USS_O'KANE_PPI_QA4.xlsm

XLSM spreadsheet 506 KB Posted

Attached to
USS O'Kane (DDG 77) FY19 Extended Selected Restricted Availability (ESRA)
Solicitation number
N00024-18-R-4406
Issued by

About this file

Bidder's QA4

View the file

Other files

File Type Posted
N00024-18-R-4406_conformed_through_0006.pdf PDF
N00024-18-R-4406_0006.pdf PDF
N00024-18-R-4406_0005.pdf PDF
N00024-18-R-4406_conformed_through_0005.pdf PDF
USS_O'KANE_PPI_QA5.xlsm XLSM spreadsheet
N00024-18-R-4406_conformed_through_0004.pdf PDF
N00024-18-R-4406_0004.pdf PDF
N00024-18-R-4406_conformed_through_0003.pdf PDF
N00024-18-R-4406_0003.pdf PDF
USS_O'KANE_PPI_QA3.xlsm XLSM spreadsheet
N0002418R4406_Conformed_though_0002.pdf PDF
USS_O'KANE_PPI_QA2.xlsm XLSM spreadsheet
USS_O'KANE_PPI_QA1.xlsm XLSM spreadsheet
N0002418R4406_0002.pdf PDF
N0002418R4406_Conformed_through_0001.pdf PDF
N0002418R4406_0001.pdf PDF
N00024-18-R-4406.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-3_PPI_O'Kane_DDG_77_N00024-18-R-4406.xlsm XLSM spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pre-Proposal Information (PPI) Question and Government Responses #4
DrawingNAVSEA POC
GFMSolicitation #:N00024-18-R-4406Name/Title/EmailPhone
RLARTPPCTPPC-DG77-SWRMC19-CN01Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil202-781-4064
Sheila Utz, Contracting Officer, sheila.utz1@navy.mil202-781-2486
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
Please contact Justin Lessel, justin.d.lessel@navy.mil, and Sheila Utz, sheila.utz1@navy.mil, to request references, drawings, RLARs, and Erratas being provided under this Solicitation Question & Answer Set.
Q #Work Item No.Document Number/TitleDocument TypeQuestionGovernment Response
35NADue Date for N00024-18-R-4406Due to the size and complexity of the work package, and in order to afford all contractors ample time to prepare an accurate proposal that will be most beneficial to the Government, it is requested that the bid date be extended 21 days to 3 September 2018 vice 13 August 2018.
It is also requested the due date for bidder's questions be extended 21 days to 13 August 2018 vice 23 July 2018.Due to the projected award date and start of availability date referenced in the solicitation, , the program cannot afford to issue an extension to the proposal submission due date of July 24, 2018.
49301-80-001DDG51 Class AER 64201, Stuffing Tube Replacement with Matrix; accomplish301-80-001, KTR notes that according to the specification of work and all the references, this work item is to accomplish the replacement of stuffing tubes. Tubes and locations are specified on the references. However, it is not stated if cables have been rolled back out of the tubes.

KTR requests clarification on the contents of the tubes. For example: cable, conduit, or fittings.

Unless otherwise stated this item will be estimated to remove and replace tubes only. All hours for cable rollback and conduit and fitting removal will be subject to a change order.

Please Review, advise or concur.

The Government's intent is to replace stuffing tubes IAW drawing 301-7360941 Rev A, sheets 2, 3, 8 and 13. NAVSEA Standard Item 009-73 (CAT 1) covers KTR to accomplish. Work Item is amended to clarify locations of stuffing tubes to be accomplished under ERRATA (4).
56Attachment J-3Attachment J-3Attachment J-3, provides the DDG 77…INTEGRATED TEST SCHEDULE and MAJOR MILESTONES.

Seven different lines address HM&E TURNOVER 1, 2, 3, 4, 5, 6 and 7 with the associated dates. However, the specifics of what equipment, systems or spaces pertain to the particular “TURNOVERS” are not defined.

Please clarify the definition or intent of these TURNOVER Milestones.

