard for Information Technology Software Life Cycle Processes01 MAY 1996
IEEE/EIA 12207.1Standard for Information Technology Software Life Cycle Processes01 MAY 1997
Life Cycle Data
IEEE/EIA 12207.2Standard for Information Technology Software Life Cycle Processes01 MAY 1997

Implementation Considerations

ISO 10007Quality Management Systems, Guidelines for CM, Third Edition01 MAR 2017
ISO 9000:2005Quality Management Systems – Fundamentals and Vocabulary2005

and Requirements

ISO 9001:2008Quality Management Requirements2008
ISO 9001:2015Quality Management Systems — RequirementsSEP 2015
ISO-10303-AP232Industrial Automation Systems and Integration — Product Data
Representation and Exchange30 JUN 2006
ISO/IEC 12207:2008Systems and Software Engineering - Software Life Cycle Processes01 FEB 2008
ISO/IEC-15288:2008Systems Engineering- System Life Cycle Processes2008
MIL-HDBK-61AConfiguration Management Guidance07 FEB 2001
MIL-HDBK-189CReliability Growth Management14 JUN 2011
MIL-HDBK-235/1CDepartment of Defense handbook: Operational Electromagnetic01 OCT 2010

Environment profiles (part 1C) General Guidance

MIL-HDBK 454BGeneral Guidelines for Electronic Equipment15 APR 2007
MIL-HDBK-461FRequirements for the Control of Electromagnetic Interference10 DEC 2007

Characteristics of Subsystems and Equipment

MIL-HDBK-470ADesigning and Developing Maintainable Products and Systems31 MAY 2012
MIL-HDBK-472Military Standardization Handbook: Maintainability Prediction24 MAY 1966
MIL-HDBK-502Acquisition logistics30 MAY 1997
MIL-HDBK-781AReliability Test Methods, Plans, and Environments for Engineering01 APR 1996

Development, Qualification, and Production

MIL-HDBK-881AWork Breakdown Structures30 JUL 2005
MIL-HDBK-896Manufacturing and Quality Program08 AUG 2008
MIL-HDBK-1785DoD Handbook: System Security Engineering Program01 AUG 1995

Management Requirements

MIL-HDBK-1980BDefinitions for Human Factors Terms26 JUN 2018
MIL-HDBK-2155Failure Reporting, Analysis And Corrective Action Taken11 DEC 1995
MIL-HDBK-29612Department of Defense Handbook: Guidance for Acquisition of31 AUG 2001

Training Data Products and Services (1A through 5A)

MIL-HDBK-2036Preparation of Electronic Equipment Specifications01 NOV 1999
MIL-HDBK-2164AEnvironmental Stress Screening Process for Electronic Equipment19 JUN 1996
MIL-P-24534APlanned Maintenance System: Development of Maintenance21 MAR 1991

Requirement Cards, Maintenance Index Pages, and Associated Documentation

MIL-PRF-29612BPerformance Specification, Training Data Products31 AUG 2001
MIL-STD-129RMilitary Marking for Shipment and Storage24 MAY 2018
MIL-STD-196FJoint Electronics Type Designation Automated System30 MAY 2018
MIL-STD-464CDoD Interface Standard: Electromagnetic Environmental Effects,01 DEC 2010

Requirements for Systems MIL-STD-471A Military Standard: Maintainability Verification/Demonstration/ 27 MAR 1973 Evaluation

MIL-STD-810GTest Method Standard for Environmental Engineering31 OCT 2008
MIL-STD-882EStandard Practice for System Safety11 MAY 2012
MIL-STD-961EDoD Standard Practice for Defense SpecificationsAPR 2008
MIL-STD-2042DOD STANDARD PRACTICE: 104 FIBER OPTIC TOPOLOGY25 JUL 2002

INSTALLATION STANDARD METHODS FOR NAVAL SHIPS

MIL-STD-3018Standard Practice: Parts Management15 OCT 2007
MIL-STD-3022Documentation of Verification, Validation, and Accreditation28 JAN 2008

(VV&A) for Models and Simulations MIL-STD-3034 Department of Defense Standard Practice: Reliability-Centered 21 JAN 2011 Maintenance (RCM) Process

