Amendment 0003

View the file

Other files

File Type Posted
N00024-18-R-4406_conformed_through_0006.pdf PDF
N00024-18-R-4406_0006.pdf PDF
N00024-18-R-4406_0005.pdf PDF
N00024-18-R-4406_conformed_through_0005.pdf PDF
USS_O'KANE_PPI_QA5.xlsm XLSM spreadsheet
N00024-18-R-4406_conformed_through_0004.pdf PDF
N00024-18-R-4406_0004.pdf PDF
USS_O'KANE_PPI_QA4.xlsm XLSM spreadsheet
N00024-18-R-4406_conformed_through_0003.pdf PDF
USS_O'KANE_PPI_QA3.xlsm XLSM spreadsheet
N0002418R4406_Conformed_though_0002.pdf PDF
USS_O'KANE_PPI_QA2.xlsm XLSM spreadsheet
USS_O'KANE_PPI_QA1.xlsm XLSM spreadsheet
N0002418R4406_0002.pdf PDF
N0002418R4406_Conformed_through_0001.pdf PDF
N0002418R4406_0001.pdf PDF
N00024-18-R-4406.pdf PDF
S-4_PP_Reference_List.docx DOCX document
S-2_Past_Performance_Questionnaire.docx DOCX document
S-3_PPI_O'Kane_DDG_77_N00024-18-R-4406.xlsm XLSM spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0002418FR93077

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See attached for details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0002418R4406

X 9B. DATED (SEE ITEM 11)

15-Jun-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2018

CODE

NAVAL SEA SYSTEMS COMMAND (HQ)

1333 ISAAC HULL AVE SE

WASHINGTON NAVY YARD DC 20376-2040

N00024 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0002418R4406

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS/EXHIBITS/ATTACHMENTS

The following document(s), exhibit(s), and other attachment(s) form a part of this solicitation:

No. Document

Attachment S-1 Reserved Attachment S-2 Past Performance Questionaire Attachment S-3 Pre-Proposal Information (PPI) Form Attachment S-4 Past Performance References Attachment S-5 Eligibility Criteria Data Sheet

The following document(s), exhibit(s), and other attachment(s) also form a part of this solicitation and will form a part of the contract resulting from this solicitation:

No. Document Attachment J-1 Specification Package No. TPPC-DDG77-SWRMC19-CN01, Errata 1 via

Amendment 0001, Errata 3, Errata 4, Errata 5, and Addendum 1 via Amendment 0003

Attachment J-2 Work Item Plans, Drawings, and Other References Attachment J-3 Execution Milestones and Key Event Dates

Attachment J-4 Pricing Workbook, Amendment 0003 Attachment J-5 Quality Assurance Surveillance Plan Amendment 0003 Attachment J-6 Subcontracting Plan (to be incorporated upon award) Attachment J-7 Schedule Model Review

Exhibit A Contract Data Requirements List (CDRL) (DD Form 1423) A001-A003; A005-A009; A011; A012; A014 (Does not include A004, A0010, or A0013) Exhibit B Contract Data Requirements List (CDRL) (DD Form 1423) B001-B009 Exhibit C Contract Data Requirements List (CDRL) (DD Form 1423) C001-C002

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

Section L - Instructions, Conditions and Notices to Bidders

INSTRUCTIONS TO OFFERORS

1.0 INTRODUCTION

This solicitation is a Request for Proposals (RFP) that will result in the award of a single Fixed-Price contract for the FY19 Extended Selected Restricted Availability (ESRA) for USS O’KANE (DDG 77). The Government anticipates awarding a single contract through a best value source selection process. The Government expects the best value to result from selection of the technically acceptable proposal with the lowest evaluated price and will thus use the Lowest Price Technically Acceptable (LPTA) source selection procedures in accordance with FAR 15.101-2

ALL INQUIRIES shall be made in writing and directed to Sheila Utz, Contracting Officer, and Justin Lessel, Contract Specialist, at sheila.utz1@navy.mil and justin.d.lessel@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for information (RFIs) via amendment, it is requested questions be submitted no later than 1 August 2018 at 3:00 pm, local time, Washington DC. The Navy reserves the right to not answer any requests received after this date and time. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of requests received after this date and time. RFIs should reference a solicitation and/or specification page and paragraph number and be submitted on the Pre-Proposal Information (PPI) form (Attachment S-3) provided with this solicitation.

Estimated Award Date: The Government anticipates making a single award on or around 15 November 2018.