Amendment 0004 provides a revised Attachment J-3 DDG-77 FY19 ESRA Milestone for the specifics of what equipment, systems or spaces pertain to the particular “TURNOVERS”.
58992-31-002ShipAlt DDG51-76869K 1MC Upgrade, 76974K MWS for DDG Modernization Plan, 77259K Replace Legacy EM Log with AN/WSN-9(V)1 DHYSL and 90485K SIWCS Next Generation System, Alteration Installation Team (AIT) Support Service; provideWI 992-31-002 as written intends to defuel and refuel the ship while a contractor’s facility and possibly run through dark hours.

IAW para. 283, “Fueling and Defueling Procedures” of NAVBASESANDIEGOINST 5450.8Q Dated 27APR2012, defueling prior to major maintenance availability and refueling prior to completion of major maintenance availability should use the Defense Fuel Support Point Defense Point (DFSP) Point Loma utilizing only Navy Provided YON Barges. Para. 283 (d) (2) restricts all fuel transfers to weekdays, using normal work hours (0800-1600), Will the Government revise the specification to conform to NAVBASESANDIEGOINST 5450.8Q?

WI is revised via Errata 2 as follows:

Q1: It is the Government's intent to defuel and refuel the ship in the contractor’s facility if the contract is awarded outside of San Diego. This Option Item will not be placed on contract if the contract is awarded within San Diego. For defueling it is Ship's Force responsibility to remove all fuel to lowest suction to allow KTR to decomp tanks. For refueling it is Ship's Force responsibility.

62 150-11-039 Antenna 2-3 Platform Deck; repair and preserve 150-11-039, Para 3.5 tasks KTR to, “Remove existing and install new deck plating on antenna platform…”

Is the Government going to provide critical alignment and in-place machining services?

The Government will not be providing alignment and in-place machining services. This is KTR responsibility.
63150-11-011Antenna 2-2 Platform Deck; repair and preserve150-11-011 Para 3.5 tasks KTR to remove and install new deck plating on the antenna platform.

Is the Government going to provide critical alignment and in-place machining services?

The Government will not be providing alignment and in-place machining services. This is KTR responsibility.
64150-11-001Decoy Launcher Base No. 4; Repair150-11-001 Para 3.4 tasks KTR to accomplish the following repairs for foundation and deck identified in 1.3, using the results in report of 3.3.1.

Is the Government going to provide critical alignment and in-place machining services?

The Government will not be providing alignment and in-place machining services. This is KTR responsibility.
74310-80-001DDG51 AER 64208, SSGTG Emergency Cooling Power Source Modification; accomplishWork Item 310-80-001 Paragraph 5.3 identifies a GFM Material Kit for ship alt 64208D. That GFM material kit can be found using the 4720 in reference 2.6. The 4720 does not define the GFM material kit for SA 64208D. Please clarify the material being provided as GFM.Work item is amended to add list of GFM under 5.3. under ERRATA (4).
89Proposal Due Date Extension RequestUSS OKANE (DDG-77) FY19 ESRA RFP issued 6/25/2018 has a due date of 8/13/2018. This current due date only allows contractors roughly 42 planning days to prepare/provide a robust proposal. This timeline, along with not receiving answers to any of the submitted Pre-Proposal Inquiries, is having a negative effect on the responsiveness of the subcontractor/material vendor community who, along with the contractor, are strained by the bidding timeline.

In order to afford the contractor and all subcontractors/vendors ample time to respond to Q&A’s, prepare/submit accurate proposals, and allow adequate time for subcontractor/vendor solicitations/evaluations/selections, request that the proposal due date be extended from 13 August 2018 at 10:00 am, local time, San Diego, CA. to 27 August 2018 at 10:00 am, local time, San Diego, CA. A 14-day proposal due date extension.

Proposal due date was extended to July 24, 2018.
90980-90-001“ShipAlt DDG51-70403K Digital Fuel Control System, 71604K DDG Modernization Single CCS Watchstander, 71726K DDG Modernization Single Bridge Watchstander, 77427K DDGM, Digital Indicator, 77829K Install Radar and TDR Tank Level Indicator for DFM, JP-5 and Potable Water, 73088K GEDMS for DDG51-78 Modernization and 71615K Switchboard to support GEDMS DDG Modernization Alteration Installation Team (AIT) Support Service; provide”Paragraph 3.6.1 states, “Provide 1,000 square foot of Heavy Metal Abatement from (Start Availability A+0 through A+120) as directed by the Hull Manager or AIT OSIC.”