MIL-STD-46855AHuman Engineering Processes and Procedures20 MAY 2011
NAVSEA INST 5510Secure Software Coding Governance and Guidance (G&G)15 May 2012
For The NAVSEA Domain
NAVSEA SW020-Weapon System Safety Guidelines Handbook01 FEB 2006

AH-SAF-010

NAVSEA INST 5000.8Naval SYSCOM Risk Management Policy21 JUL 2008
NAVSEA STD 03-012008 Common Presentation Layer SpecificationMAR 2008
NAVSEA S9081-AB-Reliability Centered Maintenance (RCM) Handbook18 APR 2007

GIB-010

NAVSO P-6071Best Practices for Manufacturing PlanningMAR 1986
NCDS 516Naval Combatant Design Specification Section 516AUG 2014
S6430-AE-TED-010Technical Directive for Piping Devices, Flexible Hose Assemblies20 JAN 2012
NIST Interagency -Notional Supply Chain Risk Management for Federal23 MAR 2012
Report 7622Information Systems
NIST SP 800-53 Rev. 3Recommended Security Controls for Federal InformationAUG 2009

Systems and Organizations

PEO IWS INST 4730.1ACombat System Certification Policy
TE000-AB-GTP-020Government Stress Screening of Hardware01 JAN 1992
NoneSurface Electronic Warfare Improvement Program (SEWIP)04 OCT 2019
AN/SLQ-32(V)7 – Quadrant Configuration Trade Study Report
NoneDOD AT Guidelines, version 2.1,25 JUL 2014
NoneDON Anti-Tamper Desk Reference, Fifth edition01 JUL 2013
NoneDoD Modeling and Simulation Guidance for the AcquisitionOCT 2008

Workforce Version 1.0.1

NoneJoint Software Systems Safety Engineering Handbook27 AUG2010
NoneManufacturing Readiness Assessment (MRA) Desk book02 MAY 2009
NoneNaval System Engineering Guide01 OCT 2004
NoneDoD Earned Value Management Implementation GuideOCT 2006
NoneDoD Guide for Achieving Reliability, Availability and03 AUG 2005

Maintainability (RAM)

NoneDoD Militarily Critical Technologies List (MCTL)
NoneJoint Software Systems Safety Engineering Handbook27 AUG 2010
NoneNational Aerospace Standard (NAS) 411, Hazardous MaterialsJuly 1993

Management Program

NoneNAVEDTRA 130B, Task Based Curriculum Development ManualSEP 2009
NonePEO IWS 2.0 Above Water Sensors System Configuration

Management Plan

NonePEO IWS INSTRUCTION 5234.1, Software Management PolicyDEC 2011
NoneTechnology Readiness Assessment (TRA) GuidanceAPR 2011
NoneHandbook for Rubber Materials in Automotive AirNOV 1993

Conditioning Applications

2.3 USE OF STANDARDS

Document Precedence: In the event of a conflict between the documents listed in Sections 2.1 and 2.2, the Government will adjudicate precedence on a case-by-case basis.

3.0 GENERAL REQUIREMENTS

3.1 Program Management

The Contractor shall assign a qualified Program Manager (PM) who shall have complete responsibility for the planning, executing, controlling and reporting all aspects of the program, and for directing in-house and subcontractor efforts.

3.1.1 Integrated Master Schedule (IMS)

The Contractor shall generate and maintain an Integrated Master Schedule (IMS) as part of the IPMR CDRL A001. The IMS shall identify all tasks from option exercised to completion. The IMS shall use the Government approved CWBS structure for tracing all work to be performed. The IMS shall identify the critical path, all major program events, and program milestones. The IMS shall identify all discrete work and clearly align with work packages and planning packages within control accounts. The Contractor shall document its IMS at the lowest level of the CWBS. The Contractor shall quantify risk in hours, days, or weeks of delay and provide optimistic, pessimistic, and most likely durations for each IMS activity and event that meets the following criteria: (1) critical path tasks/activities, (2) near-critical path tasks/activities (as specified in the CDRL), (3) high risk tasks/activities in the program’s risk management plan.

3.1.2 Contract Performance Report (CPR)

The Contractor shall report financial data as…

This is the start of the file's text. The full file is on GovTribe.