Offerors must provide a period of 120 calendar days from the proposal due date for Government acceptance of the offer (Complete block 12 of the Standard Form (SF) 33).

2.0 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

Proposal Due Date: All copies of proposals (Volumes I & II) shall be received by the Government at the address below no later than 24 August 2018 at 10:00 am, local time, San Diego, CA. Electronic submittal of proposals will not be accepted. Late proposals WILL NOT be considered. Partial proposals or attachments submitted late WILL NOT be considered. Offerors are advised to consult FAR 15.208 related to timely receipt of proposals.

Proposal Submission:

Proposals shall be sent to:

NAVAL SEA SYSTEMS COMMAND

Southwest Regional Maintenance Center Attn: Yvonne Escoto or Patrick Augustin, Code 450 3755 Brinser Street, Suite 1 San Diego, CA 92136

Offerors shall mark all submittals “DO NOT OPEN PACKAGE IN MAIL ROOM—FORWARD UNOPENED DIRECTLY TO C-450”. The outside of the package shall clearly indicate the Offeror’s name, the solicitation number and the contents of the package.

Offerors shall submit:

Volume Title Number of Paper Originals (See Note 1)

Number of Paper Copies

Number of CDs (See Notes 2 &3)

I Price Proposal 1 0 2 II Technical Proposal 1 2 4

Note 1: Originals may be shipped in the same boxes as the copies to eliminate excess shipping costs. However, originals should be clearly labeled “ORIGINAL TECHNICAL PROPOSAL” or “ORIGINAL PRICE PROPOSAL.”

The exterior of each box MUST clearly indicate its contents.

Note 2: The CDs must be scanned to ensure that the files contained on them do not contain any computer viruses.

The CDs shall be labeled to indicate the Offeror’s name, the solicitation number and the associated volume numbers.

Note 3: The files on the CD shall be in a format that is compatible with and capable of being opened in Microsoft Office Suite 2007 or Adobe Acrobat. The material presented in electronic format shall be identical to the paper copy of the proposal. In cases where the hard copy and the electronic copy of the proposal conflict, the electronic copy shall take precedence. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected. If files are compressed, the necessary decompression program must be included.

3.0 GENERAL INFORMATION

Ship Checks: Offerors, including significant subcontractors, may inspect the USS O’KANE (DDG 77) from 11 June

– 20 July at Naval Base Pearl Harbor, Pearl Harbor, HI. Alternatively, similar ships of the class, USS DECATUR (DDG 73), is available 9 - 21 June, 1 – 31 July, and 1 - 15 August at Naval Bae San Diego, San Diego, CA and USS HIGGINS (DDG 76), is available 25 June - 19 July also in San Diego. Please note: These dates are subject to last minute change. To schedule a ship check, offerors shall email a "Request for Ship Check" to Sheila Utz and Justin Lessel at sheila.utz1@navy.mil and justin.d.lessel@navy.mil, respectively. Participants will be subject to security, safety, and other applicable regulations established by Ship Repair Facility- San Diego and ship Commanding Officers. Contractors conducting SWRMC related work efforts must visit SWRMC security website for latest forms and instructions at:

http://www.navsea.navy.mil/Home/RMC/SWRMC/Visiting-SWRMC/ and https://www.cnic.navy.mil/regions/cnrsw/installations/navbase_san_diego/om/force_protection/pass_and_decal.html

Specifications and associated reference documentation: The Government will provide, upon request, CD/DVDs including Attachment J-1 Work Items and Work Item References not already in the possession of the offerors, commercially available, listed under 52.211-2, or available through the following websites:

https://jedmics.net/ https://webjed.nnsy.navy.mil/ https://psjed.psns.navy.mil/

Offerors (Prime Contractors) shall contact the Procuring Contracting Officer, Sheila Utz at sheila.utz1@navy.mil and the Contract Specialist Justin Lessel at Justin.d.lessel@navy.mil to request a copy of the work package specification CD/DVD and the established dates, included as Attachment J-3. These documents will not be distributed publicly on FBO.

Those companies who wish to receive the Government Furnished Information (GFI) material relevant to N00024- 18-R-4406 are to submit a signed statement on company letterhead that states your company is a United States Department of Defense Contractor to Angelica Weddington at anjelica.weddington@navy.mil. This statement will be verified in System for Award Management located at (https://www.sam.gov/portal/SAM/).