Paragraph 1.2 Location of Work lists, “117 locations.”

Due to the containment requirements for abatement of heavy metals and the cost associated with them, the contractor suggests using 50 locations (at 20 sqft per location) for bidding purposes. This will insure that all parties are given a fair and reasonable evaluation.

Bidder's Question: For bidding and estimating purposes, will the work scope of paragraph 3.6.1 be updated to include a defined number of locations and the sqft of abatement per location?

Paragraph 3.6.1 is a sub-paragraph of paragraph 3.6 which states, "Provide heavy metal sampling in 350 locations as designated by the Hull Manager or AIT OSIC from (Start Availability A+0 through A+90).

Samples taken shall be analyzed and results turned over to the Hull Manager or AIT OSIC within 3 weeks maximum." Paragraph 3.6.1 provides the total number of square feet of Heavy Metal Abatement from (Start Availability A+0 through A+120) as directed by the Hull Manager or AIT OSIC to be accomplished. The sqft of abatement per location will be directed by the Hull Manager or

AIT OSIC.

91 980-90-005 , “ShipAlt DDG51-76869K 1MC Upgrade, 76974K MWS for DDG Modernization Plan, 77259K Replace Legacy EM Log with AN/WSN-9(V)1 DHYSL and 90485K SIWCS Next Generation System, Alteration Installation Team (AIT) Support Service; provide” Paragraph 3.17 states, “Accomplish Paint Sampling/Heavy Metal Testing of 100 locations as designated by the SUPERVISOR Additionally to accomplish heavy metal paint abatement of 100 SF found during testing.”

Paragraph 1.2 Location of Work lists, “31 locations.”

Due to the containment requirements for abatement of heavy metals and the cost associated with them, the contractor suggests using 5 locations (at 20 sqft per location) for bidding purposes. This will insure that all parties are given a fair and reasonable evaluation.

Bidder's Question: For bidding and estimating purposes, will the work scope of paragraph 3.17 be updated to include a defined number of locations and the sqft of abatement per location?

The intent is for 100 locations to be tested, with up to 100 sqft of abatement to be performed as a result of the testing. If more than 100 sq ft contractor will be issued change order.
92521-11-001“Firemain Piping; replace”Paragraph 3.2 states, “Remove existing fit and install new the entire length of firemain piping listed in 1.3 and located in 1.2 between the outlet side of FM-V-458 and inlet side of FM-V-460, using 2.2 and 2.3 for guidance.”

Paragraph 1.3 states, “Firemain Piping, 5 Inch, 90-10 Cu-Ni, MIL-T-16420, Class 200” Paragraph 1.2 states, “Location of Work: 1.2.1 Auxiliary Machinery Room No. One (4-126-0-E)” Ref 2.2 identifies, “521-6218463 Rev P, Firemain System Diagram” this is a schematic drawing and only identifies rough equipment locations, piping runs lengths.

Contractor has reviewed the specification and is unable to determine the quantity/length of 5” pipe required and whether any fittings or flanges are required to accomplish the scope of work identified in paragraph 3.2. Additionally, reference 2.2 521-6218463 is a “diagram/schematic” with no dimensions. In this instance, a ship check of a similar ship to determine material requirements will not work, because of specific ship field run installation requirements.

Bidder's Question: Will the material required to accomplish the work scope directed by paragraph 3.2 be identified so that contractor can procure the correct type and quantities or can the material be provided as GFM?

