Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits.xlsx
XLSX spreadsheet 71 KB Posted
- Solicitation number
- N00024-18-R-2236
About this file
Attachment J-9
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CHAMP_RFP_Amendment_0003.pdf | ||
| Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits_Rev2.xlsx | XLSX spreadsheet | |
| N00024-18-R-2236_0002.pdf | ||
| Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits_Rev1.xlsx | XLSX spreadsheet | |
| Industry_Day_Registration_List_-_FINAL.xlsx | XLSX spreadsheet | |
| Attachment_J-8_CHAMP_DD254_Scan.pdf | ||
| N00024-18-R-2236_0001.pdf | ||
| Attachment_J-3_CHAMP_COR_CHANGE_RECOMMENDATION_FORM.docx | DOCX document | |
| Attachment_J-7_CHAMP_Deliverables_Schedule.pdf | ||
| Attachment_J-5_IDES_Access_and_PKIIA_Awareness_Attributes.pdf | ||
| Attachment_J-4_CHAMP_AoA_Table.docx | DOCX document | |
| N00024-18-R-2236.docx | DOCX document | |
| Attachment_J-8_CHAMP_Draft_DD254.pdf | ||
| Attachment_J-6_CHAMP_CDRL.pdf | ||
| Attachment_J-2_CHAMP_TRL_Table.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
| Section J Cost Exhibits L001 – L003 |
| Table of Contents |
| TAB NAME | EXHIBIT TITLE |
| Exhibit L001 | Section J - Exhibit L002: Cost Element Breakdown |
| Exhibit L002 | Section J - Exhibit L003: Historical/Proposed Rates Summary Schedule |
| Exhibit L003 | Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006 |
| Refer to Section L of the solicitation for instructions for completing these exhibits. |
Table of Contents N00024-15-R-4420
Attachment S-3
Exhibit L001 (CLIN 0001)
Section J - Exhibit L001: CLIN 0001 Cost Element Breakdown
| CLIN 00XX | |||
| ELEMENT OF COST | CY 20XX | ||
| Labor Hours | Rate | Dollars | |
| DIRECT LABOR | |||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 (as applicable) | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 (as applicable) | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 |
| INDIRECT COSTS | ||
| Fringe | % | $0.00 |
| Labor Overhead 1 | % | $0.00 |
| Labor Overhead 2 (as applicable) | % | $0.00 |
| Labor Overhead 3 (as applicable) | % | $0.00 |
| Total Indirect | $0.00 |
| MATERIAL | ||
| Direct Material | $0.00 | |
| Direct Material Escalation (as applicable) | % | |
| Material Indirect Costs (as applicable) | ||
| Total Material | $0.00 |
| SUBCONTRACTS | |||
| Subcontractor 1 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 |
| Subcontractor 7 | |||
| Total Subcontracts | 0 | $0.00 |
| OTHER COSTS | |
| Other Direct Costs | $0.00 |
| Total Other Costs | $0.00 |
Subtotal Costs $0.00
G&A % $0.00
Total Fee Bearing Cost $0.00
FCCOM % $0.00
Total Estimated Cost $0.00
| FIXED FEE | ||
| Non material Fee (Indicate percentage proposed) | % | $0.00 |
| Material Fee Only (indicate percentage proposed) | $0.00 | |
| $0.00 | ||
| Total Price (Including Fee) | $0.00 |
Total Labor Hours 0
| GRAND TOTAL | $0.00 |
| NOTES: | |
| The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs. | |
| Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement | |
| Could require multiple calandar years |
Apply as many subcontractors as required.
Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236
Exhibit L001 (CLIN 0002)
Section J - Exhibit L001: CLIN 0002 Cost Element Breakdown
| CLIN 00XX | |||
| ELEMENT OF COST | CY 20XX | ||
| Labor Hours | Rate | Dollars | |
| DIRECT LABOR | |||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 (as applicable) | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 (as applicable) | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 |
| INDIRECT COSTS | ||
| Fringe | % | $0.00 |
| Labor Overhead 1 | % | $0.00 |
| Labor Overhead 2 (as applicable) | % | $0.00 |
| Labor Overhead 3 (as applicable) | % | $0.00 |
| Total Indirect | $0.00 |
| MATERIAL | ||
| Direct Material | $0.00 | |
| Direct Material Escalation (as applicable) | % | |
| Material Indirect Costs (as applicable) | ||
| Total Material | $0.00 |
| SUBCONTRACTS | |||
| Subcontractor 1 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 |
| Subcontractor 7 | |||
| Total Subcontracts | 0 | $0.00 |
| OTHER COSTS | |
| Other Direct Costs | $0.00 |
| Total Other Costs | $0.00 |
Subtotal Costs $0.00
G&A % $0.00
Total Fee Bearing Cost $0.00
FCCOM % $0.00
Total Estimated Cost $0.00
| FIXED FEE | ||
| Non material Fee (Indicate percentage proposed) | % | $0.00 |
| Material Fee Only (indicate percentage proposed) | $0.00 | |
| $0.00 | ||
| Total Price (Including Fee) | $0.00 |
Total Labor Hours 0
| GRAND TOTAL | $0.00 |
| NOTES: | |
| The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs. | |
| Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement | |
| Could require multiple calandar years |
Apply as many subcontractors as required.
Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236
Exhibit L001 (CLIN 0003)
Section J - Exhibit L001: CLIN 0003 Cost Element Breakdown
| CLIN 00XX | |||
| ELEMENT OF COST | CY 20XX | ||
| Labor Hours | Rate | Dollars | |
| DIRECT LABOR | |||
| Direct Labor Rate 1 | 0 | $0.00 | $0.00 |
| Direct Labor Rate 2 (as applicable) | 0 | $0.00 | $0.00 |
| Direct Labor Rate 3 (as applicable) | 0 | $0.00 | $0.00 |
| Total Direct Labor | 0 | $0.00 |
| INDIRECT COSTS | ||
| Fringe | % | $0.00 |
| Labor Overhead 1 | % | $0.00 |
| Labor Overhead 2 (as applicable) | % | $0.00 |
| Labor Overhead 3 (as applicable) | % | $0.00 |
| Total Indirect | $0.00 |
| MATERIAL | ||
| Direct Material | $0.00 | |
| Direct Material Escalation (as applicable) | % | |
| Material Indirect Costs (as applicable) | ||
| Total Material | $0.00 |
| SUBCONTRACTS | |||
| Subcontractor 1 | 0 | $0.00 | $0.00 |
| Subcontractor 2 | 0 | $0.00 | $0.00 |
| Subcontractor 3 | 0 | $0.00 | $0.00 |
| Subcontractor 4 | 0 | $0.00 | $0.00 |
| Subcontractor 5 | 0 | $0.00 | $0.00 |
| Subcontractor 6 | 0 | $0.00 | $0.00 |
| Subcontractor 7 | |||
| Total Subcontracts | 0 | $0.00 |
| OTHER COSTS | |
| Other Direct Costs | $0.00 |
| Total Other Costs | $0.00 |
Subtotal Costs $0.00
G&A % $0.00
Total Fee Bearing Cost $0.00
FCCOM % $0.00
Total Estimated Cost $0.00
| FIXED FEE | ||
| Non material Fee (Indicate percentage proposed) | % | $0.00 |
| Material Fee Only (indicate percentage proposed) | $0.00 | |
| $0.00 | ||
| Total Price (Including Fee) | $0.00 |
Total Labor Hours 0
| GRAND TOTAL | $0.00 |
| NOTES: | |
| The Offeror must adjust the specific cost elements to reflect their accounting system and proposed costs. | |
| Offeror to replicate cost exhibit L001 template and submit separate exhibits for all CLINs utilized for the CHAMP procurement | |
| Could require multiple calandar years |
Apply as many subcontractors as required.
Section J - Exhibit L001: Cost Element Breakdown N00024-18-R-2236
Exhibit L002 Section J - Exhibit L002: Historical/Proposed Rates Summary Schedule
| RATE | Historical Rate | Proposed Rate | ||||||||
| CY 2014 | CY 2015 | CY 2016 | CY 2017 | CY 2018 | CY 2019 | CY 2020 | CY 2021 | CY 2022 | CY 2021 |
| Program Manager Direct Labor | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Project Manager Direct Labor | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Design Manager Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Lead Naval Architect/Hull Manager Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Naval Architect Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Chief Engineer/Mechanical and Electrical Engineer Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Principal Engineer Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Senior Engineer Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Engineer (II/III) Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Engineer (Junior/I) Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Senior Analyst Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Analyst (II/III) Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Analyst (Junior/I) Direct Labor | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Direct Labor Escalation | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Fringe | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Overhead | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| G&A | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Material Burden | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Subcontractor Burden | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| FCCOM | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| Material Escalation | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% | 0% |
| NOTES: | |||||||||
| The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs. |
Section J - Exhibit L002: Historical/Proposed Rates Summary Schedule N00024-18-R-2236
Exhibit L003 Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006
| Labor Category (or similar) | % of Hours per Year | FY19 Rate | FY 19 Hours | FY20 Rate | FY 20 Hours | FY21 Rate | FY 21 Hours | FY22 Rate | FY 22 Hours |
| Program Manager | 1.25% | ||||||||
| Project Manager | 5.00% | ||||||||
| Design Manager | 5.00% | ||||||||
| Lead Naval Architect/Hull Manager | 5.00% | ||||||||
| Naval Architect | 5.00% | ||||||||
| Chief Engineer/Mechanical and Electrical Engineer | 5.00% | ||||||||
| Principal Engineer | 5.00% | ||||||||
| Senior Engineer | 20.00% | ||||||||
| Engineer (II/III) | 15.00% | ||||||||
| Engineer (Junior/I) | 13.75% | ||||||||
| Senior Analyst | 5.00% | ||||||||
| Analyst (II/III) | 7.50% | ||||||||
| Analyst (Junior/I) | 7.50% | ||||||||
| Total Percentage | 100% | ||||||||
| Composite Rate (by Year) | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Total Estimated Hours Per Year | 5,000 | 15,000 | 25,000 | 5,000 | |||||
| - 0 | - 0 | - 0 | - 0 | ||||||
| NOTES: | |||||||||
| Offeror to provide hours for Prime contractor work effort and each subcontract work effort utilizing the labor category breakout and % of hours per year provided above | |||||||||
| Offerors total hours per year shall equate to the total estimated hours per year per Section L | |||||||||
| The Offeror must add and/or adjust specific rate categories to reflect their accounting system and proposed costs. |
Section J - Exhibit L003 Labor Category Rates and Hours for Option CLINs 0003 through 0006 N00024-18-R-2236
File details come from the government source that posted it.