J-8_LCS_FM_CC_WI_Spec_897-11-002.docx
DOCX document 31 KB Posted
- Attached to
- LCS Sustainment West Coast Multiple Award Indefinite Delivery Indefinite Quantity (MAC-IDIQ)-RFP
- Solicitation number
- N00024-17-R-4325
About this file
J-8 LCS FM_CC WI Spec 897-11-002
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Facilities Maintenance Work Specification Template
| Ship: LCS CLASS | ITEM NO.897-11-002 | |||
| COAR: N/A | PCN: None | |||
| CWT FILE NO: | CMP: N/A | |||
| REVISED: 20150623 | PLANNER: N/A |
1. SCOPE:
1.1. Title: Littoral Combat Ship Facilities Maintenance (FM) and Corrosion Control; accomplish
1.2. Location of Work
1.2.1. Throughout the Ship
1.3. Identification
1.3.1. Not Applicable
1.4 (Security as required)
2. REFERENCES
2.1. Standard Items
2.2. NAVSEA S6480-A4-CAT-010: Authorized Chemical Cleaning Products and Dispensing Systems Catalog
2.3 COMLCSRONONEINST 4790.8 Littoral Combat Ship Compartment Cleaning Plan
3. REQUIREMENTS:
3.1. Accomplish Housekeeping and Industrial Cleaning in locations as designated by the SUPERVISOR in accordance with 2.2 and 2.3.
3.1.1. Submit one legible copy, in approved transferrable media, of an FM Surveillance Log to be used as a means of planning, tracking, and coordinating the accomplishment of contractor work no later than 7 days prior to the start of work.
3.1.2. The FM Surveillance Log shall be revised daily to include additions, deletions, modifications, progress, and completions.
3.1.2.1. Submit one legible copy, in approved transferrable media, of the revised FM Surveillance Log when requested by the SUPERVISOR.
3.1.3. Accomplish a visual inspection of each space to be cleaned for existing preservation coating, areas of corrosion or deterioration, and missing/damaged/deteriorated lagging.
3.1.3.1. Submit one legible copy, in hard copy or approved transferrable media, of a report listing results of the requirements of 3.1.2 to the SUPERVISOR.
3.2. Accomplish the requirements of 009-32 of 2.1 (specific table) for XX square footage as designated by the SUPERVISOR.
3.3. Remove existing and install new a total of XX square feet of bulkhead plating, XX linear feet of 8 inch firemain lagging, XX linear feet of 6 inch chill water or firemain lagging, XX linear feet of 4 inch chill water or firemain lagging, and XX linear feet of one inch or 2 inch chill water or firemain lagging as designated by the SUPERVISOR
3.3.1. Accomplish the requirements of 009-11 of 2.1.
4. NOTES: None.
5. GOVERNMENT FURNISHED MATERIAL (GFM)
5.1. None.
SERMC Draft Revised 6/25/2015 SERMC Draft Revised 6/25/15
File details come from the government source that posted it. Updated .