Paragraph 3.2 is amended under ERRATA (3) to state: "Remove existing, fit and install new the entire length of firemain piping and fittings listed in 1.3.1 and located in 1.2 between the outlet side of FM-V-459 and inlet side of FM-V-460, using 2.2 and 2.3 as guidance. New material shall conform to 70-30 CUNI." It is not the Government's intent to change out valves.
93505-11-002“Flexible Hose Assembly; replace (OPTION ITEM)”Paragraph 3.1 states, “Provide 880 mandays of labor and 250,000 dollars of material and shipping expense to accomplish transportation service from Ship to shop and back for flexible hose assemblies, as directed by the SUPERVISOR. If the total costs are less than the authorized manday and dollar amounts, remaining funds will be subject to recoupment. The contractor is not authorized to exceed these limits.”

Sub-paragraphs 3.1.1 thru 3.1.6 than follow. Based upon the paragraph hierarchy identified in NAVSEAs FY19 Appendix 4E Package for Work Item Development, the contractor has assumed that the directed labor and material identified in paragraph 3.1 is to only be utilized to cover the costs of sub-paragraphs 3.1.1 thru 3.1.6.

And because paragraphs 3.2 through 3.6 are not sub-paragraphs of 3.1, they must be priced separately from the directed labor and material identified in paragraph 3.1.

Bidder's Questions:

1) Is it the customer’s intent that the directed labor and material identified in paragraph 3.1 is to only be utilized to accomplish paragraphs 3.1 thru 3.1.6?

2) Or, is it the customer’s intent that the directed labor and material identified in paragraph 3.1 is to be utilized to accomplish the entire specifications scope of work as defined by paragraphs 3.1 thru 3.6?

Work item is amended under ERRATA 4 for the KTR to accomplish removals, drain and dispose services, gas free services, rigging, shipment (to and from repair facility) installation and test.
28167-11-006Main Mast Door Repair and preserve; accomplishItem 167-11-006, Paragraph 3.4 states “Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 36, Columns A, B and F.”

The only know source is located in Canada. Due to ITAR regulations Contractor cannot send the specification and or drawings required because its “Export Controlled Data” Contractor is requesting the following:

Government Amend the specification to include Automatic Coating Limited in paragraph 3.ACL is a known source for powder coating using (fluidized bed method). KTR shall accomplish the requirements of NAVSEA Standard Item 009-32 as stated in paragraph 3.4. It is the KTRs responsibility to follow the ITAR regulations.
94123-19-001; 259-10-001 (E1); 259-10-002 (E1)123-19-001 para 3.1 covers surface prep. No para covering paint application. 259-10-001(E1) para 3.6 surface prep. No para covering paint application. 259-10-002(E1) para 3.6 surface prep. Para 3.6.1 covers paint for decks no para for paint application for bulkheads.
Please advise.Preservation for VCHT tanks # 1 and # 2 are covered under work item 123-19-003 Vacuum Collection Holding Tank (VCHT); preserve. Work Items 259-10-001 and 002 are amended under ERRATA (4) to add the requirements for preservation.
95472-90-001Title: ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Hardware and ShipAlt DDG51-81382K, AN/SLQ-32 (V)6 Data Adaptation Processor (DAP) HW; AccomplishPara 3.2.5 State" procure and install the material listed in 2.16, Please provide ref 2.16 DDG 77 SA 80156K, CFM MATERIAL LISTRef. 2.16 "DDG77 SA 80156K, CFM MATERIAL LIST" has been provided to KTRs upon request.
96324-80-001Title: DDG51 Class AER 76101, Replace Dossert Lug Connectors;
accomplishPlease provide Reference 2.8 (320-6567491 Rev J, Power System Feeders Isometric Cabling Diagram) added in Errata 2Ref. 2.8 320-6567491 rev J. has been provided to KTRs upon request.
97472-90-001“ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Hardware and ShipAlt DDG51-81382K, AN/SLQ-32 (V)6 Data Adaptation Processor (DAP) HW; accomplish”Paragraph 2.16 identifies, “DDG77 SA 80156K, CFM MATERIAL LIST (E2)”

Paragraph 3.2 states, “Accomplish the requirements of 2.2 through 2.13 and 2.16 (E2)” Paragraphs 3.2.5 states, “Procure and install the material listed in 2.16. (E2)” Contractor has reviewed all Errata 02 documentation received and has determined that reference 2.16 of work item 472-90-001 is missing.