Alteration of Solicitation: Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

Proposal Information: Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, offerors are advised that statements such as: “the offeror understands”, “the offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors are encouraged to provide specific and concise information to validate all assertions.

Amendments: The Government may revise the solicitation at any time by means of an Amendment. It is an offeror’s responsibility to ensure it is accessing the Federal Business Opportunities (FBO) website to view potential amendments and procurement notifications for this solicitation.

Teaming Arrangements: Proposals must be submitted by one (1) prime contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work.

4.0 PROPOSAL FORMAT

To facilitate efficiency and consistency in proposal evaluation the following is mandatory. Proposals which do not follow this direction may be rejected as non-responsive and thus ineligible for award.

Hard Copy Proposals: All pages shall be double-sided on 8.5 x 11-inch paper with a one-inch margin. The text used shall be Times New Roman with a minimum font size of 12-point. Each side of the page will count as one “page”. Any type contained on graphics pages will not be smaller than 10-point font. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and date of the proposal revision submission. Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section 5.0 where required.

Page Limits:

• The cover letter is limited to three (3) pages.

• There are no other page limitations.

5.0 PROPOSAL CONTENT

VOLUME I

a. Price Proposal: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:

b. Cover Letter,

c. Signed SF 33 with all amendments acknowledged,

d. Small Business Subcontracting plan per FAR Part 19 (large businesses only),

e. Any Joint Venture / teaming agreements (if applicable),

f. Completed Section B carrying forward information from Attachment J-4, and

g. Pricing Workbook Spreadsheet containing Work Item Pricing, Level of Effort to Completion CLINs, Extension Day Rates, and Labor & Material Burden New Work Rates (Attachment J-4)

Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

• Identification of all enclosures included with the proposal,

• CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor,

• Notice of any alterations to the solicitation, such as “fill-in” blocks and certifications.

• Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

• Name, address, and telephone number of each proposed first-tier subcontractor with a proposed subcontract estimated at $10 million or more.

• For any WI with a total dollar value of zero dollars proposed in Attachment J-4, provide an explanation as to why. In addition to, if applicable:

- For any WI with a total value of zero labor hours proposed (prime and subcontractor combined) (although material is proposed), provide an explanation as to why.

- For any WI with a total dollar value of zero material proposed (prime and subcontractor combined) (although labor is proposed), provide an explanation as to why.

Standard Form 33 (SF 33): As part of the price proposal package, the offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation.

Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation in a FFP contracting environment.

Subcontracting Plan: A subcontracting plan is NOT REQUIRED from a small business concern.

• Provide rationale for any proposed goals that are lower than the statutory requirements identified at https://www.sba.gov/contracting/contracting-officials/goaling.

• Address FAR 52.219-9 and all of the subparagraphs in FAR 52.219-9(d): subparagraphs(12),(13),(14), and (15).

Completed Section B and Attachment J-4: Offerors must propose on all contract line items (CLINs), complete the Note entitled “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)” in Section B, complete Note entitled “SCHEDULE OF PRICES / RATES: DAILY RATES FOR PIER SIDE AND/ OR DRY-DOCKING (FULLY BURDENED)” complete the Pricing Workbook Spreadsheet containing Work Item Pricing, Growth Reservation CLINs, Extension day Rates, and Labor & Material Burden New Work Rates (Attachment J-4) to be considered responsive.

The contractor must submit prices for the Pricing Workbook Spreadsheet containing Work Item Pricing, Growth Reservation CLINs, Extension day Rates, and Labor & Material Burden New Work Rates (Attachment J-4) in Microsoft Excel in the format provided in this solicitation. The breakdown of CLIN prices, corresponding to the work item pricing, must add up to the total of each CLIN. If there is a discrepancy between the two, the CLIN price shall govern. The Labor & Material Burden Rates must match the rates provided in the Section B note entitled “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)”. The Daily Burden Rates must match the rates provided in the Section B Note entitled “SCHEDULE OF PRICES / RATES: DAILY RATES FOR PIER SIDE AND / OR DRY-DOCKING (FULLY BURDENED)”. If there is a discrepancy between the two, the Section B clause rates shall govern.

For Attachment J-4, offerors are to insert pricing in all yellow shaded fields.

An Inter-port Differential shall be proposed for all offerors. Include the value for the inter-port differential as follows:

Location* Differential Portland, OR $5,324,696 Seattle, WA $6,131,188

*Offeror’s whose location is not listed in the above inter-port differential table shall submit a bidder’s question requesting an inter-port differential be calculated for the location of the offeror’s proposed place of performance for the USS O’KANE (DDG 77) FY19 ESRA.

