Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
Common Hull Auxiliary Multi-Mission Platform (CHAMP)
Solicitation number
N00024-18-R-2236
Issued by

About this file

Attachment J-9

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

Section J Cost Exhibits L001 – L003
Table of Contents
TAB NAMEEXHIBIT TITLE
Exhibit L001Section J - Exhibit L002: Cost Element Breakdown
Exhibit L002Section J - Exhibit L003: Historical/Proposed Rates Summary Schedule
Exhibit L003Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006
Refer to Section L of the solicitation for instructions for completing these exhibits.

Table of Contents N00024-15-R-4420

Attachment S-3

Exhibit L001 (CLIN 0001)

Section J - Exhibit L001: CLIN 0001 Cost Element Breakdown

CLIN 00XX
ELEMENT OF COSTCY 20XX
Labor HoursRateDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.00
Direct Labor Rate 2 (as applicable)0$0.00$0.00
Direct Labor Rate 3 (as applicable)0$0.00$0.00
Total Direct Labor0$0.00
INDIRECT COSTS
Fringe%$0.00
Labor Overhead 1%$0.00
Labor Overhead 2 (as applicable)%$0.00
Labor Overhead 3 (as applicable)%$0.00
Total Indirect$0.00
MATERIAL
Direct Material$0.00
Direct Material Escalation (as applicable)%
Material Indirect Costs (as applicable)
Total Material$0.00
SUBCONTRACTS
Subcontractor 10$0.00$0.00
Subcontractor 20$0.00$0.00
Subcontractor 30$0.00$0.00
Subcontractor 40$0.00$0.00
Subcontractor 50$0.00$0.00
Subcontractor 60$0.00$0.00
Subcontractor 7
Total Subcontracts0$0.00
OTHER COSTS
Other Direct Costs$0.00
Total Other Costs$0.00

Subtotal Costs $0.00

G&A % $0.00

Total Fee Bearing Cost $0.00

FCCOM % $0.00

Total Estimated Cost $0.00

FIXED FEE
Non material Fee (Indicate percentage proposed)%$0.00
Material Fee Only (indicate percentage proposed)$0.00
$0.00
Total Price (Including Fee)$0.00

Total Labor Hours 0

GRAND TOTAL$0.00
NOTES:
The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs.
Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement
Could require multiple calandar years

Apply as many subcontractors as required.

Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236

Exhibit L001 (CLIN 0002)

Section J - Exhibit L001: CLIN 0002 Cost Element Breakdown

CLIN 00XX
ELEMENT OF COSTCY 20XX
Labor HoursRateDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.00
Direct Labor Rate 2 (as applicable)0$0.00$0.00
Direct Labor Rate 3 (as applicable)0$0.00$0.00
Total Direct Labor0$0.00
INDIRECT COSTS
Fringe%$0.00
Labor Overhead 1%$0.00
Labor Overhead 2 (as applicable)%$0.00
Labor Overhead 3 (as applicable)%$0.00
Total Indirect$0.00
MATERIAL
Direct Material$0.00
Direct Material Escalation (as applicable)%
Material Indirect Costs (as applicable)
Total Material$0.00
SUBCONTRACTS
Subcontractor 10$0.00$0.00
Subcontractor 20$0.00$0.00
Subcontractor 30$0.00$0.00
Subcontractor 40$0.00$0.00
Subcontractor 50$0.00$0.00
Subcontractor 60$0.00$0.00
Subcontractor 7
Total Subcontracts0$0.00
OTHER COSTS
Other Direct Costs$0.00
Total Other Costs$0.00

Subtotal Costs $0.00

G&A % $0.00

Total Fee Bearing Cost $0.00

FCCOM % $0.00

Total Estimated Cost $0.00

FIXED FEE
Non material Fee (Indicate percentage proposed)%$0.00
Material Fee Only (indicate percentage proposed)$0.00
$0.00
Total Price (Including Fee)$0.00

Total Labor Hours 0

GRAND TOTAL$0.00
NOTES:
The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs.
Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement
Could require multiple calandar years

Apply as many subcontractors as required.

Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236

Exhibit L001 (CLIN 0003)

Section J - Exhibit L001: CLIN 0003 Cost Element Breakdown

CLIN 00XX
ELEMENT OF COSTCY 20XX
Labor HoursRateDollars
DIRECT LABOR
Direct Labor Rate 10$0.00$0.00
Direct Labor Rate 2 (as applicable)0$0.00$0.00
Direct Labor Rate 3 (as applicable)0$0.00$0.00
Total Direct Labor0$0.00
INDIRECT COSTS
Fringe%$0.00
Labor Overhead 1%$0.00
Labor Overhead 2 (as applicable)%$0.00
Labor Overhead 3 (as applicable)%$0.00
Total Indirect$0.00
MATERIAL
Direct Material$0.00
Direct Material Escalation (as applicable)%
Material Indirect Costs (as applicable)
Total Material$0.00
SUBCONTRACTS
Subcontractor 10$0.00$0.00
Subcontractor 20$0.00$0.00
Subcontractor 30$0.00$0.00
Subcontractor 40$0.00$0.00
Subcontractor 50$0.00$0.00
Subcontractor 60$0.00$0.00
Subcontractor 7
Total Subcontracts0$0.00
OTHER COSTS
Other Direct Costs$0.00
Total Other Costs$0.00

Subtotal Costs $0.00

G&A % $0.00

Total Fee Bearing Cost $0.00

FCCOM % $0.00

Total Estimated Cost $0.00

FIXED FEE
Non material Fee (Indicate percentage proposed)%$0.00
Material Fee Only (indicate percentage proposed)$0.00
$0.00
Total Price (Including Fee)$0.00

Total Labor Hours 0

GRAND TOTAL$0.00
NOTES:
The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs.
Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement
Could require multiple calandar years

Apply as many subcontractors as required.

Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236

Exhibit L002 Section J - Exhibit L002: Historical/Proposed Rates Summary Schedule

RATEHistorical RateProposed Rate
CY 2014CY 2015CY 2016CY 2017CY 2018CY 2019CY 2020CY 2021CY 2022CY 2021
Program Manager Direct Labor$0$0$0$0$0$0$0$0$0
Project Manager Direct Labor$0$0$0$0$0$0$0$0$0
Design Manager Direct Labor0%0%0%0%0%0%0%0%0%
Lead Naval Architect/Hull Manager Direct Labor0%0%0%0%0%0%0%0%0%
Naval Architect Direct Labor0%0%0%0%0%0%0%0%0%
Chief Engineer/Mechanical and Electrical Engineer Direct Labor0%0%0%0%0%0%0%0%0%
Principal Engineer Direct Labor0%0%0%0%0%0%0%0%0%
Senior Engineer Direct Labor0%0%0%0%0%0%0%0%0%
Engineer (II/III) Direct Labor0%0%0%0%0%0%0%0%0%
Engineer (Junior/I) Direct Labor0%0%0%0%0%0%0%0%0%
Senior Analyst Direct Labor0%0%0%0%0%0%0%0%0%
Analyst (II/III) Direct Labor0%0%0%0%0%0%0%0%0%
Analyst (Junior/I) Direct Labor0%0%0%0%0%0%0%0%0%
Direct Labor Escalation0%0%0%0%0%0%0%0%0%
Fringe0%0%0%0%0%0%0%0%0%
Overhead0%0%0%0%0%0%0%0%0%
G&A0%0%0%0%0%0%0%0%0%
Material Burden0%0%0%0%0%0%0%0%0%
Subcontractor Burden0%0%0%0%0%0%0%0%0%
FCCOM0%0%0%0%0%0%0%0%0%
Material Escalation0%0%0%0%0%0%0%0%0%
NOTES:
The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs.

Section J - Exhibit L002: Historical/Proposed Rates Summary Schedule N00024-18-R-2236

Exhibit L003 Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006

Labor Category (or similar)% of Hours per YearFY19 RateFY 19 HoursFY20 RateFY 20 HoursFY21 RateFY 21 HoursFY22 RateFY 22 Hours
Program Manager1.25%
Project Manager5.00%
Design Manager5.00%
Lead Naval Architect/Hull Manager5.00%
Naval Architect5.00%
Chief Engineer/Mechanical and Electrical Engineer5.00%
Principal Engineer5.00%
Senior Engineer20.00%
Engineer (II/III)15.00%
Engineer (Junior/I)13.75%
Senior Analyst5.00%
Analyst (II/III)7.50%
Analyst (Junior/I)7.50%
Total Percentage100%
Composite Rate (by Year)$0.00$0.00$0.00$0.00
Total Estimated Hours Per Year5,00015,00025,0005,000
- 0- 0- 0- 0
NOTES:
Offeror to provide hours for Prime contractor work effort and each subcontract work effort utilizing the labor category breakout and % of hours per year provided above
Offerors total hours per year shall equate to the total estimated hours per year per Section L
The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs.

Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006 N00024-18-R-2236

File details come from the government source that posted it.