Bidder's Question: Contractor requests missing reference 2.16 “DDG77 SA 80156K, CFM MATERIAL LIST” of work item 472-90-001 be provided as soon as possible to allow pricing to be captured in the proposal.

Ref. 2.16 "DDG77 SA 80156K, CFM MATERIAL LIST" has been provided to KTRs upon request.
98“ShipAlt DDG51-80156K, AN/SLQ-32 (V)6 Hardware and ShipAlt DDG51-81382K, AN/SLQ-32 (V)6 Data Adaptation Processor (DAP) HW; accomplish”Paragraph 2.5 identifies, “474-8750599 Rev A, ShipAlt DDG-51-80156 AN/SLQ-32 (V)6 / SEWIP Blk 2 Upgrade Elec Dwg & ML”

Paragraph 2.16 identifies, “DDG77 SA 80156K, CFM MATERIAL LIST (E2)” Paragraph 3.2.5 states, “Procure and install the material listed in 2.16. (E2)” Contractor has reviewed reference 2.16 and notes that the items listed under Drawing Number 8750599 with Item Numbers 101 thru 108, 110 thru 112, and 114 have insufficient identifiable information to allow the contractor to price and procure the equipment as directed by paragraph 3.2.5. Additionally, it’s noted that the equipment in question and identified below is still annotated in reference 2.5 as being provided by Hardware Systems Command (HSC) as Government Furnished Material (GFM).

The contractor does not need to procure Item Numbers 101 thru 108, 110 thru 112, 114, 146, and A001 (Sub-Items - TL, M0114, M0115, M0116, M0117, and M0118). These items will be provided by the PARM.

Bidder's Question: For the equipment listed on reference 2.16 under Drawing Number 8750599 with Item Numbers 101 thru 108, 110 thru 112, and 114, will additional identifiable information be provided to allow the contractor to price and procure the equipment as directed by paragraph 3.2.5 or will the equipment in question be provided by Hardware Systems Command (HSC) as Government Furnished Material (GFM) in accordance with ref 2.5?
99438-90-003ShipAlt DDG51-73088K, GEDMS for DDG 51-78 Modernization; accomplishWI 438-90-003 Para 3.1.1 States, “Accomplish the requirements of 2.5 with the exception of the following:

3.1.1.1 Electrical cable ripout and installation, sheets 133, 135-162.

Q1: KTR also notes that no wire connection list or hook up sheets are provide in the specification and requests to clarify if cable assemblies will come completed with connectors already installed or of if connectors and hook up needs to be included in the estimate.

Q2: KTR is requesting clarification on who is to complete the install and ripout of electrical cable.

Q3: KTR is requesting clarification on who is to complete Banding, MCT re-packing and Air testing requirements. Q1: Contractor is not performing any of the wire connections or electrical hook-up for Paragraph 3.1.1.1, the AIT will be accomplishing the wire connections and electrical hook-ups.

Q2: The AIT will accomplish the install and ripout of electrical cable.

Q3: Each contractor will complete their own banding, MCT re-packing and air testing requirements IAW NSI 009-73.

100 N000-18-R-4406 Amendment 2 N000-18-R-4406 Amendment 2, Errata 1 & 2 Due to the size and complexity of the work package, and in order to afford all contractors ample time to prepare an accurate proposal that will be most beneficial to the Government, it is requested that the bid date be extended 21 days to 14 September 2018 vice 24 August 2018. It is also requested the due date for bidder's questions be extended 21 days to 22 August 2018 vice 1 August 2018.

Note that:

1. Errata 1 added 131 lines of IAF material into WI 643-11-001

2. Errata 1 added 131 lines of IAF material into WI 644-11-003

3. Errata 2 added 772 lines of IAF material into WI 472-90-002

4. KTR has raised over 50 Question but have so far been unanswered and Subcontractors are awaiting clarification before they can submit an accurate proposal beneficial to the Government.Proposal due date was extended to July 24, 2018.
101584-10-001Pallet Truck Stowage/Battery Door; inspect and repairWI 584-10-001 para 3.3, Part listed - Alternating Motor – Piece No. 24, P/N P-170-909-000N is unable to cross into an NSN.

