Attachment_J-7_CHAMP_Deliverables_Schedule.pdf
PDF 139 KB Posted
- Attached to
- Common Hull Auxiliary Multi-Mission Platform (CHAMP) Federal contract opportunity
- Solicitation number
- N00024-18-R-2236
About this file
Attachment J-7
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CHAMP_RFP_Amendment_0003.pdf | ||
| Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits_Rev2.xlsx | XLSX spreadsheet | |
| N00024-18-R-2236_0002.pdf | ||
| N00024-18-R-2236_0001.pdf | ||
| Industry_Day_Registration_List_-_FINAL.xlsx | XLSX spreadsheet | |
| Attachment_J-8_CHAMP_DD254_Scan.pdf | ||
| Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits_Rev1.xlsx | XLSX spreadsheet | |
| Attachment_J-2_CHAMP_TRL_Table.pdf | ||
| Attachment_J-8_CHAMP_Draft_DD254.pdf | ||
| N00024-18-R-2236.docx | DOCX document | |
| Attachment_J-6_CHAMP_CDRL.pdf | ||
| Attachment_J-3_CHAMP_COR_CHANGE_RECOMMENDATION_FORM.docx | DOCX document | |
| Attachment_J-5_IDES_Access_and_PKIIA_Awareness_Attributes.pdf | ||
| Attachment_J-4_CHAMP_AoA_Table.docx | DOCX document | |
| Attachment_J-9__CHAMP_Section_L_CostPrice_Exhibits.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-18-R-2236 Attachment J-7
DISTRIBUTION STATEMENT A: Approved for public release. Distribution unlimited.
Common Hull Auxiliary Multi-Mission Platform (CHAMP) Contract Data Requirements List Deliverable Schedule
X = First or Recurring Submission R = Revision
Design deliverables should be submitted no later than 21 days prior to the status reviews.
Month DI # 1 2 3 4 5 6
7 8 9 10 11 12 13 14 15 16 17 18
Post Award Conference Agenda, Presentation and Minutes
DI‐1 X X
Review Agendas, Presentation and Minutes DI‐2 X X X X X X Management Plan and Schedule DI‐3 X X X Regulatory Body Correspondence DI‐4 As sent or received Circular of Requirements Change Recommendations DI‐5 As identified Status Report DI‐6 X X X X X X X X X X X X X X X X X X Concept Baseline Definition Report DI‐7 X R Commonality and Open Systems Architecture Approach Report
DI‐8 X R R R R R
Design Description Report DI‐9 X R R R R COR Compliance Report DI‐10 X R R R R Regulatory Body Issues Report DI‐11 X R R R R Affordability Studies Report DI‐12 X R R R Procurement Cost and Schedules Report DI‐13 X R R R General Arrangements Drawing DI 14‐1 X R R R R R Mission Space Square, Volume, Deck Heights and Access/Proximity Report
DI 14‐2 X R R R R R
Topside Arrangement Drawing DI 14‐3 X R R Area Volume Report DI 14‐4 X R R R Tankage Report DI 14‐5 X R R R Major Equipment List DI‐15 X R R R Hydrodynamic Speed and Power Analysis Report DI 16‐1 X R R R R Hydrodynamic Seakeeping and Maneuvering Report DI 16‐2 X R R R Hydrodynamic Model Test Program Plan DI 16‐3 X R R R Hull Lines Drawing and Offsets Database DI 16‐4 X R R R R R Intact and Damage Stability Report DI 16‐5 X R R R R
DISTRIBUTION STATEMENT A: Approved for public release. Distribution unlimited.
Endurance and Fuel Consumption Calculations DI 16‐6 X R R R Sustainment Assessment DI‐17 X Weight Estimate DI‐18 X R R R R Verification of Design Weight/KG plus Service Life Allowances not Exceeding Naval‐Architecture Limits of
COR
DI‐19 X R R R
Survivability DI‐20 X R R R Midship Section Drawing DI 22‐1 X R R R R Typical Sections Drawing DI 22‐2 X R R Shell Expansion Drawing DI 22‐3 X R R Hull Deck, Platform and Longitudinal Bulkhead Scantling Drawing
DI 22‐4 X R R
Superstructure Scantling Drawing DI 22‐5 X X R Hull Girder Longitudinal Strength Analysis DI 22‐6 X R R R Structural Design Criteria Report DI 22‐7 X R R R R Main Machinery Study Report DI 23‐1 X R R R Machinery Arrangement (including Uptake Space) DI 23‐2 X R R R Major Machinery Equipment List (MMEL) DI 23‐3 X R R Electric Plant Load Analysis (EPLA) DI 23‐4 X R R R R Electrical One‐Line Block Diagram DI 23‐5 X R R Equipment Removal Drawing DI 23‐6 X R HVAC and Refrigeration Systems Design Report DI 25‐1 X R R R Auxiliary Systems Design Report DI 25‐2 X R Firefighting Systems Design Report DI 25‐3 X R R R Anchoring, Mooring and Towing Drawing DI 25‐4 X R Lifeboat, Liferaft, Rescue Boat, and Ship’s Boats Drawing DI 25‐5 X R R Replenishment and Strikeup/Strikedown Design Report DI 25‐6 X R Mission Crane Systems Design Report DI 25‐7 X R R R Stern Ramp and Side Port Design Report DI 25‐8 X R R R Vehicle Maneuvering and Services Design Report DI 25‐9 X R R R Force Package Embarkation and Debarkation and Services Design Report
DI 25‐10 X R R
Aviation Facility Design Report DI 25‐11 X R R R Habitability Design Report Including Sample Space Arrangements
DI 26‐1 X R R
DISTRIBUTION STATEMENT A: Approved for public release. Distribution unlimited.
Service Space and Workshop Design Report Including Sample Space Arrangements
DI 26‐2 X R R
Mission Space Design and Services Report DI 26‐3 X R R