VOLUME II

Non-Price Proposal: The non-price proposal shall be comprised of four factors, Factor 1 – Eligibility Factor, Factor 2 - Past Performance, and Factor 3 – Resource Capacity as follows:

Factor 1 – Eligibility Factor: Offerors must provide the following to demonstrate eligibility:

• Eligibility Criteria Data Sheet (Attachment S-5) with the top portion filled out.

• A letter signed by the Principal identifying and confirming ownership or committed access (in the form of a letter signed by the subcontractor identifying and confirming committed access) to a pier capable of berthing the DDG 77 during the timeframe necessary to support the completion of this FY19 ESRA.

• Evidence the offeror holds a Master Ship Repair Agreement or proof of MSRA Equivalency to demonstrate capability.

MSRA Equivalency (Applicable to Non-MSRA holders only): Offerors that do not hold an MSRA must submit MSRA equivalency documentation to demonstrate sufficient organization and facilities capabilities. (Specific documentation requirements provided upon inspection request).

To be eligible for award, a prospective contractor must possess a MSRA as described in DFARS 217.71 Master Agreement for Repair and Alteration of Vessels (MARAV) or demonstrate organization and facilities equivalent to that reflected in a MSRA. Offerors meeting this eligibility requirement with documents and evidence outside of a MSRA must contact the PCO to schedule an on-site inspection. All requests for MSRA equivalency inspections must be received by 1300, local time, Washington DC on 25 June 2018. Requests shall be sent to Sheila Utz and Justin Lessel at sheila.utz1@navy.mil and justin.d.lessel@navy.mil. Failure to request an inspection by the designated time may result in a negative determination of offeror eligibility. All inspections will be completed by a representative from Commander, Navy Regional Maintenance Center (CNRMC). All offerors requesting equivalency inspections will receive a copy of the final inspection report prior to the date of contract award. The on-site inspection will supplement documentation provided with the offeror’s proposal.

The Government reserves the right to conduct a pre-award survey or to require other evidence of technical, production, managerial, financial, and similar abilities to perform prior to the award of any proposed contracts;

regardless of whether the offeror has an existing MSRA. There is no page limit associated with this documentation.

Factor 2 – Past Performance: The Government requires relevant performance information on all Offerors based on the past and present efforts provided by the Offeror and data independently obtained from other government and commercial sources. The Government will evaluate the Offeror’s past performance as a prime contractor. In the investigation of an Offeror’s past performance, the Government reserves the right to contact former customers and Government agencies and other private and public sources of information.

Offerors with recent and relevant past performance shall submit information concerning contracts which offerors consider relevant in demonstrating their ability to perform the proposed effort. Offerors shall identify portions of the contracts that are relevant. Offerors are requested to provide information up to five (5) previous contracts where the effort is recent and relevant to the effort required by this solicitation.

• “Recent” is defined as a contract in-progress or completed within the last three (3) years as of the date of the initial solicitation. If the offeror has not completed up to five (5) contracts within the last three (3) years as of the date of the initial solicitation, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

• “Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.

- Scope: Experience in the areas defined in the Solicitation Section C Statement of Work.

- Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offeror’s submitted contracts to the requirements of this solicitation.

- Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation. For complexity, not only will the tasks performed by the offeror be considered, but also the offeror’s ability to coordinate tasks (e.g., concurrent performance requirements).

Offerors shall provide a detailed explanation demonstrating the similarity of the contracts to the requirements of this solicitation; a detailed description of the work performed for the contract. Offerors are responsible for the accuracy of all data provided.

An offeror that does not have recent and relevant past performance to provide for consideration is requested to affirmatively state that it does not have recent and relevant past performance for the Government to consider.

The Offeror’s proposal shall identify the customer point of contact and which of the listed contacts that each questionnaire was sent to be completed. This will let the Contracting Officer know whether all questionnaires from all of the Offeror’s references were received.