Q1: Please provide correct NSN, or provide item as GFM Q2: Alternate option is to replace entire unit. If so, please provide correct part number and NSN for entire unit or provide as GFM.

Q1: NIN/NSN: 01-287-5135 and shall be provided as CFM. Q2: Ktr is to accomplish the requirements of paragraph 3.3 in its entirety.
102150-11-02904 Level Deck; repairWI 150-11-029, KTR is notes that the following paras may be incorrect:

Para 3.6 is Sp-11 column A? It should be Table 2 Line 21 Column A(Sp-12) ,B,C,E Type I nonskid Para 3.7: incorrect; should be a proprietary nonskid system (note7) follow 3.6 Para 3.8: incorrect; follow 3.6 for coating system column Table 2 Line 21 Columns B & E Para 3.9: 03-282-0-Q – Table 3 Line 6 Column A(Sp-11) B & D Correct High Durability Coating mil-prf-32171 Para 3.10: Table 3 Line 1 Column A (Sp-2), B, F & G (Lagging?)

Para 3.4,3.5,3.5.1:Table 2 Line 18 Column A (Sp-11) Blast Pads recommend Table 2 Line 21 Columns B,C,E for nonskid system Type I-3.5, 3.5.1 if flex fram is authorized any more for use?

No change required. Ktr should be utilizing NAVSEA Standard Item FY-19 CH-2
103634-21-002Flight Deck Non-skid; replacePara 3.8: Table 2 Line 9 Column B-Incorrect should be Table 2 Line 15 Column B Nonskid Primer (Sacrificial)

Para 3.10 & 3.10.1: Table 2 Line 9 Column A,B,C,E is incorrect; should be Table 2 Line 15 Column B & E Nonskid Primer & Top Coat.

No change required. Ktr should be utilizing NAVSEA Standard Item FY-19 CH-2
72426-80-001ShipAlt DDG51-76853D, Magnetic Compass System Tech Refresh; accomplishPlease provide 2nd tier drawing: 113-8436179 (This is 2nd Tier to Ref 2.2 426-8436258 REV A)Drawing 113-8436179 is not a required drawing for this install and is not applicable to DDG-77.
104551-80-001 (A1)“ShipAlt DDG51-73738, Installation of Additional Bulkhead Cutout Valves; accomplish”Contractor notes that this work item is new and was added to the specification package on 08/07/18 by Addendum 01 which was invoked by Amendment 0003.

Paragraph 2.2 identifies, “551-8773460 Rev A, ShipAlt DDG-51-73738 Installation of Additional Bulkhead Cutout Valves & ML” Paragraph 3.1 states, “Accomplish the requirements of 2.2 through 2.6.”

Contractor has reviewed all documentation provided with issuance of Amendment 0003 and notes that reference 2.2 identified above was not provided.

Bidder's Question: Contractor requests that the customer provide reference 2.2 “551-8773460 Rev A, ShipAlt DDG-51-73738 Installation of Additional Bulkhead Cutout Valves & ML” of new work item 551-80-001, so that the contractor can provide accurate pricing.

Drawing 551-8773460 has been provided to KTRs upon request.
105441-11-002 (E3)“Antenna Platform; replace”Contractor notes that this work item was revised on 08/07/18 by Errata 03 which was invoked by Amendment 0003 which added reference 2.9.

Paragraph 2.9 identifies, “180-7622314 Rev B, AN/WSC-6(V)9 FWD AS-3018A/WSC-1(V) STRL FDN MODS & ML” Contractor has reviewed all documentation provided with issuance of Amendment 0003 and notes that reference 2.9 identified above was not provided.

Bidder's Question: Contractor requests that the customer provide reference 2.9 “180-7622314 Rev B, AN/WSC-6(V)9 FWD AS-3018A/WSC-1(V) STRL FDN MODS & ML” of revised work item 441-11-002, so that the contractor can provide accurate pricing.

Drawing 180-7622314 has been provided to KTRs upon request.

&P of &N