Attachment J-10

View the file

Other files

File Type Posted
N0002417C4404_J&A_Redacted.pdf PDF
N00024-17-R-4404_Amendment_0003.docx.pdf PDF
Attachment_S-3_-_Past_Performance_Questionnaire.docx DOCX document
N00024-17-R-4404_Conformed_RFP_through_Amendment_0003.pdf PDF
Bidder's_Q&A__3.pdf PDF
CDRL49-52.pdf PDF
N00024-17-R-4404_Amendment_00002.pdf PDF
Attachment_S-3_-_Past_Performance_Questionnaire.docx DOCX document
CDRL45-48.PDF PDF
Bidder's_Q&A__2.pdf PDF
N00024-17-R-4404_Conformed_through_A0002.pdf PDF
Attachment_S-6_Pre_Award_Accounting_System_Checklist.docx DOCX document
Bidder's_Q&A__1.pdf PDF
N00024-17-R-4404_Amendment_0001.docx.pdf PDF
Attachment J-2 - Safe Stowage Check-off List.pdf PDF
Attachment J-6 and J-7 Government Furnished Property.pdf PDF
Attachment J-3 - Repair Request Work Order —
Attachment J-18 - Mooring and Security Inspection Log.xlsx XLSX spreadsheet
Attachment J-23 - Quality Assurance Surveillance Plan.pdf PDF
Attachment J-1 - List of assigned Vessels.XLS XLS spreadsheet
Attachment J-19 - Strike Ship Check-off List.pdf PDF
N00024-17-R-4404.pdf PDF
Attachment J-14 - Arrival Inspection Check-Off Sheet.pdf PDF
Attachment J-11 - Quality Assurance Surveillance Form for DH.pdf PDF
Attachment S-2 - Past Performance Data.docx DOCX document
Attachment J-13 - Integrity Inspection.pdf PDF
Attachment J-12 - Quality Assurance Surveillance Form for FF.pdf PDF
Attachment J-20 - Polychlorinated Biphenyl —
Attachment J-16 - Security Violation Report.pdf PDF
Attachment S-3 - Past Performance Questionnaire.docx DOCX document
Attachment J-22 - Contract Security Classification Specification, DD Form 254.pdf PDF
Attachment J-15 - Inspection of Disposal Vessel.pdf PDF
Exhbt A - DD Form 1423, Contract Data Requirements List.pdf PDF
Attachment S-5 DCAA Rate Check Form.xls XLS spreadsheet
Attachment J-5 - Janitorial Task and Frequency Chart.XLS XLS spreadsheet
Attachment S-4 - Staffing_Plan_(No_Cost).xlsx XLSX spreadsheet
Attachment J-17 - CO2 Fire Extinguisher and Dry Chemical Inspection Log.pdf PDF
Attachment S-1- Pricing Worksheet.xls XLS spreadsheet
N00024-17-R-4404_and_N00024-17-R-4410_QA.docx DOCX document
N00024-17-R-4404_DRAFT_STATEMENT_OF_WORK.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 10

Periodicity: Spec Code: Berthed At: Quarter:

NSTM 50 INSPECTION GUIDELINES CP1 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Power supply readings have been taken and recorded and are satisfactory.

2 System has been checked for shorts and opens and none were found.

3 Have all other discrepancies been reported? If not report them here.

C/P Rectifier

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft: AFT Draft: List:

Comments:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES - Descrepancy Listing

Spec Code:

Line Item # Location Discrepancy Discovery Dt Correction Dt

NSTM 50 INSPECTION GUIDELINES CP2 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Take and record hull potential readings every 50 feet and record. All readings fall within the range of 0.8 to 1.2 volt range.

2 Current readings to each anode have been checked and are normal? Record readings.

3 Are support cords for anodes taking strain off cable?

4 Reference cell has been checked against shop standard cell and is satisfactory.

5 Potentiometer-voltmeter has been checked against a standard Weston cell or a battery with a known voltage and is within specifications or adjustments have been made to bring within specs.

6 Have all other discrepancies been reported? If not report them here.

C/P Potential

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft: AFT Draft: List:

Inspector Inspector Inspection Manager

Cathodic Protection Anode Results

Number

Cathodic Protection Hull Potential Results

Output Number Output Number Output Number Output

Number Hull Reading Number Number Number Hull Reading Hull Reading Hull Reading

NSTM 50 INSPECTION GUIDELINES CP3 Insp Date:

TDL Remarks N/A NO YES Description Item

1 Check power supply ammeters and voltmeters against a suitable calibrated meter. Were results within specifications ?

2 Remove dust and debris from power supply enclosures. Is the general condition satisfactory ?

3 (Automatic hull potential control only) Check reference electrode on the unit against a standard cell. Is the error

0.05 volts or less compared to standard silver-silver chloride reference cell?

4 Clean all exposed terminal connection, ship bonds, rectifier connections, ground return connections by sandpapering.

Have all listed connections been sandpapered and in good condition?

5 All ships in nest have CP installed.

6 Are there 2 bonding cables installed, one fwd and one aft between ships. (Ships over 400 foot long require a third bonding cable in the middle)

7 Have all other discrepancies been reported? If not report them here.

C/P System Check

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft: AFT Draft: List:

Inspector Inspector Inspection Manager

NSTM 50 INSPECTION GUIDELINES CP4 Insp Date:

TDL Remarks N/A NO YES Description Item

1 (Automatic hull pontential control only) Record the date the reference electrode was installed. Does the reference electrode require replacement ? (must be replaced every 5 years)

2 Have all other discrepancies been reported? If not report them here.

C/P Electrode (Auto Systems)

1. Annode Type Installed:

2. Number of Annodes:

3. System Arrangements:

4. Time:

5. Tide:

6. Hull Potential (high):

6a. Hull Potential (low):

7. Power Supply Output (volts):

7a. Power Supply Output (amps):

8. Ag/AgCI Reference Cell Potential: MV:

9. Ships and Floats Moored together have at least 2 Bonding Straps Each:

10. Wetted Area:

FWD Draft: AFT Draft: List:

Inspector Inspector Inspection Manager

Cathodic Protection Anode Results

Number

Cathodic Protection Hull Potential Results

Output Number Output Number Output Number Output

Number Hull Reading Number Number Number Hull Reading Hull Reading Hull Reading