Regarding Past performance information that is documented as a Contractor Performance Assessment Report (CPAR) and available in the Past Performance Information Retrieval System (PPIRS), the offeror may list it in Past Performance References, Attachment S-4. Attachment S-4 shall be used to identify the source of Past Performance information (e.g., CPARs, PPQs). For Past Performance information that does not have a current CPAR associated with it, the offeror may submit a Past Performance Questionnaire (PPQ), Attachment S-2 to its customer to complete. Each proposal shall include no more than a total of five (5) PPQs, one per contract identified. The offeror will complete Part A of the Questionnaire. Separately, the offeror shall provide the entire Past Performance Questionnaire, with Part A completed, to each customer for them to complete Parts B and C. Customer evaluation will not be included as part of the page count in this volume submitted by the offeror. The offeror shall instruct their customers to complete the Past Performance Questionnaires and return them before the closing date of this solicitation.

E-mail to:

Sheila Utz, Contracting Officer, sheila.utz1@navy.mil and

Justin Lessel, Contract Specialist, justin.d.lessel@navy.mil

Any questionnaire received after the proposal due date/time may be considered as late and may not be considered in the Offeror’s past performance evaluation. The Government, at its discretion, will determine whether or not questionnaires received after the proposal due date will be considered.

In addition, the offeror shall provide for all Past Performance References included in Attachment S-4, a short description of the work performed and why the offeror considers it relevant to the requirements of this solicitation.

Government may validate past performance information with the source regardless of whether it is provided under a CPAR reference or a PPQ.

All offerors (including small business offerors) are requested to address historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns) in a separate narrative. In addition, large businesses are requested to address historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan (DOD CONTRACTS)) in a separate narrative. Attachments to these narratives, including any eSRS information, is not included in the page limits.

Factor 3 – Resource Capacity: Offerors shall provide Integrated Production Schedule (IPS) documentation for the USS O’KANE (DDG 77) FY19 ESRA inclusive of the “Initial IPS” elements of NAVSEA Standard Item 009-60 as well as the Manpower Curves (Total) and the Manpower Curves (Trades) associated with the 009-60 “Schedule of Record”. Offerors shall provide the documentation in accordance with format requirements of FY19 (CH-2) NAVSEA Standard Item 009-60. The offeror shall provide the reports in the electronic formats required by FY19

(CH-2) 009-60 and in paper (hard copy) format. The hard copy of the Gantt charts shall be provided on 11 x 17-inch paper. There is no page limit associated with this documentation. Offerors shall integrate all work included in the Work Package. However, for the purposes of proposal submission only, reports do not require incorporation of Alteration Installation Team (AIT) schedules, Government-Contracted Third Party Maintenance Provider schedules, Ship's Force schedules, Commercial Industrial Services (CIS) schedules, Fleet Maintenance Activity (FMA) schedules and Navy Intermediate-Level schedules.

Manpower Curves (Total) and Manpower Curves (Trade) – In addition to the requirements of 009-60, the offerors shall provide Total and Trade Manpower Curves including the following information:

• The total and trade manpower resources currently employed by the offeror and expected to be employed by the offeror during the Availability period of performance.

• The total and trade manpower resources required to complete work the Offeror currently has under contract during the Availability period of performance.

• The total and trade manpower resources required to complete work the Offeror may complete, including the resources to complete ALL outstanding proposals and the resources required to complete any other expected requirements during the Availability period of performance.

Offerors shall provide a narrative affirming that the offeror has the manpower resources, by craft/trade/supervisor/support, available to complete the requirements of the availability, accounting for manpower resource required to complete work the Offeror currently has under contract and manpower resources required to complete outstanding proposals and any other expected requirements during the Availability period. Should the offeror propose to utilize subcontracted resources, the offeror shall include in their narrative an explanation of the requirements that will be completed by the prime and the work that will be subcontracted, including the work item, trade and period of performance for each subcontract requirement.

Pier / Dock Physical Resource Capacity- In addition to the requirements above for Manpower Curves, the offerors shall provide a narrative and charts to demonstrate the Physical Capacity available to support the proposed requirement:

• The total physical resources currently in working capacity and expected to be in working capacity during the Availability period of performance

• The total physical resources committed to complete previously awarded requirements as well as the additional resources committed to complete the work of ALL outstanding proposals expected during the Availability period of performance. Should the offeror propose to utilize subcontracted resources, the offer shall include in their narrative an explanation of the requirements that will be sourced by the prime’s facility and the physical resources that will be provided by the subcontractor.

• A chart showing the offeror's berthing plan for DDG 77 during the DDG 77's period of performance.

Berthing plan should outline all piers and/or drydocks being utilized for work the offeror currently has under contract, as well as piers/drydocks identified for all outstanding proposals, inclusive of DDG 77.

There is no page limit associated with this documentation.

(End of Summary of Changes)