Attachment J-12 - Quality Assurance Surveillance Form for FF.pdf

PDF 56 KB Posted

Attached to
Maintenance Support for Inactive Ships in Bremerton, WA and CG/LSD Modernization Support in San Diego, CA
Solicitation number
N00024-17-R-4404
Issued by

About this file

Attachment J-12

View the file

Other files

File Type Posted
N0002417C4404_J&A_Redacted.pdf PDF
N00024-17-R-4404_Amendment_0003.docx.pdf PDF
Attachment_S-3_-_Past_Performance_Questionnaire.docx DOCX document
N00024-17-R-4404_Conformed_RFP_through_Amendment_0003.pdf PDF
Bidder's_Q&A__3.pdf PDF
CDRL49-52.pdf PDF
N00024-17-R-4404_Amendment_00002.pdf PDF
Attachment_S-3_-_Past_Performance_Questionnaire.docx DOCX document
CDRL45-48.PDF PDF
Bidder's_Q&A__2.pdf PDF
N00024-17-R-4404_Conformed_through_A0002.pdf PDF
Attachment_S-6_Pre_Award_Accounting_System_Checklist.docx DOCX document
Bidder's_Q&A__1.pdf PDF
N00024-17-R-4404_Amendment_0001.docx.pdf PDF
Attachment J-2 - Safe Stowage Check-off List.pdf PDF
Attachment J-6 and J-7 Government Furnished Property.pdf PDF
Attachment J-3 - Repair Request Work Order —
Attachment J-18 - Mooring and Security Inspection Log.xlsx XLSX spreadsheet
Attachment J-23 - Quality Assurance Surveillance Plan.pdf PDF
Attachment J-1 - List of assigned Vessels.XLS XLS spreadsheet
Attachment J-19 - Strike Ship Check-off List.pdf PDF
N00024-17-R-4404.pdf PDF
Attachment J-14 - Arrival Inspection Check-Off Sheet.pdf PDF
Attachment J-11 - Quality Assurance Surveillance Form for DH.pdf PDF
Attachment S-2 - Past Performance Data.docx DOCX document
Attachment J-13 - Integrity Inspection.pdf PDF
Attachment J-20 - Polychlorinated Biphenyl —
Attachment J-16 - Security Violation Report.pdf PDF
Attachment S-3 - Past Performance Questionnaire.docx DOCX document
Attachment J-22 - Contract Security Classification Specification, DD Form 254.pdf PDF
Attachment J-15 - Inspection of Disposal Vessel.pdf PDF
Exhbt A - DD Form 1423, Contract Data Requirements List.pdf PDF
Attachment S-5 DCAA Rate Check Form.xls XLS spreadsheet
Attachment J-5 - Janitorial Task and Frequency Chart.XLS XLS spreadsheet
Attachment S-4 - Staffing_Plan_(No_Cost).xlsx XLSX spreadsheet
Attachment J-10 - Quality Assurance Surveillance Form for CP.pdf PDF
Attachment J-17 - CO2 Fire Extinguisher and Dry Chemical Inspection Log.pdf PDF
Attachment S-1- Pricing Worksheet.xls XLS spreadsheet
N00024-17-R-4404_and_N00024-17-R-4410_QA.docx DOCX document
N00024-17-R-4404_DRAFT_STATEMENT_OF_WORK.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 12

Periodicity: Spec Code: Berthed At: Quarter:

NSTM 50 INSPECTION GUIDELINES FF1 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Check continuity of each heat, smoke and flood alarm circuit at the control panel. Record results below. Are all readings satisfactory?

2 Have all other discrepancies been reported? If not report them here.

F/F Continuity

FWD Draft: AFT Draft: List:

Comments:

Inspector Inspector Inspection Manager

Circuit Continuity Test Results

SW No. Cir Type K Ohm Test Location

Sat Unsat

SW No. Cir Type K Ohm Test Location

Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

Sat Unsat Sat Unsat

NSTM 50 INSPECTION GUIDELINES - Discrepancy Listing

Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

NSTM 50 INSPECTION GUIDELINES FF2 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Audible alarm and alarm light are activated by the test switch?

2 Is the power available light energized at all times except during continuity testing ?

3 Does test switch indicate proper vessel and alarm on remote monitoring computer; can alarm be silenced from remote monitoring computer?

4 Have all other discrepancies been reported? If not report them here.

Fire Panel

FWD Draft: AFT Draft: List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES FF3 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

2 Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

3 All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

4 Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

5 Visual and audible alarms activate when the sensor is actuated.

6 Each fire wire heat sensor is activated.

7 Each smoke detector is activated using canned smoke to ensure its proper operation.

8 Have all other discrepancies been reported? If not report them here.

Flood Tip Float (MOB B)

FWD Draft: AFT Draft: List:

NSTM 50 INSPECTION GUIDELINES FF4 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Visual and audible alarms activate when the sensor is actuated.

2 Activate all flooding sensors by tipping floats or shorting probes to check for proper operation.

3 Are sensor cutout switches numbered and chart present? Do cutouts isolate alarms circuit as indicated on chart?

4 All sensors operated mannually indicate proper vessel and location on remote monitoring systems.

5 Are Fire/Flood sensors correctly located in respect to electrical power and water tight sub-division of a ship?

6 Each heat sensor is activated using a hot air gun to ensure its proper operation. (exercise extreme caution to prevent damage to heat dectecting element due to overheating)

7 Each smoke detector is activated using canned smoke to ensure its proper operation.

8 Have all other discrepancies been reported? If not report them here.

Flood Tip Float (Non MOB B)

FWD Draft: AFT Draft: List:

File details come from the government source that posted it. Updated .